An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Colorado River Basin Water Supply & Demand Study: An Arizona Perspective Marie S. Pearthree, P.E. Central Arizona Project Assistant General Manager Urban Water Institute August 15, 2013

  2. What is the Central Arizona Project? • 336-mile aqueduct brings Colorado River water from Lake Havasu to Tucson • 14 pumping plants lift water nearly 3000 feet • 11 underground pipelines • Lake Pleasant/New Waddell Dam • Delivers 1.6 million acre-feet of Colorado River water annually • Federal Reclamation Project operated and maintained by CAWCD • Single largest provider of Colorado River water to municipal and Native American users in the Basin

  3. Who Gets CAP Water (~1.6 MAF)? Cities – For residential, commercial and other customers Farms – For irrigation of crops Tribes– For on-reservation use, off-reservation storage, leases and other purposes (46% of CAP Supply) Recharge Projects – For annual and long-term storage

  4. Why the Central Arizona Project is So Active • CAP is the largest single Colorado River User within the boundaries of the watershed. • CAP has junior rights • CAP delivers to 80% (5.3 million) of Arizona’s population (approx. 1.6 MAF/yr) • CAP is critical to preventing groundwater overdraft and supports statewide recharge and replenishment functions

  5. Preparing for Shortages & Imbalances Adaptation • Augmentation • Weather Modification • Desalination • System Efficiency • Brock Reservoir • Minute 319 (Binational Agreement) • Vegetation Management • Arizona Water Banking • Recharge Projects • Reduce Demands • Continue conservation Planning • Research Activities • Climate Change • Feasibility Studies • Basin Study • Water Consv. Technology • Desal, Ag, M&I

  6. Shortage Sharing: Impacts to CAP

  7. Augmentation Needs • 1975 Study finds “natural supply” insufficient for growing demands unless Basin States were willing “to accept the limitation in water supply and pattern the economic and social future of the basin to that limitation.” Same study determined the only option to address future water needs is “to augment the flows of the Colorado River thus increasing its water supply and permitting continued growth of water dependent developments.” --Westside Study Report on Critical Water Problems Facing the Eleven Western States (U.S. Dept. of the Interior, April 1975)

  8. Augmentation Needs • Post 1975, BOR identified several augmentation options and proposals but none initiated • All seven Basin States renewed investigation of augmentation and feasible options, publishing a report in 2008 --Study of Long-Term Augmentation Options for the Water Supply of the Colorado River System (Seven Basin States, March 2008) • All four portfolios evaluated in 2012 Basin Study included augmentation components.

  9. Summary Basin Study – Options & Strategies • Augmentation • River imports • Desalination • Wx Mod/Watershed Management • Non-tributary groundwater • Recycling • Reduce Demands (Conservation) • M&I conservation • Ag conservation • Energy production conservation (dry-cooling) • Evaporation reduction (covers) • Modify Operations • Reservoir management • Water Banking • Ag-Urban transfers

  10. Water Importation Options • Replace Colorado River water to the Front Range with Mississippi or Missouri River water • Potential to address water issues at a regional and national scale • Long-term project but with opposition • Mississippi Annual Discharge ~ 425 maf • Colorado River Annual Supply ~ 15 maf

  11. Basin Study - Desalination Options • Binational desalination projects with Mexico • Southern California - Exchange • Yuma Area Brackish Water – Operating the Yuma Desalting Plant or alternatives • Salton Sea Brackish Water - Irrigation Drainage Water

  12. Sonora Desal Concept

  13. NOT An Alternative! SS Guenther

  14. Basin Study-Conservation and Reuse Options • No specific programs identified in the study • Central Arizona (AMAs)and Las Vegas lead the nation in municipal and industrial water conservation • Arizona leads the nation in irrigation efficiency • CAP and Arizona stakeholders continuing investments • Need to identify new programs and how to fund them • water conservation is not “free”

  15. Basin Study-A Call to Action: • Significant imbalances by 2060 • Potential for critical imbalances begin as early as 2025. • Imbalances are driven by climate change/prolonged droughts plus increasing demands. • Augmentation projects, increased conservation, and reuse can resolve the “average” imbalances – protecting the Colorado River and its users. • Implementation of large-scale projects and programs will take a more than a decade. • Efforts to develop augmentation, conservation and reuse programs and projects must begin now.

  16. Basin Study: Multi-faceted Call To Action • By implementing additional measures, projected future imbalances in supply and demand can be successfully managed • Multi-faceted approach required • Federal government must partner with states

  17. Questions? Marie S. Pearthree, P.E. 623-869-2111 mpearthree@cap-az.com