1 / 16

OL Working Group Panel 2a: Current Realities

OL Working Group Panel 2a: Current Realities. Bob Houtman Head, Integrative Programs Section National Science Foundation. US Fleet Update. 21 ships in US Academic Research Fleet 6 Global 6 Ocean/Intermediate 5 Regional 4 Local. The UNOLS Fleet. Notes:. R/V SIKULIAQ (formally ARRV).

genica
Download Presentation

OL Working Group Panel 2a: Current Realities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OL Working GroupPanel 2a: Current Realities Bob Houtman Head, Integrative Programs Section National Science Foundation

  2. US Fleet Update • 21 ships in US Academic Research Fleet • 6 Global • 6 Ocean/Intermediate • 5 Regional • 4 Local

  3. The UNOLS Fleet Notes:

  4. R/V SIKULIAQ (formally ARRV) • Major Research Equipment Facilities Construction (MREFC) Project Funding • Design Verification and Transfer nearing completion with MMC • Cut Steel – Oct 2010 • Launch – Apr 2012 • Science and Sea Trials - 2013 • Begin Science Ops – Jan 2014 Global Class Vessel (254 x 52ft) Endurance: 45 days Science Berths: 26 Ice capability: IACS PC-5 (3 ft @ 2kts)

  5. Ocean Class AGOR • Key Characteristics: • Hull Material Steel • Length 220 ft* • Beam 46 ft* • Draft 15.7 ft* • Displacement 2200 LT* • Sustained Speed 11 kts • Range 10,000 nm • Endurance 40 days • Propulsion (TBD) Diesels, (2) Electric Propulsion Motors, (2) Propellers • Accommodations 21 crew, 20 science berths • ABS Classed/ABS Designed to ABS A1 Circle E, AMS and ACCU, NIBS, Ice Class D0, USCG COI • (Note *: Based on Government in-house Notional Design developed for cost estimating and requirements/feasibility validation.) Note: Government in-house Notional Design developed for cost estimating and requirements/feasibility validation. • Key Events: Date: • Phase I Contract Award Jan 10 • Milestone B/C Jul 11 • Phase II Contract Award Aug 11 • Start Construction (Lead Ship) May 12 • Follow Ship Award Jan 12 • Start Construction (Follow Ship) Nov 13 • Delivery (Lead Ship) Aug14 • Delivery (Follow Ship) Jan 15 Mission: General purpose oceanographic research Quantity: Two (2) User: Woods Hole Oceanographic Institution (AGOR 27), Scripps Institution of Oceanography (AGOR 28) Builder: TBD (downselect pending from among Marinette Marine Corp. and Dakota Creek Industries Inc.) Contract: FFP - Ship Construction, Navy (SCN) Funding Case/Contract Value: $177.4M Rom Unit Cost: $74.5 M (lead), $71.0M (follow)

  6. Ocean Class AGOR – Program History Feb 2003: SECNAV Report to Congress included: four new Ocean Class Ships over 10-year period and stated Ocean Class AGOR hull selection studies would begin in FY04 and construction started in FY06. Oct 2003: CNR requested PEO Ships assistance to resolve Ocean Class design issues and initiate acquisition planning. Fall 2004: PMS325 outlined findings of hull studies to ONR. Results indicated that the monohull is the most capable and affordable platform to meet SMR requirements. Feb 2005: UNOLS was tasked to provide ONR with a recommendation for the desired hull type. Navy worked with UNOLS to further refine the hull variants and additional Navy SMRs. UNOLS completed hull variant study and briefed ONR that their recommendation was for a monohull. Dec 2005: Department of Defense Appropriations Act, 2006 included $2M RDT&E for the design of the Ocean Class AGOR in FY06. Jun 2006: ONR Report to Congress outlines the recommendation that Navy consider the purchase of two, vice four, Ocean Class ships by 2017. Aug 2006: PMS325 provided updated schedule and budget for acquisition of two vessels beginning with Phase I Award in FY09. Revised budget estimate is $8.5M in RDT&E and $185M in SCN. $185M included in FYDP. Dec 2006: ONR provided $0.5M in RDT&E funding for program initiation. Jan 2010: Phase I Contracts awarded to Dakota Creek Industries and Marinette Marine Corp on 27 Jan. Feb 2010: Post Award Conference – Marinette Marine – held on 25 Feb. Mar 2010: Post Award Conference – Dakota Creek – held on 09 Mar.

  7. Ocean Class AGOR – Marinette Marine Corporation Chief Executive Officer Richard T. McCreary Mailing Address: 1600 Ely Street Marinette, WI 54143-2434 Street Address: 1600 Ely Street Marinette, WI 54143-2434 Phone: 715.735.9341 Fax: 715.735.4774 http://www.marinettemarine.com/ • Current Contracts: • NOAA Fisheries Vessel: FSV • Alaska Regional Research Vessel: ARRV • Prior U.S. Navy Contracts: • Barracks Craft: APL-65/66 • Improved Navy Lighterage System: INLS • Littoral Combat Ship: LCS1, LCS3 • Mine Countermeasure Vessels: MCM2, MCM4, MCM 7 • Powhatan Class Fleet Tugs: T-AFT 166 – 172 • Torpedo Weapons Retriever: 120TR 821-825, 120 TR 832-833 & 120TR 841-842 • Patrol Craft: YP 683 - 702 • Facilities: • Ship Erecting Facility (341' x 206' – 8 x 50 ton overhead cranes) (expansion underway to 591’ x 206’) • Assembly Buildings (combine total of 190,000 sq. ft.) • Lifting Equipment (including 275 ton Manitowoc, 100 ton Manitowoc, 40 ton Loraine) • Travelift & Movers (150 ton Travelift, 30 ton & 115 ton block movers) • Warehouse (324’ x 180’; 53,070 sq. ft.) • Service Center Offices (7,970 sq. ft. Customer Offices) • Tech Center (42,600 sq ft. Executive, Engineering & Operations) • Launch Way & Dock Wall (450’ Launch Way, 1970’ Dock Wall)

  8. Ocean Class AGOR – Dakota Creek Industries Chief Executive Officer Richard Nelson Mailing Address: PO Box 218 Anacortes, WA 98221 Street Address: 820 4th Street Anacortes, WA 98221 Phone: 360.293.9575 Fax: 360.293.6432 http://www.dakotacreek.com/ • Products: • Offshore support vessels • Research vessels • Tugboats • Fishing vessels • Ferries • Facilities: • Syncrolift Shiplift: (306' x 75' - 5,000 ton capacity) • Drydock (314' x 90' - 9,000 ton capacity) • Assembly Building: (300' x 100'- controlled atmosphere; 2 x 10 ton overhead cranes) • Lifting Equipment: (275 (2008) & 175 ton Manitowoc • Crawler, 150 ton P&H Crawler, Grove RT 90 and 60 ton, forklifts, man-buckets, 233 ton Kamag Transporter) • Main Warehouse: (Pipe Fabrication Shop, Stores, Machine Shop) • Outfitting Berths: (Main, Mid Pier (new 2009), and East Docks • Office Space: (Executive, Engineering, Owner's Rep offices) • Galley Complex: (including a fully catered lunchroom, washrooms and showers)

  9. Ocean Class AGOR – Program Schedule O O O O O O O O O O N N N N N N N N N N D D D D D D D D D D J J J J J J J J J J F F F F F F F F F F M M M M M M M M M M A A A A A A A A A A M M M M M M M M M M J J J J J J J J J J J J J J J J J J J J A A A A A A A A A A S S S S S S S S S S FY 07 FY 08 FY 09 FY 10 FY11 FY 12 FY 13 FY 14 FY 15 FY 16 ACAT Designation Key: Government Notional Design Planned Event CDD Review (96 Days) Completed Event CDD Signature Duration TBD ACAT: Acquisition Category ASR Approved ASR: Acquisition Strategy Report CDD: Capability Development Document RFP Release (combined phase I& II) FOC: Full Operational Capability Phase I Bid Preparation IOC: Initial Operational Capability RFP: Request for Proposal Phase I Source Selection SOC: Start of Construction Phase I Award (Preliminary/Contract Design) Preliminary/Contract Design Phase II Bid Preparation Phase II Source Selection Milestone B/C Phase II Award (Detail Design & Lead Ship Construction) Detail Design SOC Delivery IOC Follow Ship Award SOC Delivery FOC

  10. Regional Class Research Vessel (RCRV) • NSF started RCRV Project in late 2003 • Design/construct up to 3 ships @$20M each • $15M/yr for 6 yr using Ocean Sciences Div funds • MOU w/NAVSEA to Program Manage • Started Phase 1 Preliminary/Contract Design • Rapid ship building cost escalation 2006-2008 • NSF ended Phase 1 and MOU w/o down-select • January 2009 NSF took delivery of 2 designs • NSF convened Panel of Experts in October 2009

  11. Regional Class Research Vessel (RCRV) • RCRV Down-select Panel recommended Glostendesign move forward • Panel identified concerns with both designs (Total power, DP capabilities, deck space, etc.) • NSF requested FIC input on design concerns • Input received Sep 2010 • Plan to move forward (3 hulls) using phased “ARRV-like” process starting w/ “Design Refresh” • Construction funds being identified with Goals of: • Release Solicitation - Early CY2011 • Begin Construction – Early CY2014 • Science Operations - Late CY2016

  12. Backup

  13. Global: ATLANTIS R. REVELLE MELVILLE KNORR EWING M.G. LANGSETH T.G. THOMPSON Ocean:  KILO MOANA SEWARD JOHNSON II (ex Edwin Link) ENDEAVOR    OCEANUS GYRE NEW HORIZON SEWARD JOHNSON  WECOMA  ATLANTIC EXPLORER Ship Classes for Utilization ChartsShip Classes: • Regional: • POINT SUR • CAPE HATTERAS • ALPHA HELIX  • PELICAN • LONGHORN • R. SPROUL  • CAPE HENLOPEN • HUGH SHARP • WEATHERBIRD II  • SEA DIVER • Local: • W. G. WALTON SMITH • BLUE FIN • SAVANNAH • BLUE HERON • LAURENTIAN • BARNES • URRACA