IST & VMware ESX: What we did - PowerPoint PPT Presentation

slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
IST & VMware ESX: What we did PowerPoint Presentation
Download Presentation
IST & VMware ESX: What we did

play fullscreen
1 / 23
IST & VMware ESX: What we did
108 Views
Download Presentation
haviva-finley
Download Presentation

IST & VMware ESX: What we did

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. IST & VMware ESX:What we did

  2. Agenda IST Setup POD design Usage Scalability & Capital Cost Reliability VM as a Service 2010 | The Sky’s the Limit

  3. Overview VMware ESXi 4.1 Dell & Netapp 2010 | The Sky’s the Limit

  4. Pod Design POD = Compute Nodes + Storage 2010 | The Sky’s the Limit

  5. Pod Design POD = Compute Nodes + Storage PODS Development 2010 | The Sky’s the Limit

  6. Pod Design POD = Compute Nodes + Storage PODS Development Production – MC (Primary) 2010 | The Sky’s the Limit

  7. Pod Design POD = Compute Nodes + Storage PODS Development Production – MC (Primary) Production – PHY (Secondary) 2010 | The Sky’s the Limit

  8. Compute Detail - Server Embedded boot device LOTS of RAM! 2010 | The Sky’s the Limit

  9. Compute Detail - Network Five 1Gig interfaces 2 interfaces for management 2 interfaces for VM traffic 1 OOB KVM host management 10Gig 2010 | The Sky’s the Limit

  10. Compute Detail - Storage NFS Dedupe = 50% (2:1) 2010 | The Sky’s the Limit

  11. POD Services vMotion SvMotion VMware DRS VMware HA & FT 2010 | The Sky’s the Limit

  12. VM Count Dev = 100 + 12 templates Prod-MC = 40 Prod-PHY = 15 Total = 155 35% Linux, 65% Windows 2010 | The Sky’s the Limit

  13. Dev POD cost - 3 years Dev Servers = 3 * $30K Dev Storage = $60K Total cost = $150K VMs = 100 Simple amortized cost = $500/vm/year 2010 | The Sky’s the Limit

  14. Further Cost Projections Typical VM uses 2.4GB RAM Thus a total of ~200 VM Total cost drops to $250/vm/year 2010 | The Sky’s the Limit

  15. Reliability 95% < X < 100% No data loss Selected service outages Mitigation 2010 | The Sky’s the Limit

  16. Challenges VMware license renewal USB devices Reactive not proactive capacity 2010 | The Sky’s the Limit

  17. VM as a service Why What When 2010 | The Sky’s the Limit

  18. Why – Why not Cost Deployment time Management 2010 | The Sky’s the Limit

  19. What 1-2 vCPU (1.8Ghz) CPU 1-2 GB/RAM 20-40GB storage $600/year 2010 | The Sky’s the Limit

  20. What Part 2 Console access – you can install VM Firewall Load Balancer AC/Power/Monitoring/Security/etc 2010 | The Sky’s the Limit

  21. “SLA” • Best effort 2010 | The Sky’s the Limit

  22. When Now – CEL & IQC already 2010 | The Sky’s the Limit

  23. Questions? 2010 | The Sky’s the Limit