WUHAN: PC Line organization. Carl DE PONCINS. 25/01/2007. MAIN MESSAGE. OPERATORS MUST: Detect defect 检查出缺陷 Record defect in Kosu sheet 将缺陷记录在 KOSU 表上 Alert if problem 有问题时及时提出 ANY PERTURBATION MUST BE ELIMINATED. WHAT WAS DONE. NEW LINE INFORMATION BOARDS NEW END-OF-LINE STATION

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'WUHAN: PC Line organization' - elvis-young


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

WUHAN: PC Line organization

Carl DE PONCINS

25/01/2007

main message
MAIN MESSAGE
  • OPERATORS MUST:
    • Detect defect检查出缺陷
    • Record defect in Kosu sheet将缺陷记录在KOSU表上
    • Alert if problem有问题时及时提出
  • ANY PERTURBATION MUST BE ELIMINATED
what was done
WHAT WAS DONE
  • NEW LINE INFORMATION BOARDS
  • NEW END-OF-LINE STATION
  • NEW LOGISTICS
what was done4
WHAT WAS DONE
  • NEW KOSU SHEET
next actions
NEXT ACTIONS
  • BLUE BOXES IMPLEMENTATION
    • Target date: 29/01/2007
    • Pilot: He Jun
  • TRAINING SESSIONS TO DEFECTS (4 shifts)
    • Date: - every 2 weeks - 1rst session: 06/02 to 11/02/2007 (4 shifts)
    • Pilot: Luo Zhipeng
  • USE IRIS 4 STEPS ON THE LINE
    • Date: from 25/01/2007 onwards
    • Pilot: Qiang Zhou
defects rules
DEFECTS - RULES
  • CHECK SHEET
    • For the DEFINITION of the defects
    • Every 15 days a training session to defects will be hold
defects rules1
DEFECTS - RULES
  • WORK INSTRUCTION (2 SHEETS)
    • 1rst sheet: what must be done
    • 2nd sheet: standard of inspection including
      • Standard time for inspection
      • Eye path
iris system has 4 steps
IRIS SYSTEM HAS 4 STEPS
  • STEP1: INSPECT THE PART

第一步: 检查产品

If defect is questionable: 如果缺陷不易判断

  • STEP2: PUT ON IN-CAR POSITION FIXTURE

第二步: 将产品放在车身位置夹具上

If defect is visible: 如果缺陷是明显的

  • STEP3: USE CARD TO MEASURE PRECISELY第三步: 使用外观检查卡量度是否符合标准

If defect is still questionable: 如果缺陷仍然不易判断

  • STEP4: PUT ON IRIS RED RACK第四步: 将产品放在红车上
iris system has 4 steps1
IRIS SYSTEM HAS 4 STEPS
  • STEP1: INSPECT THE PART

第一步: 检查产品

If defect is questionable: 如果缺陷不易判断

  • STEP2: PUT ON IN-CAR POSITION FIXTURE

第二步: 将产品放在车身位置夹具上

If defect is visible: 如果缺陷是明显的

  • STEP3: USE CARD TO MEASURE PRECISELY第三步: 使用外观检查卡量度是否符合标准

If defect is still questionable: 如果缺陷仍然不易判断

  • STEP4: PUT ON IRIS RED RACK第四步: 将产品放在红车上
good bye
GOOD BYE

Thank you for your attention感谢大家的参与

Good luck

TOGETHER WE WILL SUCCEED一起工作我们才能成功