reality is teapac complete 2010 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
REALITY IS TEAPAC Complete 2010 PowerPoint Presentation
Download Presentation
REALITY IS TEAPAC Complete 2010

Loading in 2 Seconds...

play fullscreen
1 / 27

REALITY IS TEAPAC Complete 2010 - PowerPoint PPT Presentation


  • 83 Views
  • Uploaded on

REALITY IS TEAPAC Complete 2010. What You Might Think vs Reality. What You Might Think. TEAPAC Complete 2010. HCS 2010. Synchro Studio 8. HCM Compatible Optimize HCM Multi-Intersection Integration MUTCD Warrants Traffic Counts User Efficiencies. What You Might Think.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'REALITY IS TEAPAC Complete 2010' - eleazar


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
reality is teapac complete 2010

REALITYISTEAPAC Complete 2010

What You Might Think

vs

Reality

what you might think
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
what you might think1
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
slide4

RealityHCM Compatible

TEAPACComplete2010

SynchroStudio 8

HCS2010

  • HCM 2010Compliant
  • HCM 2010Coordinated
  • Integrated HCM 2010 Average Phase Durations
  • HCM 2000Compliant

*

* incomplete implementation?

what you might think2
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
slide7

RealityOptimize HCM

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • Optimize Total Int. HCM Delay
  • Optimize Critical Mvmt. HCM Delay
  • Optimize Critical Mvmt. HCM V/C
  • Optimize Need for Left Turn Phasing

*

?

*not a desirable, equitable optimization strategy

what you might think3
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
slide10

RealityMulti-Intersection

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • Show System over map or aerial photo for easy selection and analysis
  • 1-click Multi-Int.Capacity Analysis
  • 1-click Multi-Int.System Optimization
  • 1-click Multi-Int.System Animation

*

**

***

* short arterials only ** with TRANSYT *** with CORSIM

what you might think4
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
reality integration
RealityIntegration

TEAPACComplete2010

SynchroStudio 8

HCS2010

  • TRB HCM Engines
  • HCS 2000/Plus/2010
  • Synchro 5/6/7/8
  • CORSIM
  • TRANSYT-7F
  • PASSER-II
  • TruTraffic
  • VISSIM
  • NOSTOP

?

*

**

**

* 2010 only ** 1 int at a time?

what you might think5
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
reality mutcd warrants
RealityMUTCD Warrants

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • MUTCD 2009 Compliant
  • MUTCD 2000/2003 Compliant
  • MUTCD 1988 Compliant
  • All-way Stop Sign Warrants
what you might think6
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
reality traffic counts
RealityTraffic Counts

TEAPACComplete2010

SynchroStudio 8

HCS2010

  • Full Day of Counts Stored with Each Int.
  • Search/Select Visible Counts for Volumes
  • Import Counts from Many Electronic Dev.

*

*

* limited capabilities

what you might think7
What You Might Think

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
reality user efficiencies
RealityUser Efficiencies

TEAPACComplete2010

HCS2010

SynchroStudio 8

  • Calculate TIA Volumes for Direct Analysis
  • Flexible Scenario M’gmnt without File-SaveAs
  • Flexible, User-Defined Automation (macros)
  • Context-SensitiveHelp
  • Meaningful Documentation
  • Cost for 1 User

$1,900 (no warrants)

$995

$2,000

reality is teapac complete 20101
Reality Is – TEAPAC Complete 2010

TEAPACComplete2010

  • HCM Compatible
  • Optimize HCM
  • Multi-Intersection
  • Integration
  • MUTCD Warrants
  • Traffic Counts
  • User Efficiencies
teapac complete 2010
TEAPAC Complete 2010

Version 8.6

Strong Concepts

15 Timber Lane

Northbrook, IL U.S.A.

(847) 564-0386 Fax 474-4486

www.StrongConcepts.com

info@StrongConcepts.com

First In Integrated Traffic Software

40 Years