An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GNWT INFRASTRUCTURE PLAN INDUSTRY DAY – 17 January 2019

  2. 2019/20 Infrastructure Acquisition Plan The GNWT’s 2019/20 proposed Infrastructure Plan totals $343M. The proposed plan continues to leverage significant federal infrastructure dollars. Addressing the GNWT’s energy priorities and responding to our infrastructure challenges continue to be a focus of this government.

  3. Infrastructure Acquisition PlanBudget Trends $M

  4. FY 19/20 INFRASTRUCTURE PLAN

  5. FY 19/20 INFRASTRUCTURE PLAN

  6. LARGE CAPITAL PROJECTS

  7. LARGE CAPITAL PROJECTS

  8. SMALL CAPITAL PROJECTS

  9. GNWT Infrastructure Planning and Acquisition For copies of the FY 2019/20 capital plan, reference the following GNWT website: • https://www.fin.gov.nt.ca/en/resources Thank you

  10. INFRASTRUCTURE - Transportation 2019/20 Large Capital Project Plan

  11. Transportation

  12. Structures

  13. Structures

  14. Surface Design and Construction

  15. Surface Design and Construction

  16. Surface Design and Construction

  17. INFRASTRUCTURE – Strategic Projects New Corridor Projects

  18. Infrastructure – Strategic Projects • Tlicho All Season Road (TASR) • Mackenzie Valley Highway (MVH) • Slave Geological Province Corridor (SGP) • Talston Hydro Feasibility Study

  19. Questions? Binay Yadav Director Transportation Department of Infrastructure Contact: P – 867 767-9086 ex 31105 F – 867 873-0288 E – Binay_Yadav@gov.nt.ca

  20. GNWT Infrastructure Plan Summary/ Conclusion Questions