1 / 18

WUHAN: PC Line organization

WUHAN: PC Line organization. Carl DE PONCINS. 25/01/2007. MAIN MESSAGE. OPERATORS MUST: Detect defect 检查出缺陷 Record defect in Kosu sheet 将缺陷记录在 KOSU 表上 Alert if problem 有问题时及时提出 ANY PERTURBATION MUST BE ELIMINATED. WHAT WAS DONE. NEW LINE INFORMATION BOARDS NEW END-OF-LINE STATION

elvis-young
Download Presentation

WUHAN: PC Line organization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WUHAN: PC Line organization Carl DE PONCINS 25/01/2007

  2. MAIN MESSAGE • OPERATORS MUST: • Detect defect检查出缺陷 • Record defect in Kosu sheet将缺陷记录在KOSU表上 • Alert if problem有问题时及时提出 • ANY PERTURBATION MUST BE ELIMINATED

  3. WHAT WAS DONE • NEW LINE INFORMATION BOARDS • NEW END-OF-LINE STATION • NEW LOGISTICS

  4. WHAT WAS DONE

  5. WHAT WAS DONE

  6. WHAT WAS DONE

  7. WHAT WAS DONE • NEW KOSU SHEET

  8. NEXT ACTIONS • BLUE BOXES IMPLEMENTATION • Target date: 29/01/2007 • Pilot: He Jun • TRAINING SESSIONS TO DEFECTS (4 shifts) • Date: - every 2 weeks - 1rst session: 06/02 to 11/02/2007 (4 shifts) • Pilot: Luo Zhipeng • USE IRIS 4 STEPS ON THE LINE • Date: from 25/01/2007 onwards • Pilot: Qiang Zhou

  9. NEXT ACTIONS

  10. NEXT ACTIONS

  11. DEFECTS - RULES • CHECK SHEET • For the DEFINITION of the defects • Every 15 days a training session to defects will be hold

  12. DEFECTS - RULES • WORK INSTRUCTION (2 SHEETS) • 1rst sheet: what must be done • 2nd sheet: standard of inspection including • Standard time for inspection • Eye path

  13. IRIS SYSTEM HAS 4 STEPS • STEP1: INSPECT THE PART 第一步: 检查产品 If defect is questionable: 如果缺陷不易判断 • STEP2: PUT ON IN-CAR POSITION FIXTURE 第二步: 将产品放在车身位置夹具上 If defect is visible: 如果缺陷是明显的 • STEP3: USE CARD TO MEASURE PRECISELY第三步: 使用外观检查卡量度是否符合标准 If defect is still questionable: 如果缺陷仍然不易判断 • STEP4: PUT ON IRIS RED RACK第四步: 将产品放在红车上

  14. IRIS SYSTEM

  15. IRIS SYSTEM

  16. IRIS SYSTEM

  17. IRIS SYSTEM HAS 4 STEPS • STEP1: INSPECT THE PART 第一步: 检查产品 If defect is questionable: 如果缺陷不易判断 • STEP2: PUT ON IN-CAR POSITION FIXTURE 第二步: 将产品放在车身位置夹具上 If defect is visible: 如果缺陷是明显的 • STEP3: USE CARD TO MEASURE PRECISELY第三步: 使用外观检查卡量度是否符合标准 If defect is still questionable: 如果缺陷仍然不易判断 • STEP4: PUT ON IRIS RED RACK第四步: 将产品放在红车上

  18. GOOD BYE Thank you for your attention感谢大家的参与 Good luck TOGETHER WE WILL SUCCEED一起工作我们才能成功

More Related