Store Summary

Store Summary. Tevatron Coordinator - FNAL. 1/6/2020. 1. Store Summary. Tevatron Coordinator - FNAL. 1/6/2020. 2. Results of B0 Aperture Scan. Single vs Multi batch Injection and DC beam. Store 6467. Store 6469.

elbertf
Download Presentation

Store Summary

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Store Summary Tevatron Coordinator - FNAL 1/6/2020 1

  2. Store Summary Tevatron Coordinator - FNAL 1/6/2020 2

  3. Results of B0 Aperture Scan

  4. Single vs Multi batch Injection and DC beam Store 6467 Store 6469

  5. Pbar closure before and after kicker timing adjustments of 6 nsec on each side

  6. Luminosity vs intensity

  7. Problems • HD13 and VE11 – settings timeout when running smooth program. Changes made to C50 to get around this. • Problems with pbar closure on store 6465 • B4 House breaker tripped • Pbar emittances for the last 4 transfers in store 6465 were large. • E1 wet engine tripped on a false Emergency brake indication • D17-3 collimator did not move to its initial position, rebooted collimator front end • F1 Wet engine tripped off during store 6459. • B48 separator has indicated sparks on several occasions but no affect is seen • Dead 24V supply at CUB causing LCW regeneration issues. Tevatron Coordinator - FNAL 1/6/2020 8

  8. Studies/Work Completed Multi bunch proton injection for store 6469 Aperture scans at B0 Adjusted pbar injection timing Tevatron Coordinator - FNAL 1/6/2020 9

  9. Plans for Next Week • Shut down work • -Roll measurements on all Tev dipoles • - Look at alignment of the CDF downstream beam pipe • - Ground fault search at F4 • -Replace thyratron for AAK3 • Startup • - Establish 150 Gev beam and do quick aperture scan to establish • if we did the right thing • -Get beam to flattop and then low beta , look at tunes and orbits and • correct as needed. • Pre shutdown studies • - Crystal Collimator • - B0 quad tickling • -Bumper magnet abort gap clearing studies