Process Analysis and Design Improvement of a Heavy Duty Electric Actuator at Governors America

Process Analysis and Design Improvement of a Heavy Duty Electric Actuator at Governors America. By: Anthony Mone And Michael Butt Advisor: Dr. Abdul Kamal. Overview. Brief Company History Problem Statement Solution Approach Deliverables Initial Work Future Work Questions.

Download Presentation

Process Analysis and Design Improvement of a Heavy Duty Electric Actuator at Governors America

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Process Analysis and Design Improvement of a Heavy Duty Electric Actuator at Governors America By: Anthony Mone And Michael Butt Advisor: Dr. Abdul Kamal

  2. Overview • Brief Company History • Problem Statement • Solution Approach • Deliverables • Initial Work • Future Work • Questions

  3. Governors America Corp. • Privately owned corporation, founded in 1986. • Resided originally in downtown Springfield until it moved to Agawam, MA in 1991 due to an increase in profit and production. • GAC’s Quality Assurance Group has established and implemented a quality system that complies with the directives of ISO9001 standards. • Currently the company is generating annual revenue of $12,000,000 controls roughly 60% of its market.

  4. Problem Statement • Develop an accurate process sheet for every operation and evaluate and improve the current 176AA actuator production line • Reduce costs of production, waste, and takt time • Increase throughput and improve quality • Governors America Corp. currently has no process sheets for the 176AA actuator production line. These process sheets will be beneficial to setting a standard to reduce variability in production. Once completed, the production line will be analyzed and improvements made.

  5. Solution Approaches • Creating Process Sheets • Develop Standards • Develop Flow Charts • Determine Defects • Apply Lean Manufacturing • Analyze Production Safety and Ergonomic Issues • Simulate the Production Line

  6. Deliverables • Current and accurate process plans for the 176AA actuator • Accurate time standards • Reduced WIP • Reduced waste and defects • Decrease cost • Increase throughput

  7. Initial Work • Documented processes via digital imagery and video recording for use in writing process sheets. • Created rough schedule for first semester. • Developed flow chart. • Begun to look at machining draft of assembly housing, to design inspection fixture. • Developed crude simulation, based on standards projected in routing sheets.

  8. Flow Chart

  9. First Semester Schedule

  10. ABET • Manufacturability • Health and Safety • Economic Concerns • Sustainability • Ethical Concerns

  11. Future Work • Start to write process sheets from video recordings. • Perform time studies. • Identify most value added operation for starting point for improvement. • Determine defects of production

  12. Questions?