1 / 7

Chapter Leadership Team

Power & Energy Society San Antonio Chapter IEEE Central Texas Section Spring Planning Meeting Sep 8, 2012 San Marcos, TX. Chapter Leadership Team. Chair – Christina Gaydos Grubb Engineering; 210-658-7250; cgaydos@grubbengineering.com Vice Chair – Steve Glenn

edan
Download Presentation

Chapter Leadership Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power & Energy SocietySan Antonio ChapterIEEE Central Texas Section Spring Planning MeetingSep 8, 2012 San Marcos, TX

  2. Chapter Leadership Team • Chair – Christina Gaydos Grubb Engineering; 210-658-7250; cgaydos@grubbengineering.com • Vice Chair – Steve Glenn CNG Engineering; 210-224-8841; Steve.Glenn@cngengineering.com • Secretary/Treasurer – Curtis Cryer CPS Energy; 210-353-2159; cbcryer@cpsenergy.com • Webmasters – Jason Perez/Steven Graf Grubb Engineering; 210-658-7250; jperez@grubbengineering.com; sgraf@grubbengineering.com • Past Chair (2011) – Curtis Cryer

  3. Chapter Updates 2012 Meeting Attendance Topic Members Non MembersTotal Jan Integration of Lighting Controls and the 8 11 =19 Building Management System FebEthics 25 8 = 33 March Litigation in the Construction Industry 7 10 = 17 MayPower Quality Disturbance Examples and Solutions 11 6 = 17 MayElectric Cars 10 6 = 16 July UL 1449 2nd vs. 3rd Edition 146 = 20 Aug Performance of CPS Energy’s Solar Photovoltaic Research Arrays ?? = ? ________ 2012Average = 20 Average attendance at meetings: August 2006 – Dec 2007: 23 January 2008 – July 2008: 25 August 2008 – Dec 2009: 24 January 2010 – Dec 2010: 20 January 2011 – Oct 2011: 16 January 2012 – Aug 2012: 20

  4. 2012 Chapter Meetings

  5. SWOT Analysis • Strengths – Loyal membership • Weaknesses – Limited number of new attendees • Opportunities – Stable location & outreach to more possible attendees • Threats – Attendee disinterest

  6. Chapter Plans / Issues • Officer Elections next month • Lack of weekend tours • Need new speaker base

  7. QUESTIONS???Thanks

More Related