UNCLASSIFIED

UNCLASSIFIED. Air Force Research Laboratory Update R. Craig Mellerski, Civ, DAF Aircraft Operating Surfaces - Pavements Airbase Technologies Division Tyndall Air Force Base, Florida April 2012. FAA Airport Pavement Working Group Meeting, 23 July 2009 .

euclid
Download Presentation

UNCLASSIFIED

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNCLASSIFIED Air Force Research Laboratory Update R. Craig Mellerski, Civ, DAF Aircraft Operating Surfaces - Pavements Airbase Technologies Division Tyndall Air Force Base, Florida April 2012 FAA Airport Pavement Working Group Meeting, 23 July 2009 Distribution A: Approved for public release; distribution unlimited. PENDING

  2. Presentation Outline Who we are Pavement aircraft tie-down research Airfield rubber removal research High temperature resistant pavement research Aircraft arresting system research Rapid airfield repair research Airfield damage repair (ADR) modernization program Distribution A: Approved for public release; distribution unlimited. PENDING

  3. Mission Statement AIRBASE TECHNOLOGIES DIVISION Provide Transformational Science and Engineering Solutions for Agile Airbase Operations Distribution A: Approved for public release; distribution unlimited. PENDING

  4. AFRL Overview Airbase Technologies Division - Where does the lab fit? HQ USAF HQ AFMC AFRL RX Materials and Manufacturing Directorate RXQ Airbase Technologies Division Distribution A: Approved for public release; distribution unlimited. PENDING

  5. What We Do Distribution A: Approved for public release; distribution unlimited. PENDING

  6. Facilities / Equipment Asphalt lab Soils lab Material Testing lab Coring Machine C-17 Load Cart (277,000 lbs) Heavy Weight Deflectometer F-15E Load Cart (35,000 lbs) Distribution A: Approved for public release; distribution unlimited. PENDING

  7. Facilities / Equipment Flight Line Silver Flag (6000 ft × 125 ft Pavement) AFRL 9700 Area (600 ft × 60 ft PCC) (600 ft × 60 ft HMA) (100 ft × 60 ft Covered testing) Main Base AFRL Bldg. 1117 Gulf of Mexico Distribution A: Approved for public release; distribution unlimited. PENDING

  8. Rigid and Flexible Pavement Aircraft Tie-downs Data Cable Objectives • Test traditional shepherds hook PCC and AC tie-downs to determine pull-out capacity • Test contingency (Hat-type and Neenah) tie-downs to determine pull-out capacity • Develop and install simplified AC tie-downs and test to determine pull-out capacity • AFCESA categorizes aircraft tie-downs according to vertical pull-out capacity: • Lightweight capacity—17 kip pull-out resistance • Heavyweight capacity—37.7 kip pull-out resistance Load Cell Lifting Hoist Tie-down AFRL Anchor-Pulling Apparatus • Technical Approach • Research and test existing traditional aircraft tie-downs • Install and test contingency PCC tie-downs on AOS test-pad • Install and test contingency AC tie-downs in three different subgrades • Identify installation and performance issues • Implementation/Path Forward • Providing Installation kits to FOB locations • Developing protocol and equipment for field certification of existing anchors • Developing common design for both rigid and flexible pavements Distribution A: Approved for public release; distribution unlimited. PENDING

  9. Ultra High Pressure Rubber Removal Objective • Compare UHPRR Systems • Test and Evaluate TrackJet® • Performance • Deployability • Environmental impact • Ease of operation • Technical Approach • Procure equipment using FCT Program • Train personnel • Conduct rubber removal operations • C-130 deployable • Comparison with domestically manufactured systems • Implementation/Path Forward • Developed evaluation plan • Test locations at Randolph AFB, Tinker AFB, and Camp Shelby • Comparison with detergent rubber removal systems • Draft technical report Distribution A: Approved for public release; distribution unlimited. PENDING

  10. Detergent based Rubber Removal Objective • Evaluate • Detergent rubber removal system under expeditionary conditions • Dissolve and remove rubber from pavement surface and restore micro/macro textures • Technical Approach • Pre-deployment preparation • C-130 deployable • Conduct rubber removal operations • Demobilize to home base • Status • Performance assessment • Air transportability – successful • Rubber removal – successful • Cost effectiveness – successful • Comparison with ultra high pressure rubber removal systems • Draft technical report Distribution A: Approved for public release; distribution unlimited. PENDING

  11. Geopolymer Research Objective • Develop concrete of high thermal resistance for potential use in JSF launch pads • Optimize mechanics • Increase durability using various fiber materials within matrix • Move towards ambient cure • Technical Approach • Optimize alkali-pozzolanic binder • Investigate micro-chemistry • Vary aggregate and fiber types • Employ different curing methods • Thermal/mechanical load testing • Final report / ETL • Implementation/Path Forward • Investigated effect of constituents on thermal resistance • Investigating effect of fly ash variability on product • Perform rheometry and calorimetry to investigate component contribution to ease of construction Distribution A: Approved for public release; distribution unlimited. PENDING

  12. High Temperature Resistant Flexible Pavement Objective • Develop flexible binder based (asphalt) high thermal resistance pavements • Optimize mechanics • Develop solutions to transfer loads as a layered structure • Technical Approach • Literature review • Investigate novel materials and modifications to existing materials • Vary coarse and fine aggregates • Thermal/mechanical load testing • Final report / ETL • Implementation/Path Forward • Investigated effect of constituents on thermal resistance • Investigating effect variability of different products • Down select potential solutions Distribution A: Approved for public release; distribution unlimited. PENDING

  13. Aircraft Arresting System (AAS) Retrofits Objective • Update pavement smoothness criteria for expeditionary AAS • Review existing smoothness/imperfection criteria • Develop new criteria to safeguard against tailhook skip • Technical Approach • Review existing pavement roughness and repair criteria • Model performance of tailhook skip • Evaluate roughness measurement devices • Evaluate device/participate in tests • Develop TTPs • Implementation/Path Forward • Investigate different roughness measuring devices • Field validate models • Down select potential solutions Distribution A: Approved for public release; distribution unlimited. PENDING

  14. Precast Concrete Panels for ADR Objective • Research current precast concrete panel technology • Install precast concrete panels using different bedding materials • Traffic precast panels and evaluate: • Installation method • Bedding material • Load transfer Technical Approach • Install precast concrete panels on AOS test-pad, utilizing the following bedding materials: • Uretek foam, direct-injection • Uretek foam, deep-injection • Flowable fill • Traffic precast panels 1500 passes with F-15E load cart • Use heavy-weight deflectometer (HWD) to collect load transfer data before, during, and after trafficking operations Precast Concrete Panel Installation • Implementation/Path Forward • Determine the most efficient distressed slab removal and precast concrete panel installation method • Investigating multi-panel emplacements for contingency locations • Developing a repair kit Distribution A: Approved for public release; distribution unlimited. PENDING

  15. Pelletized Asphalt / CRATR JCTD 2” 0 1” Objective • Evaluate • Pelletized asphalt technology for ADR • Deployable HMA plant to produce airfield quality HMA • Develop appropriate TTPs • Technical Approach • Laboratory and field studies • Develop/evaluate TTPs • Limited operational utility assessments I and II (LOUA I & II) • Operational utility assessment • Implementation/Path Forward • Performance verified using live aircraft tests • Equipment procurement in processfor ADR Modernization Program • Repair kits being revised to include updated equipment and materials Distribution A: Approved for public release; distribution unlimited. PENDING

  16. HMA Transport for ADR Objective • Determine if bottom dump trailer could be used instead of four dump truck loads of HMA • Capable of storing, transporting and placing 18 to 24 tons of asphalt • Capable of being used in freezing temperatures • Technical Approach • Availability and cost of existing material transport vehicles • Evaluate the need for modifications • Investigate vehicle insulation • Conduct thermodynamic analysis (temperature loss) • Implementation/Path Forward • Determine the most efficient method to insulate to allow for longer storage of material • Investigating load and handling of equipment for contingency locations • Develop ETL Distribution A: Approved for public release; distribution unlimited. PENDING

  17. Spall Materials Research Objective • Subject numerous spall repair materials to lab and field tests • Use test results to determine optimal material for permanent rapid-setting spall repairs of airfield runways • Technical Approach • Select materials for evaluation • Mechanical / thermal testing • Down-select four final materials • Sensitivity tests on final four • Classify each by performance • Final report / ETL • Implementation/Path Forward • Posted material performance test data on central DOD website • Fostered competition among repair material vendors Distribution A: Approved for public release; distribution unlimited. PENDING

  18. Spall Methods and Equipment Research Objective • Field test various equipment types and excavation methods • Evaluate surrounding slab and underlying strata for damage • Develop excavation and repair method allowing material placement within 15 minutes or less • Technical Approach • Field excavation trials: • Jackhammer, gang saw, hydraulic ram, cold planer • Excavation time vs. final repair quality and bond strength • Load cart testing and analysis • Final report / ETL • Implementation/Path Forward • Recommended new equipment and procedures to decrease repair times and enhance performance • Recognized by TRB’s K.B. Woods Award Distribution A: Approved for public release; distribution unlimited. PENDING

  19. Asphalt Sustainment Kit Evaluation Objective • Assemble equipment and materials to conduct airfield damage repairs in sustainability environment • Evaluate the vehicles • Minimize redundant equipment • Determine equipment effectiveness • Simplicity of equipment set • Technical Approach • Field testing of materials • Lab testing of materials • Full scale field tests • Identify issues • Report • Implementation/Path Forward • Verification with simulated aircraft loads completed • Supplement repair kits in ADR modernization program • Materials and equipment enhance to the ADR repair kits Distribution A: Approved for public release; distribution unlimited. PENDING

  20. USAF Areas of Interest • Equipment to quickly remove pavement in small areas • Materials that set quickly, cheap, and long shelf life • Lightweight matting for military aircraft loads • Quick assessments of damaged airfields • ‘Green’ technologies • Sustainment • Frangible structures Distribution A: Approved for public release; distribution unlimited. PENDING

  21. Questions Distribution A: Approved for public release; distribution unlimited. PENDING