Population Dynamics

DESCRIPTION

Population Dynamics. Population Dynamics. Changes in population size and the factors that regulate populations over time. Population Density. The number of individuals per unit area volume . Example: The number of oak trees per km 2 in a forest. Estimation of Population Size.

1 / 33

Download Presentation

Population Dynamics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PopulationDynamics

  2. Population Dynamics • Changes in population size and the factors that regulate populations over time.

  3. Population Density • The number of individuals per unit area volume. • Example: The number of oak trees per km2 in a forest.

  4. Estimation of Population Size 1. Individual counts(not always practical) 2. Transects 3. Mark-recapture method: Lincoln Index N= marked individual X total catch second time recaptured marked individuals Example: pond turtles1992: 18 1993: 34 (12) 1994: 30 (18)

  5. Estimation of Population Size Example: pond turtles1992: 18 1993: 34 (12) 1994: 30 (18) 1992-93: N = 18(34) = 51 turtles 12 _________________________________________ 1993-94: N = 34(30) = 56.7 turtles 18 _________________________________________ So: 51 + 56.7 = 107.7 = 53.9 turtle estimation 2

  6. Dispersion • The distribution of individuals within geographical population boundaries. • Three examples of dispersion patterns: 1. Clumped 2. Uniform 3. Random

  7. Dispersion Patterns 1. Clumped a. individuals are aggregated in patches b. unequal distribution of resources in the environment. Example: trees around a lake or pond

  8. Dispersion Patterns • 2. Uniform a. individuals are evenly distributed b. interactions among individuals of a population Example: creosote bushes in the desert

  9. Dispersion Patterns • 3. Random a. unevenly distributed b. random dispersion is rare Example: clams in a mud flat

  10. Understanding Population Growth • Exponential Growth Model Exponential growth: The rate of expansion (growth) of a population under ideal conditions.

  11. Number of individuals (N) Time Exponential Growth • Example:bacteria produces a J-shaped curve

  12. Understanding Population Growth 2. Logistic Growth Model logistic growth: environmental factors that restrict the growth of a population (called: population limiting factors)

  13. K: Carrying Capacity • The maximum stable population size that a particular environment can support over a relatively long period of time (K).

  14. Number of individuals (N) Time Logistic Growth • Example: turtles in a pond K produces a S-shaped curve

  15. Draw an s-curve and draw a j-curve • Label each

  16. Question • What if? • N, the number of individuals = almost 0: exponential growth • N, the number of individuals = almost K (carrying capacity): growth rate is approaching zero Zero Population Growth

  17. Factors That Limit Population Growth 1. Density-Dependent Factors: a. Population-limiting factors whose effects depend on population density. b. The greater the pop, the greater the effects. Examples: 1. Limited food supply 2. Plagues 3. Predation 4. War

  18. Factors That Limit Population Growth 2. Density-Independent Factors: a. Population-limiting factors (abiotic) whose occurrence is not affected by pop density. b. the greater the pop, the greater the effects Examples: 1. Earthquakes 2. Fires 3. Hurricanes 4. Freeze in the fall

  19. number of individuals in pop. Time Boom and Bust Species • A rapid increase (boom) in a population followed by a sharp decline (bust). • Examples: a. Daphnia in a pond boom bust

  20. number of individuals in pop. Years Boom and Bust Species • Sometimes species(carnivore) depend on other species (prey) for food. • Example: Snowshoehare and lynx

  21. Evolution Shapes Life Histories • Life History: Series of events from birth through reproduction to death. • Two basic types of life history strategies: 1. Opportunistic life history (r-selected species) 2. Equilibrial life history (K-selected species)

  22. 1. Opportunistic life history(r-selected species) Characteristics: 1. maturing time: short 2. life span: short 3. mortality rate: often high 4. times female is reproductive: usually once 5. age at first reproduction: early 6. size of offspring: small 7. parental care: none 8. Size of organism: small

  23. 2. Equilibrial life history(K-selected species) Characteristics: 1. maturing time: long 2. life span: long 3. mortality rate: often low 4. times female is reproductive: often many 5. age at first reproduction: late 6. size of offspring: large 7. parental care: often extensive 8. Size of organism: tend to be large

  24. Life History Examples r-selected species: 1. Garden weeds 2. Insects 3. Desert flowers K-selected species: 1. Humans 2. Apes 3. Elephants

  25. % of survivors % of maximum life span Survivorship Curves • Type 1 survivorship curve: High survival rates until old age. Example: humans

  26. % of survivors % of maximum life span Survivorship Curves • Type 2 survivorship curve: Intermediate between the extremes. Example: squirrel

  27. % of survivors % of maximum life span Survivorship Curves • Type 3 survivorship curve: High mortality rates as larvae but decreased mortality at later ages. Example: oysters frogs insects

  28. Human Population Growth • Age structure Proportions of individuals of a population in different age groups. A typical population has three main age groups (age structure). 1. Pre-reproductive 2. Reproductive 3. Post-reproductive

  29. Post-reproductive Reproductive Pre-reproductive Age Structure

  30. Human Population Growth Today • Human population as a whole is growing exponentially. • Has doubled (doubling-time) three times in the last three centuries (doubled the carrying capacity several times). • Is now 6.5 billion, might reach ~8 billion by 2020.

  31. Question: • What are the reasons for the increase in human population? • Answer: 1. Improved health 2. Technology 3. Decreased death rates

  32. Question: • What is Zero Population Growth (ZPG)? • Answer: a. birth rate equals death rate. b. intrinsic growth (r) = 0

  33. Question: • What are two ways the human population can reach Zero Population Growth? 1. Limit the # of offspring per couple a. Reduces family size b. Voluntary contraception c. Family planning 2. Delay reproduction (late 20’s instead of early 20’s)