CUPLAREA PIETELOR DE ENERGIE PERSPECTIVA OPERATORULUI DE TRANSPORT SI SISTEM

CUPLAREA PIETELOR DE ENERGIE PERSPECTIVA OPERATORULUI DE TRANSPORT SI SISTEM WORKSHOP AFER 26.06.2013. ALOCAREA CAPACITATILOR DE INTERCONEXIUNE SITUATIA ACTUALA A ACORDURILOR CU TARILE VECINE:

Download Presentation

CUPLAREA PIETELOR DE ENERGIE PERSPECTIVA OPERATORULUI DE TRANSPORT SI SISTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CUPLAREA PIETELOR DE ENERGIE PERSPECTIVA OPERATORULUI DE TRANSPORT SI SISTEM WORKSHOP AFER 26.06.2013

  2. ALOCAREA CAPACITATILOR DE INTERCONEXIUNE • SITUATIA ACTUALA A ACORDURILOR CU TARILE VECINE: • SUNT INCHEIATE ACORDURI SI STABILITE REGULI DE ALOCARE CU EAD-BULGARIA, EMS-SERBIA, MAVIR-UNGARIA. • ●LICITATIILE SUNT EXPLICITE • ORGANIZAREA LICITATIILOR SE FACE PE PLATFORMELE DE PIATA ALE OTS DIN ROMANIA, BULGARIA, SERBIA SI UNGARIA • - RO-BG : Licitatiianuale, lunare (BG), zilnicesiintrazilnice(6 sesiuni) (RO) • RO-SR : Licitatiizilnice (SR) sianuale, lunare, intrazilnice(6 sesiuni) (RO) • RO-HU : Licitatiianuale, lunare (HU), zilnicesiintrazilnice(6 sesiuni) (RO) • NU SUNT IN VIGOARE ACORDURI CU UCRAINA SI MOLDOVA

  3. IN CADRUL INITIATIVEI SEE S-A INFIINTAT UN CAO LA PODGORITA IN MUNTENEGRU CU PARTICIPAREA STATELOR DIN BALCANI – FARA SERBIA SI BULGARIA SE ASTEAPTA SA INTRE IN FUNCTIUNE CU ANUL 2014 SEECAO PrincipiiAlocare Revanzare Piatasecundara UIOSI UIOLI Rolul TEL Transmitere ATC Primire/verificare settlement Facturarevenituri Primirenotificari ATC/ Programare

  4. MODELUL CUPLARII PIETELOR IN EUROPA PCR- PRICE COUPLING OF REGIONS INITIATORUL PROIECTULUI ESTE REGIUNEA NWE STATELE DIN CWE+GB+TARILE NORDICE PRINCIPII : ► UN SINGUR ALGORITM ► EXPLOATARE DESCENTRALIZATA ► GUVERNANTA DEZCENTRALIZATA

  5. Caracteristicile pietei cuplate ●Licitatii implicite ● Alocare optima a energiei si a drepturilor de capacitate de interconexiune ● Maximizarea fluxurilor de energie pe capacitatea de interconexiune ● Participantii la piata sunt in legatura numai cu PX- bursa locala ● Toate bursele locale isi pastreaza de regula modul de lucru actual cu participantii la piata ● OTS nu liciteaza pe piata ● Se permit preturi negative ● Se permit atat modelul de alocare pe baza de ATC cat si bazat pe fluxuri sau ATC/Fluxuri(pentru zonele in care modelul este aplicabil) ● In cazul lipsei de congestii la interconexiune, PIP este egal pe zona interconectata intre zonele vecine ● In cazul congestiilor diferente de pret se mentin intre zone vecine, iar diferenta de pret reprezinta pretul de alocare a capacitatii si constituie baza veniturilor din congestii ale OTS ● Intuitiv energia curge dinspre zona cu pret mic spre cea cu pret mare

  6. SECVENTA OPERATIONALA A PCR LOCAL REGIONAL/EUROPEAN LOCAL PRECUPLARE CUPLARE POSTCUPLARE • OTS-ul CALCULEAZA CAPACITATEA FERMA PENTRU ZIUA URMATOARE(INCLUSIVUIOSI SI FLUXURILE LIMITA DUPA CAZ. • PX PRIMESC ORDINELE DE LA PARTICIPANTII LA PIATA • Shipping: • SE FACE PROGRAMAREA SI SE NOTIFICA FLUXURILE TRANSFRONTALIERE • SE STABILESC EXPORTURILE SI IMPORTURILE PE FIECARE GRANITA SI VENITUL OTS DIN CONGESTII(DACA ESTE CAZUL) • PX, NOTIFICA SI DECONTEAZA PIATA LOCALA • PXs CALCULEAZA IN COMUN PRETURILE SI POZITIILE NETE DE IMPORT SAU EXPORT PENTRU FIECARE HUB(REGIUNE) • SE MAXIMIZEAZA CASTIGUL PE PIATA • SE CALCULEAZA VENITUL IN CAZUL CONGESTIILOR

  7. SECVENTA OPERATIONALA A PCR • OTS CALCULEAZA ATC SI/SAU FLUXURILE DE ENERGIE RAMPA • OTS TRANSMITE DATELE LA SISTEMUL COMUN AL OTS- TMF • TMF TRANSFERA DATELE COMUNE LA SISTEMUL DE CUPLARE • OTS PUBLICA DATELE DE INTERCONEXIUNE • PARTICIPANTII LA PIATA TRANSMIT DATELE LA PX • PX CALCULEAZA CURBELE AGREGATE, LE ANONIMIZEAZA SI LE TRIMITE LA SISTEMUL DE CUPLARE • SISTEMUL DE CUPLARE CALCULEAZA PRETUL, POZITIILE NETE, FLUXURILE TRANSFRONTALIERE SI OFERTELE ACCEPTATE SI LE TRANSMITE LA PX. • PX VERIFICA SI VALIDEAZA REZULTATELE • REZULTATELE SUNT TRIMISE LA TMF • PORTOFOLIUL ESTE ALOCAT • REZULTATELE SUNT TRIMISE LA OTS(SHIPPER) SI PUBLICATE • DECONTAREA LOCALA • DECONTARE INTRE OTS • PROGRAMARE SI NOTIFICARE • VENITUL DIN CONGESTII (SE DISTRIBUIE LUNAR) FIECARE OTS ISI DEFINESTE SOLUTIA DE SHIPPING

  8. PCR CALENDARUL PROCESULUI pentru NWE PROPUNERE 10:30 Publicarea datelor de interconexiune 12:00 OBK TIMPUL DE INCHIDERE AL PORTILOR 12:10 – 12:27 Calcule 12:28 – 12:41 Validarea preliminara de catre PX- uri 12:42 Publicarea rezultatelor preliminare(inclusiv PIP) si trimiterea rezultatelor la OTS-uri 12:42 – 12:54 Validarea finala la TMF- OTS 12:55 Publicarea Rezultatelor Finale (incl. PIP) Startul Procesului de Notificare 13:55 Finalul Procesului de Notificare ►CALENDARUL VA TREBUI ADOPTAT DE CATRE TOATE REGIUNILE CARE SE CUPLEAZA IN CAZ DE INTARZIERE DIN CAUZE TEHNICE SE ACCEPTA ORA 15:30 CA LIMITA PENTRU SFARSITUL PROCESULUI DE NOTIFICARE. PCR Proces normal- 55 min Procesul de Notificari - 60 min

  9. PRECUPLARE OTS 1 2 FUNCTIA DE MANAGEMENT A OTS- TMF 3 PUBLICARE DATE INTERCONEXIUNE 4 4 SISTEMUL DE CUPLARE 6 5 SHIPPER SISTEMELE PX PARTICIPANTI LA PIATA OFERTE OFERTE

  10. CUPLARE OTS 11 FUNCTIA DE MANAGEMENT A OTS- TMF 9 SISTEMUL DE CUPLARE 7 8 11 SHIPPER SISTEMELE PX PARTICIPANTI LA PIATA 10

  11. POSTCUPLARE OTS 14 15 FUNCTIA DE MANAGEMENT A OTS- TMF SISTEMUL DE CUPLARE 13 12 SHIPPER CLIRINGUL FIECAREI PX PARTICIPANTI LA PIATA 12

  12. PROIECTUL DE CUPLARE 5M CEHIA-SLOVACIA-UNGARIA-POLONIA-ROMANIA ROLUL TRANSELECTRICA ROLUL DE OTS ● CALCULEAZA COORDONAT NTC SI ATC ● TRANSMITE ATC LA TMF=modul al Platformei de piata ●PRIMESTE DOCUMENTELE DE ALOCARE A DREPTURILOR -CRD ● PROGRAMEAZA SCHIMBURILE ROLUL DE SHIPPER ●ESTE RESPONSABIL DE: -LIVRAREA ENERGIEI -DECONTAREA ENERGIEI OPCOM MAVIR -DECONTAREA CU MAVIR A VENITURILOR DIN CONGESTII

  13. PIATA LOCALA IN CADRUL PIETEI CUPLATE TRADE NOTIFICARI INTERCONEXIUNE PARTICIPANTII LA PIATA MAVIR OPCOM TEL-ROL DE SHIPPER TRADE TRADE TEL-ROLUL DE OTS

  14. CATEVA CONCLUZII: ► SE REDUCE POSIBILITATEA “TEZAURIZARII” CAPACITATII. ► CAPACITATEA DE TRANSPORT ESTE AUTOMAT FOLOSITA LA MAXIM ► SURPLUSUL DE CAPACITATE ESTE IMEDIAT RAPORTATA DE PX LA OTS SI FACUTA DISPONIBILA PE LICITATII INTRADAY SAU PE PIATA REGIONALA DE ECHILIBRARE ► PARTICIPANTII LA PIATA NU POT RETINE ABUZIV CAPACITATI NEFOLOSITE ► NESIGURANTA PRIVITOARE LA FOLOSIREA CAPACITATII EXPLICITE OBLIGA OTS SA PUNA LA DISPOZITIE MAI MULTA CAPACITATE FERMA PENTRU CUPLARE ► SE PERMITE O MAI BUNA NETUIRE A FLUXURILOR DE ENERGIE

  15. MULTUMESC PENTRU ATENTIE ! GHEORGHE VISAN george.visan@transelectrica.ro