traffic and safety
Download
Skip this Video
Download Presentation
Traffic and Safety

Loading in 2 Seconds...

play fullscreen
1 / 4

Traffic and Safety - PowerPoint PPT Presentation


  • 118 Views
  • Uploaded on

Traffic and Safety. John Gill, Chair [email protected] Roads. Public meeting on roads (March 2012). Enbridge completed cast iron removal this summer. Environmental assessment contract has been awarded – work should take 12-18 months.  Road re-construction not likely before 2016.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Traffic and Safety' - hiroko


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
roads
Roads
  • Public meeting on roads (March 2012).
  • Enbridge completed cast iron removal this summer.
  • Environmental assessment contract has been awarded – work should take 12-18 months. 
  • Road re-construction not likely before 2016.
mildenhall safety
Mildenhall Safety
  • City painted white line on Mildenhall to aid pedestrian safety.
  • Meeting with the city (September 2012)
  • City will be maintaining where possible the asphalt beside the line
  • City is looking at a possible stop sign at Bayview Wood.
  • City is also looking at sight line obstructions on several roads in the area. 
air traffic noise
Air Traffic Noise
  • Meeting at John Carmichael’s office, Leaside residents, Pearson Airport, NAV CAN & Kathleen Wynne (October 2012).
  • NAV CAN has moved flight 1.8km south.
  • The noise abatements stay the same.
  • No changes below 3000 ft., altitudes the same or higher.
  • Traffic volume essentially the same.
  • Situation not likely to change before next review in four years if at all.
ad