Past Producer Restart: Long track record of production 420 MM lbs Cu from 1971-1984

Redeveloping the Granduc. Capital Structure. The Granduc Copper Project is a low risk, high grade, long life past producer restart in an excellent mining jurisdiction with significant exploration potential. Symbol: CRI.V . Share Price: $ 0.70.

erol
Download Presentation

Past Producer Restart: Long track record of production 420 MM lbs Cu from 1971-1984

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Redeveloping the Granduc Capital Structure The Granduc Copper Project is a low risk, high grade, long life past producer restart in an excellent mining jurisdiction with significant exploration potential Symbol: CRI.V Share Price: $0.70 Indicated Resource Inferred Resource Shares Issued: 106 million Fully Diluted: 138 million Market Cap: $75 million 52 week hi/low: $0.95 - $0.14 Cash: $11 million • Past Producer Restart: • Long track record of production • 420 MM lbs Cu from 1971-1984 • Clean concentrate 29% Cu, Au/Ag credits • Built & operated by Newmont and Esso Resources • Brownfield site • Large Bluesky Potential: • Multiple resource zones • Over 4 km long strike identified • Strong EM anomaly to the north • Excellent Jurisdiction: • B.C. provincial process • Low cost power supply • Strong community support in Stewart B.C. • Permitting underway • Straightforward Project: • Rehab 17km tunnel ($5 million, 4 months) • New mill (8,500 tpd) Mine Rehab (E$400 million, 24 mths)

  2. Fact Sheet Q3 2011 2011 2012 2013 Complete PEA Initiate Feasibility Study Permitting Underway Complete Environmentals Tunnel/Mine Rehab 35,000 m drill program Update NI 43-101 Environmental Studies Underground Rehab Hydro Contract Detail Engineering Begin Construction Mining Operations Production Rate 8,500 tpd Sub Level Cave Mining Methods Copper Production 80-100 mm lbs Cu Eq /yr. Operating Cash Flow $100 mm/yr @ $3.50 Cu/lb • COMPANY MANAGEMENT • Mike Sylvestre – President & CEO • Lenny Foreht – VP Corporate Development • Brad Leonard – VP Exploration • Eric Szustak – CFO • BOARD OF DIRECTORS • Stephen Shefsky – Executive Chairman • Mike Sylvestre – Director • Lester Fernandez – Director • Tony Croll – Director • Tim Mann - Director CORPORATE HEAD OFFICE 20 Victoria Street Suit 800 Toronto, Ontario M5C 2NB PH (416) 364-2266 FAX (416) 364-2596 OPERATIONS ADDRESS 617 15 Ave. Stewart B.C. V0T 1W0 PH (250) 636-2261 www.castleresources.com