An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Warm Welcome To SunLion Piping!

  2. Agenda • About SUNLION • 1.Stratagy Partners • 2.Products and Services • 3.Sales Supporting • 4.Project / Quality Management • 5.Production Control • 6.Logistics • 7.Documentation • 8.Main Performance

  3. Professional Clients Professional SunLion Team • About SunLion • SunLion Piping Engineering Co.,Ltd is one of the most respected global piping system material manufacturer and supplier, focus on supplying chain services for piping system projects of Oil & Gas transportation, Refinery & Chemical, Marine & Offshore , Platform , Nuclear & Wind Power markets. • Vision : Being the best international EPC Piping Supply Chain Supplier. • Mission: Training the top EPC Project Manager. Professional Manufacturer

  4. About SunLion Combined with CNPC-BSS & SINOPEC-Shashi Pipe Group, SunLion has become No.1 Welded Linepipe Supplier in China. SunLion can supply ERW/SAWH/SAWL/OCTG/Coil Tube Linepipe with 3LPE/3LPP/2FBE Coating. Our Mills are approved by Shell, Total, BP, Aramco, OGC, NIGC, ADCO,CCC, Petrofac, Fluor, ect. International Oil & Gas ,EPC companies.

  5. About SunLion Invested Chankang Steel Pipe Co.,Ltd and Shanghai HNFF Coating Co.,Ltd, SunLion has become No.1 Piling Pipe Supplier in China. SunLion can supply Sprial SAW and LSAW Piling Pipe with UHB Coating. Our Mills are approved by Worley Parson, Leighton, McConnell Dowell Constructors, ect. International EPC companies.

  6. About SunLion Combined with Valin , Baoteel , and TPCO SMLS Pipe Group, SunLion has become the first-class SMLS Pipe Supplier in China. SunLion can supply SMLS/OCTG Linepipe with 3LPE/3LPP/2FBE Coating. Our Mills are approved by Shell, Total, BP, Aramco, KOC, NIGC, ADCO,CCC, Petrofac, Fluor, ect. International Oil & Gas ,EPC companies.

  7. About SunLion Organization Structure General Manager Financial Dept. Sales Dept. Operation Dept. HR Dept. Engineering Production QA QC Logistics • Prepare MPS • Detail schedule • Monitor progress • Technical support • Detail Shop drawing • Variation control • Manuf contract • R&D • Prepare ITPs • Supplier Audit • Quality plan • Prepare MDRs • Prepare procedures • Review project TS • Project quality control • Shipping plan • Stowage plan • Shipping price • Ship booking • Supervising loading • Shipping document • Position update • Custom clearance • LC document • Proposal design • Review layout plan • Check shop drawing • Technical support • change order handling • Confirm project TS • R&D • Material insp & re-test • Calibracation insp • Personal qualif. Insp • Conduct ITP • Coordinate with TPI • NDE insp • Appearance & Dimension • Daily Insp. Report • NCR control • Release insp

  8. Sales Support Quality Management QA/QC Core values Of Operations Production Progress Follow-up Logistics Service Prequalification Of Suppliers Documentation Submittal About SunLion Operation Advantages • The major roles of SunLion Operations Team are: • Select the right suppliers to perform the order; • Supporting Sales to get the order; • Deliver the order products on schedule; • Deliver with required quality; • Provide logistics service; • Provide whole Manufacturing Data Records (MDRs).

  9. 1.Strategic Partners

  10. 2.Products and Services 2.1. SSAW (HSAW) Pipe 2.2. LSAW (DSAW) Pipe 2.3. ERW Pipe 2.4. SMLS Pipe 2.5. OCTG Tube 2.6. Pipe Bends and Fittings , Flanges, Valves 2.7. Pipe Coating

  11. 2.1 SSAW (HSAW) Pipe Diameter: 219mm-3250mm (8”-128”) Wall Thickness: 5mm-25.4mm (0.2”-1”) Length: 6m-80m Steel Grade: API PSL1: A, B, X42-X100 PSL2: BM, X42M-X100M

  12. 2.2 LSAW (DSAW) Pipe Diameter: JCOE / UOE: 323.9mm - 1524mm (12”-60”) TRIBAND: 800mm - 3500mm (32”-138”) Wall Thickness: JCOE / UOE: 6mm - 50mm (0.236”-1.969”) TRIBAND: 15mm - 120mm (0.6” - 4.72”) Length: 2.5m-80m Steel Grade: API PSL1: A, B, X42-X100 API PSL2: BM, X42M-X100M ASTM: A139, A252, A53, A572, A671, A672, A691

  13. 2.3 ERW/HFW Pipe Diameter: 25.4mm-660mm (1”-26”) Wall Thickness: 0.6mm-22.2mm (0.024”-0.874”) Steel Grade: API PSL1: A, B, X42-X70 API PSL2: BM, X42-X70

  14. 2.4 SMLS Pipe Diameter: 21.3mm-914mm (1/2”- 36”) Wall Thickness: 2.77mm-120mm (0.109”- 4.724”) Steel Grade: API 5L PSL1 / PSL2: A, B, X42-X80 ASTM A53: Grade A, B, C ASTM A106: Grade A, B, C ASTM A333: Grade 1- Grade 8 ASTM A335: P1 - P92 EN 10210 / 10219 / 10216: S235 - S460, P195GH-16Mo3 DIN 1629 / 17175: ST37.0, ST44.0, ST52.0, ST35.8, ST45.8 ASTM A209 / A210 / A213: Grade A1 - Grade C, T1-T91 JIS G3454 / 3455 / 3456: STPT / STS / STPT370-510 ASTM A519: Grade 1030 - 4145 NACE MR0175 / ISO 15156, Sour sevice Annex-H

  15. 2.5 OCTG - Casing Diameter: 114.3mm-508mm (4.5”-20”) Wall Thickness: 5.21mm-16.13mm (9.5 PPF-133 PPF) Steel Grade: H40, J55, K55, N80, L80, C90, C95, T95, P110, Q125

  16. 2.5 OCTG - Tubing Diameter: 48.26mm-114.3mm (1.9” - 4.5”) Wall Thickness: 3.18mm-16mm (2.4 PPF - 26.1 PPF) Steel Grade: H40, J55, K55, R95, L80, N80, C90, T95, P110

  17. 2.6 Pipe Bends and Fittings , Flanges, Valves

  18. 2.7 Pipe Coating Coating type (external) : FBE, 2PE, 2PP, 3PE, 3PP, etc. Standards: CSA Z245.20-02, SY/T0315-2005, Q/CNPC 8-2002, GB/T 23257-2009, DIN 30670-1991, DIN 30678-1992, SY/T 0413-2002, Q/SY XQ 8-2003, Q/SY XQ 9-2003, CSA Z245.21-02, etc. Coating type (internal) : with liquid coating materials Standards: API RP 5L2-2002, SY/T 4057-2000, SY/T 0442-2010, Q/SY XQ 10-2003, Q/SY XQ 11-2003, etc.

  19. 2.7Pipe coating - Concrete Weight Coating Raw Material Inspection: ASTM C136, ASTM C117, ASTM C142, ASTM C40, ASTM C123, ASTM C70, ASTM C128, ASTM C127, ASTM C150, BS 12, ASTM A185, ASTM A82, ASTM C171, ASTM C309. Offline Inspection Concrete tensile strength: ASTM C39, BS EN12390-3, BS EN12390-2 (Making and curing) BS EN12390-1 (Specimens dimension) Concrete Density: BS EN12390-7 Water absorption rate: BS EN12390-3, BS 1881-122 Shear adhesion: DNV-RP-F111 Impact strength: DNV-RP-F111

  20. 3. Sales Supporting • Review the project technical specifications for inquiries • Prepare the project TDS (Technical Data Sheet) for pricing • Estimate the feasibility of the manufacturing • Allocate the proper qualified suppliers for the inquiry • Estimate the delivery time and schedule • Estimate the shipping price and duration, vessel types • Provide the mill’s qualification documents if required • Prepare full tender documents including MPS, ITP, WPS, Painting procedures • Review the prices 20

  21. 4.Quality Management How can we provide the products with required quality? We have: • Pre-qualified raw material suppliers in place • Pre-qualified manufacturers in place • Handover meeting to make operation team fully understand requirements • Specific quality plan, ITP, MPS, Procedures etc in place • Production Kick off meeting to the mill fully understand the requirements • Experienced Engineer to assist the mill on technical issue • Qualified QC inspectors full time supervision • Specific WIs, Forms, Records in place • QC Daily detail report • Standard in-process QC chart in place • Change orders registering system • Material re-test and heat No. tracking system • NCR control system • 3rd party inspection if needed • Final inspection before release • Stowage plan before loading • Loading survey report after loading

  22. 4.1 Kickoff Meeting for Project Startup

  23. 4.2 In-Process QC Work Flow

  24. NonConformance found Tagging isolated Issue NCR NO Close NCR Take off tags Flow to next process pass YES QCproposal CPAR Or not NO Engineer confirm Re-work by fabricator Re-inspected By inspector YES Issue CPAR Fabricator Implementation Verified By inspector 4.3 NCR~~Flow of Non-Conformance Control

  25. 4.4 In-process Inspection

  26. Weld Quality Discussion

  27. 4.5 Material Tracking

  28. 4.6 Weld Map System SUNLION weld map system can track very weld for which welder, what date, WPS No. NDE report.

  29. 5. Production Control • Prepare MPS • Supplier manufacture capacity evaluation • Specific working scope and standards • Technical specification declaration for kick off meeting • Production plan and schedule • Shop drawing detailing • Monitor progress • Technical support for mill manufacturing • Detail Shop drawing • Packaging method developing • Variation control • Manuf contract • New supplier development • New products R&D

  30. Production-Packaging

  31. 6. Logistics Ship booking Stowage plan Full time loading survey Custom clearance Kick off meeting before loading collecting shipping documents, and insurance Inspection and records

  32. 6.1 Stowage Plan

  33. 6.2 Loading Survey

  34. Loading Survey Report will be prepared after finish loading

  35. 6.3 Position Update After the vessel departure, we will provide weekly/Daily position update service. Last Position Received  Received:                     1 h, 25 min ago (2015-02-27 02:06)  Area:                            Atlantic North  Latitude / Longitude:     29.76586° / -74.9678°  Status:                          Underway  Speed/Course:               11.1kn / 223°  AIS Source:                   Satellite  Wind:                            7 knots Wind direction:              W (260o)  Schedule AGW WOG WP FMEETA New Orleans          Mar.2

  36. Bill of Lading Commercial invoice Packing list Insurance policy Certificate of Origin Quality Plan MPS ITP WPS/PQRs WPQs Manufacturing conformance certificate Shop drawings (as-built) Raw material Mill Test certificate Raw material re-test report Consumable material mill certificate Material traceability report Weld map NDT report NCRs Dimension inspection report Painting records Coat inspection report Release note 7.Documentation Shipping documents Loading Survey report Final stowage sketch LC documents (if payment by LC) Quality documents (MDR)

  37. Main performance P75&P77 FPSO (Float Production Storage and Offloading) – Petrobras With production capacities of 150,000 barrels per day each, will be deployed in Transfer of Rights blocks, in the Santos Basin pre-salt layer, along with two other similar units, the P-74 and P-76. The RIG Consortium will be in charge of building the modules of and integrating both platforms. The work will be done at the Honorio Bicalho shipyard, in Rio Grande.

  38. 43

  39. Main performance 2. OBIAFU/OBRIKOM-OBEN NODE (OB3) GAS PIPELINE PROJECT (LOT B – UMUKWATA IPS TO OBEN NODE GTP) – NNPC The Nigerian National Petroleum Corporation (NNPC), through its Gas Infrastructure Division (GID) intends to construct a 48” x 127km, Class 600 trunk gas supply pipeline from Obiafu/Obrikom (OB/OB) in Rivers State through the NGC Oben metering station in Edo State and to terminate at Oben Node at Ijomi in Oghara in Delta State and Gas Treatment and Pressure Reduction Facilities with capacity of 2Bscf/d.

  40. Main performance 3. Webb Dock Port of Melbourne,AUSTRALIA The Port of Melbourne Corporation has awarded Australian construction firm McConnell Dowell the contract to design and build the Maritime Works Package for the upcoming Port Capacity project, including a new wharf at Webb Dock West.The project is part of the Victorian State Government’s A$1.6 billion (US$1.44 billion) investment to develop Melbourne’s terminal and freight facilities as the port reaches capacity by 2017. The design and construct contract will deliver improved waterside infrastructure to Webb Dock including upgraded navigation aids and berth facilities. McConnell Dowell will build a new 920-metre wharf at Webb Dock West that will service the expanded automotive terminal, and will also expedite the rebuilding of existing wharfs at Webb Dock East. Construction of the Maritime Works start in mid-2014, with completion expected in 2016.

  41. Thank you!