The Old Dominion University ASV team, co-captained by Chris Shertzer and Ben McKinley, along with advisor Dr. Gene Hou, showcases the design and technical specifics of their autonomous boat for the AUVSI Roboboat Competition. With a focus on visual processing for navigation, the design utilizes a modular framework of lightweight aluminum for optimal performance. Key features include hydrostatic analysis, innovative propeller designs using 3D printing, and real-time image processing for automated docking challenges. The project budget totals $10,483.

erv
Download Presentation

Innovative Design Strategies for Autonomous Boat in AUVSI Roboboat Competition

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Old Dominion ASV team Chris Shertzer, Co-Capt. Ben McKinley, Co-Capt. Adam Stofko Richard Blanchette Brittany Garman GaneshBalasubramanian Zach Carpenter Dr. Gene Hou Advising Professor

  2. The Roboboat Competition • Competition Conducted by AUVSI • Association for unmanned vehicle systems international • Design autonomous boat • Visual processing for Navigation • Competition Scoring based on Static Judging and Competition Challenges

  3. Scoring breakdown

  4. Hull and Deck Design • Design of Deck • 1 ¼” x 1¼” x 1/8” 6061-T6 aluminum angle bar • 20”X40” rectangular frame • Modular challenge systems • ¼” holes ever inch along the longitudinal rains will allow for the mission systems to be located in to provide for the desired longitudinal center for gravity (LCG) • 1/8” 6061-T6 pontoon supports will allow for easy attachment of pontoons and motorized wheels for ground testing. • 1 ¼” SCH 40 aluminum piping and milled 6061-T6 aluminum for motor mount. • Design of Pontoons • Length over all (LOA) 56” • Beam of 8” per pontoon • Separation length ratio (S/L) or .42 • 1/8” 6061-T6 aluminum construction. Current Hull & Deck Design

  5. Hydrostatic and Holtrop Analysis from ORCA 3D and GHS • Hydrostatics and Holtrop Analysis • Maximum Displacement of 198 lbs • Design draft 3.76 in 80 lbs • Total resistance of 9.6 lbs at maximum speed of 5 Kts

  6. Minn Kota Propellers • The Minn Kota propellers were tested using the old ASV hull • Pitch: 3.49 in or 88.78 mm • High Aspect ratio • Thrust: 133.45 N • 2 blades • To reduce the dip experienced in the test trial, smaller propellers were designed • The number of propeller blades was increased from 2 to 3 to add stability

  7. OpenProp Propeller • OpenProp Input Variables: • hub diameter: .08 m • number of blades: 3 • rotation speed: 1710 RPM • rotor diameter: .228 m • required thrust: 133.45 N • ship speed: 5 m/s • # radial panels:20 • # chordwisepanels:20 • fluid density: 1000 kg/m3 • OpenProp design simulation is exported to SolidWorks • Propeller will be printed in plastic by a 3D printer

  8. Kort Nozzle Design • Design of nozzle • 4.72inch inner radius • 3.75inch nozzle length • 40% area increase from blade tip to nozzle opening • Notched for clamping around the torpedo cap. • 3D printed using ABS • Weighs 2.38lbs Current Kort nozzle design Minn Kota Torpedo

  9. CFD & Testing NACA 10 nozzle flow data Shear Stress • Testing • Bare nozzle tested using CFD • Ideal speed is 2.53 m/s • Digital Hanging scale Velocity Profile

  10. Automated Docking Challenge • Shape recognition and buoy color detection. • OpenCV library for shape location from real-time image. • Boat must dock temporarily to complete challenge.

  11. Filtering and Processing • Frame taken from webcam • Greyscale conversion • Applying Color Threshold • Canny interpretation • Masking

  12. Logic of Shape Detection • Calculate approximate Polygons • Count Vertices • Calculate angle at each vertex • Calculate Ratio of area’s • Constrain object with rectangle Vtc=3

  13. Gantt Chart

  14. Budgettotal$10,483

  15. Questions?