Project Plan, Task Checklist, Estimates Project Prototyping. Objectives Introduction of Project Checklist Estimate Spreadsheet Compile Detailed Project Plan, Estimates, Gantt Chart Introduction to Prototyping Techniques Determination of Best Prototype Strategy
E N D
Project Plan, Task Checklist, EstimatesProject Prototyping • Objectives • Introduction of Project Checklist Estimate Spreadsheet • Compile Detailed Project Plan, Estimates, Gantt Chart • Introduction to Prototyping Techniques • Determination of Best Prototype Strategy • Introduction to Power Supply Design Resources • 4 Major Deliverables • Team & Individual: Overall Project Plan (due for P2) • Team: Prototype Plan • Individual: Schematic and Layout of Example: Thermal Sensor Circuit • Team: Schematic and Layout of Prototype PCB’s (due for P2)
Excel Task Estimation Tool • Project Level Task Estimation Sheet • Manhours Totalize at bottom of Sheet • Material $ Totalize at bottom of Sheet • Data Is Entered into Beige Shaded Blocks Only ! • Start/End Date should be realistic and be dependent on other tasks • Use Week.Day Numbering (ie. Class Week #, Monday=1, Sunday=7) • Example: 4.4 = 4th class week, Thursday • Customize for your own use by • Number of Design Blocks • Cut/Paste the Detailed Design Section for Each Block Owner • Use as Project Plan for Tracking Team Members to Weekly Deliverables
Excel Task Estimation Tool • Project Level Task Estimation • System Design Tasks • Detailed Design Blocks from Next Sheets • Material $ and Manpower Hrs Totalize in the Green
Excel Task Estimation Tool • Project Task Estimation Tool • Verification & Integration Tasks • Presentation, Report and Validation • Manhours Totalize at bottom of Page • Material $ Totalize at bottom of Page
Excel Task Estimation Tool • Block Level Task Estimation Sheet • Manhours Totalize at bottom of Sheet • Material $ Totalize at bottom of Sheet • System Design (Block Definition) Tasks • Detailed Design Tasks • Customize for your own use by • Number of Design Blocks • Cut/Paste the Detailed Design Section for Each Block Owner
Project Plan, Task Checklist, EstimatesProject Prototyping • Deliverables - Team • For Each Team: Completed Excel task template for Project Level Tasks with Block level tasks integrated for project totals • Two Summary Powerpoint Slides incl Gantt chart
Project Plan, Task Checklist, EstimatesProject Prototyping • Deliverables - Individual for each Block • For Each Block: Completed Excel template for Block Level Tasks • For Each Block: Create Block Line Info for Team Level Prototyping Summary Plan
Project Plan Summary Templates • Overall Project Plan Summary Slide Contents: • 1st Slide: Estimation-Reconciliation Summary • Total Manpower Estimated vs Available (from lab 1) • Total Material $ Estimated vs Available (from lab 1) • ~ % of total manpower for system design tasks, detailed design tasks, verification tasks, and documentation tasks • Suggested down/up scope if needed • 2nd Slide: Project Plan Graphical Summary • Create single page high level GANTT chart for entire project • Show chronological interdependencies (example: can’t prototype until parts are procured, can’t procure parts until part list is compiled, etc)
Project Plan, Task Checklist, EstimatesProject Prototyping • Deliverables - Team • Complete 7 prototyping plan step from lecture slides • Summarize your prototyping plan in the single power point table slide (see template)
Basic Electronic Assembly and Test • Deliverables – Individual: Develop the schematic and layout files for the Example Thermal Sensor Circuit to exactly match the layout shown. The PCB design should encompass the following requirements • Dimensions of 1.5” x 2.2” • 2 Layers (double sided) • Through Hole + 1 SMT Part • Placements as Shown for all parts • 25 mil power & ground traces, 10 mil signal traces • 56 mil power & ground input pads with silkscreen Labels • 56 mil output signal pads You may use any eCAD Software Package ExpressPCB is suggested due to simplicity and tutorials
Example: Temp Sensor Circuit • 3 ICs: LM35 SO8, OP07 Dip 8 • 6 Capacitors: Ceramic Monolithic Axial • 3 Resistors: 0.125W Axial 10 Total Nodes
NetInterconnections +5V U1-P8 C3-P1 Vt U1-P1 R1-P1 Vp2 U2-P3 R1-P2 Vb U2-P2 U2-P6 R3-P1 +12V U2-P7 U3-P7 C1-P1 C4-P1 -12V U2-P4 U3-P4 C2-P1 C5-P1 Vn3 U3-P2 R3-P2 C6-P1 Vp3 U3-P3 R2-P2 Vout U3-P6 C6-P2 Gnd U1-P1 C1-P2 C2-P2 C3-P2 C4-P2 C5-P5 R2-P1 Netlist for Thermal Sensor Circuit Trace the Schematic to Cover All Net Connections
ExpressPCB Freeware eCAD Software • Available at www.expresspcb.com Version 5.4.0 or Later • Download & Install Software from above link (first check to see if SW is already on PC) • Read Through Help Section – • Quickstart Tutorial for ExpressSCH • Quickstart Tutorial for ExpressPCB NOTE: To Copy from ExpressPCB and ExpressSCH, use the Print Scrn key from the keyboard, then when in Powerpoint or Word, use cntrl-V to paste the screen view.
Basic Electronic Assembly and Test • Deliverables – Team: Develop the schematic and layout files for printed circuit board implementation of your Prototype boards. Use the 12 steps and guidelines as shown in the lecture slides. • Schematic File (.sch) and PPT Slides • Bill of Materials incl package types • Layout File (.pcb) and PPT Slides of Silkscreen, Top, Bottom and any internal layers NOTE: To Copy from ExpressPCB and ExpressSCH, use the Print Scrn key from the keyboard, then when in Powerpoint or Word, use cntrl-V to paste the screen view.