1 / 36

Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors

Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors. United States Particle Accelerator School – Accelerator Fundamentals Indiana University/Baton Rouge 6 – 17 January 2003 Elvin Harms Beams Division/Fermilab Harms@fnal.gov. Introduction.

dooley
Download Presentation

Real Accelerators: a facility overview the nuts and bolts…and gaskets and resistors

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Real Accelerators: a facility overviewthe nuts and bolts…and gaskets and resistors United States Particle Accelerator School – Accelerator Fundamentals Indiana University/Baton Rouge 6 – 17 January 2003 Elvin Harms Beams Division/Fermilab Harms@fnal.gov

  2. Introduction • ‘Scratch the surface’ overview • What goes into making a real working accelerator • Perspective of ‘big’ machines • Principles applicable to all types of accelerators • Interactive USPAS - Winter 2003

  3. Scale E. O. Lawrence early cyclotron ‘dees’ Berkley, California USA • Table top USPAS - Winter 2003

  4. Scale • Big machine LHC – 27 kilometers (under construction) CERN Geneva, Switzerland USPAS - Winter 2003

  5. What makes up an Accelerator? • Two primary components • Magnet system • Keep the beam focused • Keep the beam on course • Radiofrequency system • Impart energy to the particle beam Acceleration Maintain beam’s energy (synchrotron light) Maintain structure (colliding beams) USPAS - Winter 2003

  6. Magnets • Electromagnets • Conventional • Water or air-cooled • Copper or aluminum coils • Iron shapes and contains the field • Superconducting • Liquid helium cooled • Higher fields > higher energies • Ramp slowly • Coil placement critical to field • Permanent USPAS - Winter 2003

  7. Magnets • Gradient or ‘Combined function’ • Steering and focusing by a single element USPAS - Winter 2003

  8. Magnets • Separated function • Focusing and bending are done by separate magnets • Quadrupole for focusing • Dipole for bending USPAS - Winter 2003

  9. Magnets • Flavors • Dipoles • Quadrupoles • Correctors • ‘trim’ dipoles • (skew) quadrupoles • sextupoles • even higher order • Special purpose • Injection/Extraction • Light sources USPAS - Winter 2003

  10. Magnets • Flavors Sextupole Quadrupole USPAS - Winter 2003

  11. Magnets • Flavors • Undulator/Wiggler USPAS - Winter 2003

  12. Magnets • Superconducting USPAS - Winter 2003

  13. Radiofrequency systems • Low level • Frequency • Amplitude (voltage) • feedback USPAS - Winter 2003

  14. Radiofrequency systems • High level • Amplification • Accelerating cavities USPAS - Winter 2003

  15. Piecing the machine together • A true complex, not just a machine USPAS - Winter 2003

  16. Piecing the machine together • Cascade of accelerators • Different technologies are more efficient in different energy regimes • Ion sources • Injectors • Collectors • Transfer lines • End accelerator USPAS - Winter 2003

  17. Piecing the machine together USPAS - Winter 2003

  18. Piecing the machine together • Power • Accelerators require lots of it! • Stable and reliable source USPAS - Winter 2003

  19. Piecing the machine together • Power • Magnets connected in series • Distribution • Regulation/feedback loops • Current changes through a component leads to changes in beam behavior (never better…) USPAS - Winter 2003

  20. Piecing the machine together • Contain the beam in a pipe • Vacuum • Particles travel a long way while being accelerated/in storage • Scattering by air can lead to reduced beam quality • emittance growth • energy loss USPAS - Winter 2003

  21. Piecing the machine together • Vacuum • Quality: 10-7 mbar and lower for circular machines • Distributed pumping • Ion pumps, TSP’s, cryo pumping • Pick the correct materials and seals • Meticulous cleaning beforehand • UHV: bake the chamber in place USPAS - Winter 2003

  22. Piecing the machine together • Cooling • Virtually every component requires some sort of external cooling, electronics, too • Water is most common medium • Superconducting components require cryogens • Coolant should be in as direct contact with heat load as possible (best thermal transfer) USPAS - Winter 2003

  23. Piecing the machine together • Water Cooling • Conventional magnet coils typically have a coolant hole through middle of conductor • Control the chemistry • Water must be low conductivity (deionized) since water & current flow together • Remove the dissolved oxygen • Minimize particulates – small orifices • Regulate the temperature USPAS - Winter 2003

  24. Piecing the machine together • Cryogenic Cooling • Superconducting coils bathed in liquid helium at 4.6K or less • Lots of refrigeration (significant power use) • Low heat loss • Magnets are super “thermos” bottles USPAS - Winter 2003

  25. Piecing the machine together • Enclosure • Electrical and Radiation hazards when operating • Personnel protection USPAS - Winter 2003

  26. Piecing the machine together • Equipment housing • Want power supplies and other interface equipment as close as possible, but accessible USPAS - Winter 2003

  27. Keeping it all together / Making it work • Alignment • Keep it in line! • Tevatron 150 to 800 GeV in 30 seconds • t0 = 21ms • C ~4 miles • > 1.4 million miles traveled during acceleration alone USPAS - Winter 2003

  28. Keeping it all together / Making it work • Alignment • Where is it? • Position of components with respect to each other • Macro-positioning USPAS - Winter 2003

  29. Keeping it all together / Making it work • Alignment • Move it • Reference system • Fixturing • Component stands • Remote positioning USPAS - Winter 2003

  30. Keeping it all together / Making it work • Diagnostics • Where’s the beam, what does it look like, how many particles? • Beam Position Monitor • Beam Loss Monitor • Profile Monitor/Wire scanner • Schottky detector • Toroid • Resistive Wall Monitor • Damper • … USPAS - Winter 2003

  31. Keeping it all together / Making it work • Diagnostics USPAS - Winter 2003

  32. Keeping it all together / Making it work • Diagnostics USPAS - Winter 2003

  33. Keeping it all together / Making it work • Controls system • Monitor and Control • Timing • Fast response • Beam removal • Coordination • Human interface USPAS - Winter 2003

  34. Where does the beam go? • Experiments / End Users • Internal to machine • Interaction regions • Beam quality/size USPAS - Winter 2003

  35. Where does the beam go? • Experiments / End Users • External • Rate, energy, size, and location to deliver beam • Single-turn • Resonant extraction • Synchrotron light USPAS - Winter 2003

  36. Resources • People are the most important component • Other resources • Books • Schools, Workshops, conferences • Web USPAS - Winter 2003