550 likes | 746 Views
Landraces : Infra-specific Diversity & Adaptive Divergence. Of an Endangered Evolutionary Link [3]. [Q1]. What are wheat landraces, why they are important, what is their potential?. WLRs. Dynamic population(s), Historical origin, Distinct identity, Genetically diverse,
E N D
Landraces: Infra-specific Diversity & Adaptive Divergence Of an Endangered Evolutionary Link [3]
[Q1]. What are wheat landraces, why they are important, what is their potential?
WLRs • Dynamic population(s), • Historical origin, • Distinct identity, • Genetically diverse, • Locally adapted, and • Associated with “traditional” farming systems • Lacks formal crop improvement,
Why WLRs are important? • Heterogeneity & Diversity • (Reduce risk of failure, increase food security, limited capacity to control the environment) • Support subsistence farming (LCDs) • Emergence of farmers’ seed system(s)
Why WLRs are important? • Evolutionary link (Wild – Modern Wheat cultivars) • Evolution of durum wheat (populations) vs. bread wheat (genotypes) • Evolution of meta-populations] e.g., Hourani Durum wheat LR, Tabasi Bread wheat LR • Dynamic evolution of diversity • Combined human and natural selection • Gene complexes, within & among genotypes
Why WLRs are important? • Future increases in productivity • …mostly will be needed/made under biotic & abiotic stresses. • Wide adaptation (How nice! ; How wide?) • Narrow / specific adaptation • Conservation of GD
What are the potentials of WLRs? • WLR shaped & molded to: • Meet diverse needs and end-uses • Meet diverse cultural practices • Respond to changing socio-economic, and growing conditions. • Have /Provide Private & Public value [Utilization/On-farm Conservation ?]
What are the potentials of WLRs? • Agronomic potential • Biomass [Early vigor, weed competition, straw, fit crop-livestock integrated system]. • Root systems [Seminal vs. adventitious roots, numbers/timing, ] • Nutrients (protein content, HMW glutenins, composition, bioavailability) • Organoleptic/nutritional characteristics/quality [Farekah, Bulgur, Semolina, Cuscus, Farro, wholemeal bread, etc.]
What are the potentials of WLRs? • Eco-physiological potential • Emergence/ coleoptiles • Facultative types • W & NUE (uptake) • Soil biota/ Mycorrhiza/root investment • Translocation of PS (stem reserves), Grain FP/Duration • Temp/ET [dT]
Future value of WLRs? • How strongly our food traditions can be linked to the conservation of wheat landraces, • How does increased knowledge of food traditions and improved culinary arts help create or expand market demand for wheat landrace products,
Future value of WLRs? • How environmental factors can impact quality and culinary attributes of wheat landrace products, • How does the accrued knowledge, along with on-farm conservation, improve livelihoods of individual farmers and rural communities? • Potential “Trans-domestication” of WLR!
Why WLRs are important? • Adaptation: • Local adaptation, low-input, drought, management practices, e.g., variable seeding rate/depth – emergence, compensation, facultative LRs • Yield stability / Responsiveness (?) • – Different genotypes, wide range of yield potential, GxE. • Disease buffering capability • Temporal & spatial
[Q2].Practical guidelines: How to Restore & Maintain (Advance) LRs on the Farm?
Germplasm Collection & Conservation • Genebanks – Freezing the genetic landscape • Queen Hatshepsut • Vavilov [VIR] • IBPGR 1970s-1990s • IPGRI 1993> Biodiversity > Bioversity International • NPGS-GRIN
Dynamic Conservation and Sustainable Utilization of WLRsOn-Farm Conservation of WLR: • Sustainable management of LR germplasm within traditional agricultural systems ……. “Because in situ (on-farm) conservation has continued into the present ……..does not ensure that this de facto strategy for conserving PGR will continue into the future”
On-Farm Research, Breeding, Selection, and Seed Exchange Programs of WLR [PPB] “to meet needs of low-input, small-scale farmers in marginal areas [LCDs]”
Wide range of stakeholders are involved (Expertise, interests, end-use value) • Identify farmers’ / stakeholders’ needs • Identify sources of variation/parents • Design crosses-selection-evaluation-testing-quality-product(s). • Seed multiplication – maintenance of GD – seed exchange • Can deliver more benefits to all stakeholders –
Approaches for breeding and selecting WLR for organic and low-input systems:
[1]. Selection is carried out under conventional farming conditions and organic farmers are expected to test released wheat varieties and select the ones that perform well under their particular organic conditions,
[2]. Initial crosses and early selections are focused on traits required in conventional systems, but advanced generations are evaluated and selected under organic conditions,
[3]. Crosses and selection strategies focus on traits demanded by the organic sector and selection is carried out under organic conditions throughout the breeding and selection program. ……....... [Temporal stability of quality traits, GxE]
On-Farm Participatory Research, Breeding and Selection of [W]LRs • Demand for different varietal traits is poorly understood • High variability of the agro-ecological setting • Adoption of modern varieties? • Emerging markets? • Participatory research (risk) vs. Participatory learning • Who leads, who follows? • When do farmers should get involved?
How to restore & maintain LRs on the farm? • On-Farm Conservation of WLR: • “Sustainable management of LR germplasm within traditional agricultural systems” • Natural laboratory – Evolution • Methodology: Little progress – • Practical difficulties • Changes in / loss of traditional farming systems • Land-use options • Loss of IK • Rural economy – demographics
On-Farm conservation strategies • …range from simple to complex activities, depending on: • The species and its characteristics (e.g., durum or bread wheat, hulled or free-threshing, etc.) • Spatial variation, habitats. • Level of GD • Economic value • Level of threat • Available financial and human resources
On-Farm Conservation: The focus is on GD conservation within a particular farming system On-farm Management: The focus is on conserving traditional farming systems, then [not] on GD of LRs.
Suggesting General guidelines “may” be “problematic” because: • Very few on-farm conservation “models” • Farmers’ variable attitudes, approaches and practices. • Emphasis on Economic & Food Security NOT Conservation
Suggesting General guidelines “may” be “problematic” ……… • Farmers de facto practiced on-farm conservation and on-farm management for thousands of years…. • Objective: Combine high yield and food security • Based on Within- and Among-species diversity • A major factor in On-Farm Conservation is: • “HOW Farmers Select and Retain Seed for next growing season?” • Selection is based on: • Yield • Quality • Resistance/tolerance to biotic/abiotic stresses
Guidelines ….. • Position “On-farm conservation” within PGR conservation context • Practice a “general” model for on-farm conservation • Develop /Advance the “science” of “on-farm conservation”
Empirical Model • To Improve targeting • Households likely to (continue) grow LRs, and • LRs most likely to be grown • Pr(LRj = 1) = f(b0+b1*SE+b2*PC+b3*MA+b4*VC+b5*AZ+e)
The probability of growing LR on plot (field) j is a function of: • SE: Socioeconomic factors • Years of farming experience of decision maker • Years of education of decision maker • Total farm area • Land ownership category • Ownership of livestock, etc.
The probability of growing LR on plot (field) j is a function of: • PC: Land (parcel, field) characteristics, • Irrigated/dry land • Land quality • MA: Market access, • Distance to market/processing facilities • Knowledge of market needs • Diversity of crops / LRs available in market, etc.
The probability of growing LR on plot (field) j is a function of: • VC: Crop Landrace (Variety) characteristics, • Yield potential • Biotic/abiotic tolerance • Suitability for soil type • Bread/secondary product quality • Wheat residue for animal feed • AZ: Agro-ecological Zone.
1.Project planning & establishment • 1.1.Select site, community & farmer(s) for effective on-farm conservation • 1.2.Ensure maximum possible GD of [W]LR (or any other crop) • 1.3.Info on amount/structure of GD [which traits?] • 1.4.Identify/understand farmer’s needs… impact on management of GD • 1.5.Identify sources of [W]LR germplasm:
1.5.Identify sources of [W]LR germplasm: • Hi GD, Interest of local farmers/community in GD, Threats to GD, Knowledgeable/practicing farmers in managing/manipulating GD • The “Hu” factor: • Diversity of rural community, Age, Gender, Financial resources, Social status, Ethnicity. • Socio-economic survey.
2.Project management & monitoring • Depends on: Location, target crop (Old variety, LR, open-pollinated, cross-pollinated, annual, perennial) • Local community, Who (stakeholder) is involved? Available resources.
2.Project management & monitoringTasks: • 2.1.Identify the context of management/monitoring • (GD conservation, farming system conservation/management). • 2.2.Specify target crop(s) • 2.3.Description of LR(s) – phenotypic/genetic • 2.4.Findings of socio-economic survey – locations/farmers. • 2.5.Assessment of potential genetic erosion • (potential causes: socio-economic, biotic, etc.) • 2.6.Training and research needs • 2.7. Strategy to monitor: • Potential causes of genetic erosion, • Potential impact of interventions on GD • 2.8.Strategy ..how to use GD?
Practical Questions: • Frequency, size, nature, and coverage of (seed) sampling. • Timing of (seed) sampling. • Traits to be assessed / evaluated. • Data analysis / reporting, dissemination. • Documentation of management practices
3.On-farm sustainable utilization of diversity • 3.1.Link genetic conservation-sustainability-utilization • 3.2.Should facilitate present/future PGR use • 3.3.Utilization: • Traditional, General, Professional. • 3.4.Farmers as direct users • 3.5.Ex situ conservation of PGR produced on farm: • Availability (other users) • Re-introduction (e.g., Ethiopian Durum WLR) • 3.6.Conservation – contribution to quality of life of local community.
Current/Future Needs for Sustainable On-Farm Conservation: • (1).Awareness – benefits of locally-grown adapted [W]LRs • (2).Access to PGR of adapted [W]LRs • (3).Improved traits: • Agronomic, • Phenotypic, • Quality • ……. of value to farmers/users/consumers • (4).Increased access to markets … competition with “others” • (5).Direct/indirect support for On-farm dynamic conservation & sustainable utilization of local [W]LR GR. • (6).Farmer Networks, Community Seed Exchange Systems, Community Seed Banks.
[3].Community Seed Banks [CSB]—their value, and how to restore them? • A community currency alternative • IK of biological resources --> derive a livelihood from nature • CSB allows farmers access to planting material they desire, • whilst maintaining (advancing) agro-biodiversity.
CSBs-How to implement? • In situ (On-farm) conservation…. • Farmers as stewards of crop diversity, growing out varieties as a method of varietal conservation • NGOs (and others) …developed CSBs to: • Facilitate these conservation activities, and • Allow farmers’ access to a wider range of material than is normally available. • How do they function? • Parallel with existing (traditional) “Genebanks” and seed exchange systems, • Build on traditional Genebanks
CSB Categories • De facto CSBs, • Community Seed Exchange, • Organized Seed Banks, and • Seed Savers’ Networks
Objectives: • Farmer seed security, and • Biodiversity conservation
Questions? • How best to work with existing seed banking practices? And • How to resolve the (seemingly) conflicting requirements of varietal conservation and the socio-economic needs of farmers?
[1]. De facto (individual household) Seed Banks: • 1-1.Most numerous informal seed multiplication, storage (exchange) system. • 1-2.Farmers prefer to obtain their seed locally • (adaptation, availability of information on quality) • 1-3. Gender relations & influence on type of seed • 1-4.Selection methods/timing • (pre- or post-harvest, individual/bulk, etc.)
[1]. De facto (individual household) Seed Banks: • 1-5.Stored seed quality • (physical/biological/viability/etc.) • 1-6.Equity/hierarchy of access? • (Timing and amount …) • 1-7.Advantages: • Seed of known quality • Small amounts / emergency seed timely available • Famers can pay for seed in a variety of ways.