1 / 17

Pellet Plant

Pellet Plant. Wawasum Corporation. Wawasum. 50/50 Partnership BNA & AZA Planned Location: BNA Reserve 67,000 tpa. Wood Pellet Market (Categories). INDUSTRIAL. RESIDENTIAL. Wood Pellet Market (Product/Spec). INDUSTRIAL. RESIDENTIAL. Wood Pellet Market (Logistics). INDUSTRIAL.

elsie
Download Presentation

Pellet Plant

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pellet Plant Wawasum Corporation

  2. Wawasum • 50/50 Partnership BNA & AZA • Planned Location: BNA Reserve • 67,000 tpa

  3. Wood Pellet Market (Categories) INDUSTRIAL RESIDENTIAL

  4. Wood Pellet Market (Product/Spec) INDUSTRIAL RESIDENTIAL

  5. Wood Pellet Market (Logistics) INDUSTRIAL RESIDENTIAL

  6. Key Market Questions • What product will we produce? (Residential or Industrial) • Where is our target market?(N.America or Overseas) • How will we deliver the product to them?(Rail, Vessel, Truck – cost?)

  7. Ontario Power Generation Atikokan Generating Station Proposed Conversion

  8. Who Buys Wood Pellets? INDUSTRIAL • European Union • United Kingdom RESIDENTIAL • Italy

  9. Great North BioEnergy (GNBE) • WawasumCorp. (BNA/AZA) • Atikokan Renewable Fuels • Whitesand FN

  10. Great North BioEnergy (GNBE) • 3 Production Plants • Same Equipment • Same Process • Same Product • 1 Marketing Front

  11. Why GNBE? – European Demand • Reliability of Supply • Repairs & Maintenance • Larger Volume

  12. Wawasum Wood Allocation

  13. Class 30 Engineering Study and Business Plan Development

  14. Class 30 Engineering & Business Plan • Analyses and design of plant • Equipment identification and layout • Process flow diagram • Budget Construction Opinion of Cost (+ - 30%) • Simplified Project Schedule and GANTT chart

  15. Class 30 Engineering & Business Plan RESULTS: • Cost to produce Industrial? • Cost to produce Premium? • Adjustments to Business Plan required? • Solid numbers to secure financing

  16. WAWASUM – PELLET PLANT NEXT STEPS: • Review results of the Class 30 Engineering • Review business plan & financials • Make any adjustments necessary • Secure off-take agreement • Secure financing for construction • Site preparation & begin construction

  17. Pellet Plant Wawasum Corporation

More Related