1 / 26

WisDOT Updates

ACEC/WisDOT Transportation Improvement Conference. WisDOT Updates. March 10, 2011 Jerry Zogg, P. E. WisDOT – Bureau of Project Development. WisDOT Updates. Preventive Maintenance (PM) Agreement 3D Technology Initiatives in: Design Construction. PM Agreement. PM Agreement.

Download Presentation

WisDOT Updates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ACEC/WisDOT Transportation Improvement Conference WisDOT Updates March 10, 2011 Jerry Zogg, P. E. WisDOT – Bureau of Project Development

  2. WisDOT Updates • Preventive Maintenance (PM) Agreement • 3D Technology Initiatives in: • Design • Construction

  3. PM Agreement

  4. PM Agreement Current Status: • PM Agreement executed by WisDOT and FHWA in Nov 2010 • WisDOT published the new PM Agreement and FDM 3-1-5 in FDM Transmittal No. 379 on 12/21/10

  5. PM Agreement Key Improvements: • Provides definition of a “pavement in good condition” to better clarify eligible work • Reformatted PM Agreement for easier use by creating table of eligible work and requirements.

  6. PM Agreement

  7. PM Agreement Key Improvements (con’t): • Identifies 3 Groups of Pav’t Treatments • Provides proper balance between: • Engineering efforts • Safety requirements • Need to preserve infrastructure

  8. PM Agreement

  9. PM Agreement Key Improvements (con’t): • Provides more flexibility to allow substandard roadside slopes to remain depending on crash history • Allows PM projects to continue if safety issues identified. Document safety issues and address with future programming

  10. PM Agreement • Abbreviated DSR for some PM Projects • In-house Statewide Webinar on new PM Agreement on April 11

  11. 3D Initiatives Design & Construction

  12. Building Information Modeling

  13. 3D InitiativesDesign & Construction Today’s Topics: • Civil 3D Implementation • 2011Pilot Efforts on USH 10 • Use of WisDOT produced 3D Models • Automated Machine Guidance (AMG) for HMA Base Course • Building Information Model (BIM) Implementation in SE Region

  14. Civil 3D Implementation • Began statewide implementation mid-July of 2010 • Currently have approx: • 130 staff statewide engaged in training • 15-20 projects underway • Have requested Regions to begin new projects with Civil 3D • Methods Staff: • Rick Larson • Brad Hollister • Eric Arneson • Lisa Herrmann

  15. Pilot Efforts – USH 10 • Wis Rapids in-house staff wrapping up 4 major grading/base/paving projects in Civil 3D • 1st - 3D Models designed/produced in Civil 3D • Key PD staff: • Nick Voss • Kyle Harris • Kevin Garrigan • Jeff Stewart • Matt Bronson

  16. Next Steps for 3D Models • Determine ultimate requirements for 3D Models • Feedback from USH 10 pilots very important • Set future dates for: • 3D models to be a required PSE deliverable • SunsettingCAiCE • Transitioning out of Microstation for Roadways

  17. Next Steps for AMG • Finalize AMG spec for HMA base & incorporate into Std Specs • Begin efforts to prepare for the use of AMG for: • PCC pav’t & base • HMA pav’t • Above uses of AMG will require combination of • GPS • Laser to achieve vertical accuracy

  18. BIM Implementation in SE • Static/Mobile LiDAR - Data Collection: Integrated Static/Mobile LiDAR Project-Zoo IC • BIM/CAD - Design/Construction: 3D-4D BIM Pilot Project-Mitchell IC Tunnels/Zoo IC • AMG Grading/GPS Rovers-Construction Inspection: I-94 North-South Project • BIM/GIS - Assets/Infrastructure Lifecycle: O&M-As-Builts, Planning-PIP, etc.

  19. BIM Implementation in SE

  20. BIM Implementation in SE

  21. BIM Work Flows & Data Flows WisDOT Design-Construction Oversight/Integration/Coordination Roadways, Structures, Geotech, Utilities, FTMS, Signals, Survey, Geotech, Materials, Traffic, Environmental, Materials Lighting Environmental Clash Detection, Analysis, Simulation & Visualization (Navisworks/Navigator) Clash Resolution (Navisworks/ Navigator-Civil 3D Microstation) (RFIs/DINs/Plan Revs) Existing & Proposed 3D Models (MS/In-roads & C3D to LandXML to Navisworks & Revit Structures/MEP to Navisworks + Construction Tasks/Sequences/Scheduling (Primavera Expedition/MS Project Schedules to Autodesk Navisworks/Bentley Navigator) Paving/Structures/Misc- (Roads, Ramps, Tunnels, Bridges, Ret./Sound Walls, Sign Bridges, RRs, PM, Traffic, Geotech, etc.) Surfaces-DTMs/TINs (Conventional/Photogrammetric /GPS/LiDAR generated DTMs & Field-checked DTMs) Utilities-UG/AG/OH (Storm, Sanitary, Water, Electric, Gas, FO, TV, Tel, Comm, FTMS, Lighting, Fire Protection, etc.)

  22. BIM Implementation in SE 3D-4D BIM - Mitchell IC TunnelsExisting & Proposed

  23. BIM Implementation in SE3D-4D BIM - Mitchell IC Tunnels – Proposed

  24. BIM Implementation in SE 3D-4D BIM - Mitchell IC TunnelsProposed with Utilities

  25. BIM Implementation in SE 3D-4D BIM - Mitchell IC Tunnels Construction with Schedule

  26. Great Week in WI Sports ! Super Sunday ! Spectacular Saturday !

More Related