1 / 13

Mott Run Time Estimates

This document outlines the critical parameters for a beam experiment involving various target materials, specifically gold (Au), silver (Ag), and copper (Cu). Key metrics include a DAQ rate of less than 5,000 Hz, beam current under 50 µA, and an 85% polarization. Target thickness extrapolation, based on Steigerwald, is accounted for the gold targets at three energy levels: 3.0 MeV, 5.0 MeV, and 8.0 MeV, along with copper and silver. Statistical errors for measurements are consistently maintained below 0.5%. Additionally, dump events are set at 25 Hz/µA per detector.

elinor
Download Presentation

Mott Run Time Estimates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mott Run Time Estimates • DAQ rate < 5,000 Hz • Beam current < 50 µA • Target thickness extrapolation fromSteigerwald is included • Dump events: 25 Hz/µA per detector • Beam polarization: 85% • Statistical error (dp/p): 0.5%

  2. Target Thickness Extrapolation

  3. Au Target

  4. Au Target - 3.0 MeV

  5. Au Target - 5.0 MeV

  6. Au Target - 8.0 MeV

  7. Ag Target - 5.0 MeV

  8. Cu Target - 5.0 MeV

  9. Fall 2013 Gold Plan

  10. Au Target Beam current < 2µA

  11. Au Target - 3.0 MeV

  12. Au Target - 5.0 MeV

  13. Au Target - 8.0 MeV

More Related