Compiled by: Márton Horváth Technical director

Secrets of smoke extraction and HPWM in the new deep garage beside Hungarian Parliament 16.10.2013 Paris. Compiled by: Márton Horváth Technical director. Table of contents. Water mist basic information Overview of building , photos Relation between HPWM and smoke extraction Savings

hector
Download Presentation

Compiled by: Márton Horváth Technical director

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Secrets of smoke extraction and HPWM in the new deep garage beside Hungarian Parliament 16.10.2013 Paris Compiled by: MártonHorváth Technical director TŰZŐR Ltd official distributor for Hungary

  2. Table of contents Water mist basicinformation Overview of building, photos Relation between HPWM and smoke extraction Savings Initial dates for FDS simulation Evaluations FDS simulation results TŰZŐR Ltd. official distributor for Hungary

  3. 1. Basic information of HPWM • Enviromantally friendly • Rapid heat absorbtion • Effective fire control • Low water flow • No need of air tight room, (beside 3m/sec air velocity the HPWM is tested) • Is also appropriate for „B” class fires, hazardous liquid fires) without foam!!!! • Stainless steel piping, long life span BENEFITS Inside the flame zone the dropplets evaporate (1lit H2O=1760lit steam), this will reduce the O2 concentration to 16-17% - Huge dropplet specific surface, enormous heat absorbtion, cooling OXIGEN ENERGY Expectationfrom a XXI. centuryextinguishingagent • Effective • Enviromentallyfriendly • Long life span • Lowmaintenancecost Combustible material TŰZŐR Ltd official distributor for Hungary

  4. Before making decision to apply HPWM, it is improtant to be aware of benefits, and disadventages Disadventage: HPWM more expensive pump technology, and expensive nozzles (spr nozzle 2-10EUR, HPWM 90-100EUR) TŰZŐR Ltd official distributor for Hungary

  5. Almost 0 smokeextraction 50% reductiononsmokeextraction 4 levels, 560car parking, 22.000m2 TŰZŐR Ltd official distributor for Hungary

  6. Relations between smoke extraction and HPWM in Hungarian National Regulation of Fire Safety 1.Why doweneedautomaticfire fightingsystems? More than one level underground garages must be equipped by automatic fire extinguishing system and detectionsystem. 2.Whatwould be thesmokeextractiondueto National Regulations? 541§ Machinery smoke extraction can ransom gravity natural smoke extraction. Each effective m2 open surface shall be considered as 2m3/sec machinery ventilation. For garages 1% of total fire section shall be the min open surface for natural smoke extraction. We have: 3750m2 maximum fire section 1% =37,5m2 smoke extraction x 2m3/sec= 270.000m3/h 3.How can we reduce smoke extraction, without loss of safety ? 506§ SUBJECT SMOKE EXTRACTION For non standardised cases, individual designed solutions must be controlled by computer simulations (software must be accepted by Hungarian Nationa Disaster Ministry=FDS). Due to this simulation we could reduce down to 0,5%. 135.000m3/h TŰZŐR Ltd official distributor for Hungary

  7. 4.Which are these paragraphs that support us optimising system? 507§ SUBJECT SMOKE EXTRACTION (1)The application of smoke extraction is forbidden for rooms where total flooding automatic fire fighting system is designed. (high expansion foam, gas, open nozzle HPWM) (2) For those rooms where water mist system is installed (bulb system), Hungarian National Disaster Ministry will define the need and density of smoke extraction. 5.How can we reduce the heat resistance requirements by HPWM? 515 § Smoke extraction equipments (fan motor, cable duct must be at least 400C° heat resistant for 90min operation designed. Due to the results of FDS simulation, the max temperature has been improved not to exceed 300C°. TŰZŐR Ltd. official distributor for Hungary

  8. 3. SAVINGS 170.000€ • Instead of 400C° resistant JET and extraction fans 300C ° installed, thanks to FDS simulation and HPWM. • Saving on 50% of air volume (duct, cables, extraction fans) due to FDS simulation and HPWM • -1 level total flooding system, open HPWM system, therefore we totally save smoke extraction for this level. Fans, cabling ducting 100.000€ 250.000€ Surplus cost for HPWM on conventional sprinkler system 520.000€ 520.000€ What benefits does the project win, by applying HPWM? Reduced size of smoke extraction ducts on level -4, -3, -2 No smoke extraction on level -1 except evacuation corridors Better fire suppression system Long life span stainless steel piping No ugly air intake and outlet louvers above ground, fit to architect design TŰZŐR Ltd official distributor for Hungary

  9. 4. Initial data's for FDS simulation Fire section nr 1. Fire section nr 1. Air outlet Excape stairs Excape stairs Fire section nr 2. Fire section nr 2. -2. level ignited car position defined by authority -4. level ignited car position defined by authority Air inlet • 1 car 4,7MW Citroën • Every 2nd parking place one car • 9 nozzles and 6 smoke detection sensors added to simulation TŰZŐR Ltd. official distributor for Hungary

  10. Timing delay criteria for visibility Smoke detection system 2sec Preparation at fire department 120sec Arrival of fire brigade 2,2km*40km/h= 198sec Access unpacking at destination 180sec Total 500sec=8,3minutes • 2pcs OH2 upright nozzles will be activated • Maximum temperature 277Celsius • The visibility has to be checked after 8 minutes, so that the access to fire seat is ensured by smoke extraction • 784l/min pump unit 7+1 • due to the total flooding on • -1 level TŰZŐR Ltd official distributor for Hungary

  11. Visibility on – 4 level TŰZŐR Ltd official distributor for Hungary

  12. Water mist development -2 level TŰZŐR Ltd official distributor for Hungary

  13. -2 level Temperature y TŰZŐR Ltd official distributor for Hungary

  14. Thankyou for your attention! Questions? TŰZŐR Kft a rendszerek hivatalos magyarországi képviselője