VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS. VALUE BENEFITS RETRO-COMMISSIONING EXISTING BUILDINGS TIM CORBETT Chair, ASHRAE Special Guideline Program Committee 0 The Commissioning Process. VALUE BENEFITS - RETRO-COMMISSIONING - EXISTING BUILDINGS.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS' - holmes-hatfield


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Value benefits retro commissioning existing buildings
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

VALUE BENEFITS

RETRO-COMMISSIONING

EXISTING BUILDINGSTIM CORBETT

Chair, ASHRAE Special Guideline Program Committee 0

The Commissioning Process


Value benefits retro commissioning existing buildings1
VALUE BENEFITS - RETRO-COMMISSIONING - EXISTING BUILDINGS

  • UNDERSTANDING RETRO-COMMISSIONING (RETRO-Cx) BEGINS WITH UNDERSTANDING COMMISSIONING (Cx)

    • THERE ARE TWO BASIC TYPES OF Cx: TOTAL PROJECT Cx AND SYSTEMS AND EQUIPMENT Cx

    • (Definition: Construction Specification Institute)

      • TOTAL PROJECT Cx (BEGINS AT PROJECT CONCEPTION)

      • SYSTEMS AND EQUIPMENT (START-UP Cx)


Value benefits retro commissioning existing buildings2
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

  • TOTAL PROJECT (FACILITY) COMMISSIONING (Cx)

  • TOTAL PROJECT (FACILITY) COMMISSIONING, ALSO REFERRED TO AS TOTAL FACILITY COMMISSIONING, BEGINS DURING PROJECT CONCEPTION AND CONTINUES THROUGH FACILITY MANAGEMENT AND USE.

  • TOTAL PROJECT COMMISSIONING DOCUMENTS THE OWNER’S FACILITY CRITERIA AND VERIFIES THAT THE CRITERIA ARE ACHIEVED AND THAT THE FACILITY IS PLACED INTO PROPER OPERATION.


Value benefits retro commissioning existing buildings3
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

  • SYSTEM AND EQUIPMENT COMMISSIONING IS:

  • A DETAILED OPERATIONAL TESTING, ADJUSTING, AND TRAINING OF SPECIFIC SYSTEMS OR EQUIPMENT TO ENSURE THEIR READINESS FOR USE IN THE COMPLETED FACILITY.

    • NOT IMPLEMENTED AT PROJECT CONCEPTION

    • A METHOD OF DETERMINING FINAL ACCEPTANCE

    • ONLY DOCUMENTS CONDITIONS AT OCCUPANCY


Value benefits retro commissioning existing buildings4
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

  • ASHRAE DEFINITION OF THE Cx PROCESS

  • A METHOD TO IMPROVE THE DELIVERY OF A PROJECT, FOCUSING ON QUALITY, THE METHOD INCLUDES MAKING SURE THAT ALL COMPONENTS OF THE BUILDING ARE PLANNED, INSTALLED, AND MAINTAINED ACCORDING TO THE OWNER’S REQUIREMENTS.

  • THE TOTAL PROJECT COMMISSIONING AND TOTAL BUILDING COMMISSIONING GO BEYOND NORMAL VERIFICATION OF ALL FACILITY SYSTEMS FOR PERFORMANCE AND INCLUDE THE ENTIRE PROJECT OR BUILDING


Value benefits retro commissioning existing buildings5
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

  • APPLYING RETRO-COMMISSIONING (RETRO-Cx) TO EXISTING FACILITIES

  • NOT A RE-Cx OF CONDITIONS AT FACILITY FINAL ACCEPTANCE

  • NOT A FACILITY TUNE-UP OR EVALUATION

  • NOT LIMITED TO BUILDING MECHANICAL/ELECTRICAL SYSTEMS

  • NOT LIMITED TO OPTIMIZATION OF EXISTING PROCEEDURES OR SYSTEMS

  • BUT MORE


Value benefits retro commissioning existing buildings6
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

  • APPLYING RETRO-Cx TO EXISTING FACILITIES

  • GATHER AND ORGANIZE ALL EXISTING DOCUMENTATION (PLANNING)

  • IDENTIFY CHANGES IN USE AND CURRENT FACILITY REQUIREMENTS (DISCOVERY OF ROOT CAUSE)

  • BUDGET AND PUT BEST OPTIONS INTO IMPLEMENTATION PLAN (PROJECT DELIVERY)

  • MEET AND ACCEPT ESTABLISHED GOALS FOCUS A METHODS TO OPTIMIZE VALUE (PERSISTENCE)


Value benefits retro commissioning existing buildings7
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

COMPARING Cx METHODS IN NEW/EXISTING FACILITIES

NEW – OWNER PROJECT REQUIREMTENTS

PRE-DESIGN

DESIGN

CONSTRUCTION

POST-OCCUPANCY

  • EXISTING – CURRENT FACILITY REQUIREMENTS

    • PLANNING

    • INVESTIGATION

    • IMPLEMENTATION

    • HAND-OFF

    • PERSISTANCE


Value benefits retro commissioning existing buildings8
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

FACILITY OWNER’S RESPONSIBILITIES:

1. DEVELOP GOALS AND PROJECT OBJECTIVES

2. DEVELOP A SCOPE OF WORK (CURRENT FACILITIES REQUIREMENTS)

3. HIRE OR ASSIGN THE Cx AUTHORITY

4. SUPPORT THE RETRO-Cx TEAM FINDINGS

5. CLEARLY ARTICULATE THE FACILITY’S INTENDED USE

6. PROVIDE INFORMATION AND FUNDING RESOURCES NEEDED


Value benefits retro commissioning existing buildings9
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

RETRO-Cx AUTHORITY RESPONSIBILITIES

THE RETRO-Cx PLAN

THE RETRO-Cx PLAN IS THE DOCUMENT DEFINING THE PROJECT’S

GOALS, SCOPE, SCHEDULE, DOCUMENTATION REQUIREMENTS,

ROLES. AND TASKS OF THE RETRO-Cx TEAM MEMBERS


Value benefits retro commissioning existing buildings10
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

  • AT A MINIMUM, THE RETRO-Cx PLAN SHOULD INCLUDE:

  • • GENERAL BUILDING INFORMATION AND CONTACT INFORMATION

  • • GOALS AND SCOPE OF THE PROJECT

  • BRIEF BUILDING AND SYSTEM DESCRIPTIONS, LISTING SYSTEMS INVESTIGATED, CONCLUSIONS, AND APPLICATIONS OF FACILITY OWNER REQUIREMENTS

  • LIST OF TEAM MEMBERS, RESPONSIBILITIES, AND DELIVERABLES

  • • METHODS OF COMMUNICATION, REPORTING, AND PROTOCOLS


Value benefits retro commissioning existing buildings11
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

AT A MINIMUM, THE RETRO- Cx PLAN SHOULD INCLUDE: (CONT)

  • SCHEDULE OF PROJECT MILESTONES

  • • DOCUMENTATION REQUIREMENTS AND RESOURCES

  • • INVESTIGATION SCOPE, METHODS, AND CORRECTIVE ACTIONS

  • • IMPLEMENTATION OF SEASONAL VERIFICATION

  • • PROJECT HAND-OFF ACTIVITIES


Value benefits retro commissioning existing buildings12
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

RETRO-Cx AUTHORITY RESPONSIBILITIES

FINAL REPORT

THE FINAL REPORT IS A SUMMARY OF THE PROJECT AND PROVIDES

A RECORD OF THE RETRO-Cx ACTIVITIES AND RECOMMENDATIONS

FOR MONITORING AND MAINTAINING THE IMPLEMENTED MEASURES.


Value benefits retro commissioning existing buildings13
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

AT A MINIMUM, THE RETRO- Cx FINAL REPORT SHOULD INCLUDE:

• EXECUTIVE SUMMARY

• PROJECT BACKGROUND

• A LISTING, WITH A DESCRIPTION OF FACILITY IMPROVEMENTS AND OPERATING PROCEDURES IMPLEMENTED

• ESTIMATES OF LIFECYCLE SAVINGS AND THE ACTUAL COSTS FOR EACH IMPROVEMENT IMPLEMENTED (SIMPLE PAYBACK)


Value benefits retro commissioning existing buildings14
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

THE RETRO- Cx FINAL REPORT SHOULD INCLUDE: (CONT)

• TRENDING AND DIAGNOSTIC/MONITORING PLAN, DOCUMENTING RESULTS

• ALL TESTING RESULTS

• RECOMMENDED RE-COMMISSIONING PLAN REFERENCING LIFECYCLE TESTING INFORMATION FROM RETRO- Cx ACTIVITIES

• COMPLETE DOCUMENTATION OF REVISED OR NEW STRATEGIES IMPLEMENTED

• A LIST OF CAPITAL IMPROVEMENTS RECOMMENDED FOR FUTURE ACTION


Value benefits retro commissioning existing buildings15
VALUE BENEFITS - RETRO-COMMISSIONING EXISTING BUILDINGS

  • AT THE CONCLUSION OF THE RETRO-CX PROGRAM

  • THE FACILITY OWNER ADDS VALUE TO THE OPERATION OF THE FACILITY BY:

  • IMPLEMENTION A PROGRAM OF M&V TO CONTINUE TO TRACK THE BENEFITS OF THE RETRO-Cx PROGRAM

  • HAVE IN PLACE A FUTURE RE-COMMISSIONING PLAN FOR MAINTAINING BENEFITS

  • AQUIRE THE TOOLS FOR MAINTAINING AND TRACKING EFFICIENT FACILITY OPERATION

  • REDUCE OPERATING COSTS AND THE FACILITY CARBON FOOTPRINT