An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Experimental FacilitiesJohn HillCFAC review October 18th , 2006

  2. NSLS-II Beamlines • 15 five m straights for user undulators • Could potentially drive up to 30 beamlines by canting two undulators • 4 eight m straights for user undulators • Could potentially drive up to 12 beamlines by canting three undulators • 8 eight m straights for user damping wigglers • Could potentially drive up to 24 beamlines by canting three DWs • 20 BM ports for UV and soft X-rays • 10 BM ports for IR • 5 large aperture for far-IR • 5 regular aperture for mid/near-IR At least 57 beamlines Many more w/ mulitple IDs per straight (plus possible multiple hutches per beamline)

  3. Beamlines BROOKHAVEN SCIENCE ASSOCIATES Soft x-ray Undulator line (8m straight) hard x-ray Undulator line (8m straight) Hard x-ray Undulator line (5m straight) BM line Hard x-ray Undulator line (5m straight) BM line IR hutch Soft x-ray Undulator line (8m straight) Remote endstations

  4. Beamlines • Conceptual or pre-conceptual designs exist for a number of beamlines: • Inelastic X-ray Scattering • Nanoprobe • Hard x-ray Coherent scattering • Soft x-ray Imaging and coherent scattering • Soft x-ray resonant elastic and inelastic scattering • High magnetic field • High Energy • Small Angle X-ray Scattering • Infra-Red • Imaging • Damping Wigglers • Protein Crystallography • Electron Spectroscopy • Bending Magnet Superconducting Magnet NSLS II Experimental floor

  5. Long Beamlines X-ray enclosure Airlock Utilities tray Heavy access door Optical pipe X-ray beamline

  6. Usage of Facility NSLS-II NSLS Type IDs BMs Total IDs BMs Total A IR/UV/soft x-ray spectroscopy 1 11 12 3 7 10 B X-ray spectroscopy 6 3 9 0 9 9 C soft-matter/biophysics scattering 4 0 4 0 8 8 D hard matter/strongly correlated 9 1 10 3 5 8 E powder/single Xtal/high-P/optics 7 3 10 3 8 11 F Imaging/micro-probe 4 5 9 2 7 9 G Macromolecular crystallography 7 0 7 2 8 10 Totals 38 23 61 13 52 65 Possible strawman beamline distribution and comparison with current NSLS usage:

  7. Beamline Distribution: Insertion Devices Beamline Type IR/UV/soft spect X-ray Spect. Soft Matter Hard Matter Powder/Hi-P/optics Imaging/Microprobe PX Blocked Open

  8. Beamline Distribution: Bending Magnets Beamline Type IR/UV/soft spect X-ray Spect. Soft Matter Hard Matter Powder/Hi-P/optics Imaging/Microprobe PX Blocked Open BROOKHAVEN SCIENCE ASSOCIATES

  9. Tentative Process & Schedule 2007 2008 2009 2010 2011 2012 2013 2014 2015 Full proposal CDR TDR CDR TDR Construction Commiss- ioning LOI: Select BATs Project BATs TDR LOI: Select BDTs Construction Commiss- ioning Initial BDTs Possible MIEs ? Possible MIEs BO Ring bldg 1st beam

  10. Noise and Stability • One issue users care a lot about is noise: • Mechanical • Isolate sources of noise • Pay attention to vibration damping (thick slab) • Electrical • Clean (conditioned) power • Dirty power • High quality grounds for each • RFI • Shield NEXRAD • Shield local sources (Storage Ring RF cavities)

  11. Summary • Facility will ultimately support ~60+ beamlines and >3000 users. • Conceptual designs have been carried out for a number of beamlines to inform a detailed cost estimate, and a number of others at a pre-conceptual level. • A small number of beamlines will be built as part of the construction project utilizing a trust fund approach. These will begin commissioning in 2013. • Remaining beamlines will be built with other funds (MIE and other non-BES funds) and brought online in the following years.