1 / 24

Outline

PI Introduction on ERP Project in KHNP May 13, 2003 Sangyoung Mo 1 and Taegheon Kwag 2 1 ERP Project Office, ERP Project Division, 2 Maint. & Eng. Office, Power Generation Team , Headquarters, KOREA HYDRO & NUCLEAR POWER CO., LTD. Outline. Introduction Introduction of KHNP

gerik
Download Presentation

Outline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PI Introduction on ERP Projectin KHNPMay 13, 2003Sangyoung Mo1 and Taegheon Kwag21ERP Project Office, ERP Project Division,2Maint. & Eng. Office, Power Generation Team, Headquarters,KOREA HYDRO & NUCLEAR POWER CO., LTD.

  2. Outline • Introduction • Introduction of KHNP • ERP Project in KHNP • PI Installation • Scope • System Layout • Data Flow • Interface with SAP • Trouble-shootings • Conclusion

  3. Background and Information of KHNP (1/2) • Korea Electric Power Corp. (KEPCO) officially split up its power generation sector into 6 separate companies on April 2, 2001 by the Korean government’s electric power industry restructuring program. • The goal of the restructuring is to provide users with stable supplies of high-quality and low-cost electricity by maximizing the competitiveness and efficiency of the power generation companies. • Korea’s electric power exchange market have been operating since April 2002. Although it is currently a Cost-based pool, it will be changed into TWBP (Two Way Bidding Pool) market by April 2004 • As one of the subsidiaries, KHNP has been formed combining hydro and nuclear generating facilities of KEPCO. • operate 18 nuclear reactors in 4 sites, and 16 hydro plants • 2 new reactors are under construction • plan to build an additional 10 reactors by 2015

  4. Background and Information of KHNP (2/2) • Installed nuclear capacity : 15,716 MW (as of the end of 2002) • 29.2 % of the nation’s total installed capacity • Nuclear power output : 119 billion kWh (in 2002) • 38.9 % of the country’s electricity consumption • Average capacity factor of NPPs : 92.7 % (in 2002) • Ulchin • # 1, 2, 3 & 4 • # 5 & 6 PWR • In Operation : 18 (15,716MW) • Under Construction : 2 (2,000MW) • Wolsong • # 1, 2, 3 & 4 PHWR • Yonggwang • # 1, 2, 3, 4, 5 & 6 PWR • Kori • # 1, 2, 3 & 4 PWR

  5. Background and Objective of ERP Implementation Changes in Utility Industry Business Environment  Graduate Dispersion of Demand & Open Competition Project Background Strengthen Competitiveness through Implementation of Advanced Business Management Technique Establish Profit Oriented Management & Transparent Accounting Method Need for Implementation of Business Process Innovation for Utility Industry Innovation Program Implementation of BPR & ERP Introduce Advanced Business Mgt. Technique Management Transparency/Implementation of profit oriented business system Integrate/Implement developed information system Project Objective Gain Comparative Advantage in Power Generation

  6. Brief Process of ERP Project • 2001.4.2 : Split up of KEPCO into KHNP • 2001.6.1 : Launch ERP project team • 2001.12.31 : Sign contract (Anderson consortium) • 2002.1.14~2.28 : SAP module training • 2002.4.1 : Commence 7 key BPR processes • 2002.4.10 : Complete As-is analysis • 2002.7.31 : Complete To-be design • 2002.10.24 : Contractor change to BP (BearingPoint) consortium • 2003.1.20~1.25 : Complete final integration test • 2003.1.29 : Decide on ERP system title as DREAMS (Digital Realtime Enterprise Asset Management System) • 2003.2.8 : ERP system open (on Ulchin Plant 2) • 2003.4.12 : Roll-out on All plants excluding Ulchin Plant 2

  7. PI Introduction Scope • We intended to introduce PI ICE for web interface but PI Activeview was finally installed instead of PI ICE to improve speed on the web.

  8. KPX PI System Layout Head office Out of KHNP Korea Power Exchange Co. Gen. Monitoring Sys. Gen. Monitoring Sys. in other companies DREAMS HQPI Web Server (RTDB) PI-RLINK Han River Site Power Trading Sys. HYDROPI (RTDB) Buffer Node Customized KHNP LAN Legacy TADA Sys. PI SAP Ulchin Nuclear Division UJPI (RTDB) Weather Info. Buffer Node Kori Nuclear Division (Same as Ulchine) Wolsong Nuclear Division (Same as Ulchin) Yonggwang Nuclear Division (Same as Ulchin) ERMS KRPI (RTDB) WSPI (RTDB) YKPI (RTDB) Disch. Rad. Buffer Node Buffer Node Disch. Temp. Plant-1 Com. Plant-2 Com. TMS Chem.

  9. Integrated Data Flow Legacy System PI Interface PI Server PI User Interface & Analysis Tools ERP Package TADA System HPP Monitoring Buffer Nodes Han River Dam Information • Eq. reliability • Gen. cost/profit • Key operation indicator • Perform. index • Client Tools • PI DataLink • PI ProcessBook RTDB NPP Monitoring Sys. Plant Parameters Buffer Nodes • Nuclear Div. • Kori • Wolsong • Yonggwang • Ulchin Power Generated DREAMS (SAP) RDB Operating History PI R-Link PM Buffer Node Each Legacy System RTDB Env./Radiation RTDB RTDB RTDB RDB Gen. Monitoring Sys. PWR Output Head Office PI-API PI-A/V RDB Power Trading Sys. Power Sales RTDB Web Interface

  10. Interface with SAP PM through RLINK • PI RLINK provides an interface between PI and SAP PM • Trigger based SAP Transaction • Transaction is triggered by the alarm tag • Automated PM notifications • Measurement document creation in SAP PM • Additional tags are needed for alarms, PM notification number, and measurement document number. • No way to transfer PI analog type data to SAP frequently, through RLINK • In case of manual input, the additional step resetting the alarm is necessary • Can not deliver any real time analog data from PI to SAP

  11. SAP Transaction Steps in detail • In case of Run/Stop signal of Rotating Equipment Source Tag Set Alarm Tag Create PM Notification and Measurement Doc. In SAP ReturnNotification & Doc. No. SAP →PI • In case of Manual Input Data Delete Dummy Value Manually Input Dummy Value(-1) Reset Alarm Tag Manually Input Actual Value Return Doc. No. SAP → PI Create Measurement Doc. In SAP Set Alarm Tag

  12. Interface with SAP and Legacy systems • We have developed an application using PI-API, PI RDB I/F and BAPI Power Trading System Generation Monitoring System ② Sharing data with other companies • Power Sales • Prices ① PI System (API App.) ① ② • Power Generated • Power Purchased • In-Site Consumption • Operating Time ② SAP R/3 Auto./Manual Input CO, PP, FI, SEM

  13. Web Screen Shot – Main page

  14. Web Screen Shot – Unit summary page

  15. Web Screen Shot – Primary system

  16. Web Screen Shot – Secondary system

  17. Web Screen Shot – TBN-GEN

  18. Trouble Shooting on ProcessBook (1/2) • Problem : DataSet expressions are truncated after the pdi file, which include datasets, is copied to another PC. (PB version 2.31) • Solution : After upgrading the UDS server from version 3.3.361.93 to version 3.3.362.47, the problem was disappeared.

  19. Trouble Shooting on ProcessBook (2/2) Truncated Expression after being copied Original Expression

  20. Trouble Shooting on DataLink • Problem : PI time strings (‘Y’,’T’, ‘*’, etc.) are not work in Excel properly (DL version 2.1) • Solution • Use Excel functions such as ‘today()’, ‘Now()’, etc., instead of PI time string OR • Use the Application.CalculateFull method in VBA script OR press ‘Ctrl+Alt+F9’ key combination in the Excel sheet.

  21. Trouble Shooting on Manual-Logger(1/3) • Problem : Font Broken in Manual-Logger screen (version 1.3) • Solution :not yet • Because of this problem, we had to develop API applications instead of Manual-Logger to provide manual input function .

  22. Trouble Shooting on Manual-Logger(2/3)

  23. Trouble Shooting on Manual-Logger(3/3)

  24. Conclusions • PI is an important data path among KHNP ERP system, plant computer, and other legacy systems. • Concept of information system was changed after introducing PI system • Scope : Individual plant → Whole company • Objectives : Business function based → Business process based • Implementation : S/W development → Package configuration • PI began to change many people who ware opposite to PI, with impressive capabilities. • Although there is some problem and additional necessary functions, we don’t doubt PI system is very flexible, easy to use, and powerful. • PI agencies and customers must have correct understanding of all features of each PI package as well as OSIsoft, prior to PI introduction. The end.

More Related