1 / 5

What is the cost of a warehouse

Building a warehouse is a significant investment u2013 but itu2019s one that can pay off handsomely in the long run. Of course, Warehouse construction cost is not a one-time expense; there are ongoing costs associated with owning and operating a warehouse, such as property taxes, insurance, and utilities.<br>

hareesh2
Download Presentation

What is the cost of a warehouse

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What is the cost of a warehouse Building a warehouse is a significant investment – but it’s one that can pay off handsomely in the long run. Of course, Warehouse construction cost is not a one-time expense; there are ongoing costs associated with owning and operating a warehouse, such as property taxes, insurance, and utilities.

  2. Warehouse construction cost also depends on its size, location, and features. For example, a warehouse that is located in a high-crime area will likely have a higher security budget than a warehouse in a low-crime area. In this article, we will explore the various factors that impact the Warehouse construction cost. We will also provide a few tips on how to keep your costs down when building a new warehouse.

  3. The Warehouse construction cost depends on: ● ● Specifications and Grade of building/ structure Location where the warehouse is to be built (For example Ahmedabad is where the costs are the lowest and Chennai is where the costs are the highest) A synopsis on the approximate all-inclusive costing is below:

  4. Grade (Specification) Cost per square foot (turnkey) Location Ahmedabad Grade A Rs 1000 Grade B Rs 600 Chennai Grade A Rs 1600 Grade B Rs 900

  5. The costing does not include land filling charges but includes compound wall, common area development costs, GST and plan sanction costs as on 01.02.2021 ●

More Related