An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA ISTEP Update

  2. ISTEP 2009 Projects

  3. ISTEP 2009 • South Central Arkansas/Northeast Louisiana constraint – to address North to South flows • Central Arkansas constraint – to address South to North flows • Lake Charles 230 kV Loop (relieve 138 kV Flowgate NELLC_NELLCB) • Baton Rouge/South MS constraint – to address Central to South flows • Jackson Area Today’s presentation focuses on preliminary results for projects 1 and 2

  4. ISTEP Projects 1 & 2 – ISSUES

  5. Project 1 & 2 Issues2008 Monitored Flowgate Curtailments

  6. Project 1 & 2 Issues2008 Monitored Flowgates - Locations 4 1 5 3 2

  7. Projects 1 & 2Method of Preliminary Study • Replicate the flowgate issues that have occurred in 2008 and determine solutions to mitigate them • Issue not apparent in long-term models • Determine system operation during a known TLR event • Model the system as shown during the event using a day-ahead operational model • Should replicate the flowgate overload issues • Determine system changes to eliminate flowgate issues

  8. Project 1 South Central AR / Northeast LA Constraint

  9. Project 1:Southcentral AR / Northeast LA ConstraintBackground • North – South generation bias observed • Affected Flowgates • Sheridan – Eldorado FTLO Etta – McNeil (Flowgate 2) • WhiteBluff-Sheridan FTLO Mabelvale-Sheridan (Flowgate 3) • Mabelvale-Sheridan FTLO White Bluff-Sheridan (Flowgate 4) • Flowgate issues occur during daily off-peak periods of the peak loading season

  10. Project 1:South Central AR / Northeast LA ConstraintModeling and Assumptions • Used July 6, 2008 Operational day-ahead model • TLR curtailment called July 6, 2008 @ 2am • WhiteBluff-Sheridan FTLO Mabelvale-Sheridan (Flowgate 3) • Actual Generation / Load / Transactions used in the model simulation

  11. South Central AR / Northeast LA Constraint Base Flows Base flows for 500kV are North to South

  12. South Central AR / Northeast LA Constraint SHRMAB_KEO (Flowgate 1)

  13. Southcentral AR / Northeast LA Constraint SHRELD_HSPET (Flowgate 2)

  14. South Central AR / Northeast LA Constraint WHBSHE_MABEL (FG3), WBKEO_SHMAB (FG5)

  15. South Central AR / Northeast LA Constraint MABSH_WBSH (Flowgate 4)

  16. Southcentral AR / Northeast LA Constraint Upgrades in the Change Case • Terminal Limiting Equipment Upgrades: • Sheridan-Eldorado 500kV from 1732 to 2546 MVA (FG2) • White Bluff – Sheridan 500 kV from 1732 to 2546 MVA (FG3) • Mabelvale – Sheridan500 kV from 1732 to 2546 MVA (FG4)

  17. South Central AR / Northeast LA Constraint Change Case Base Flows

  18. South Central AR / Northeast LA Constraint Change CaseSHRMAB_KEO (Flowgate 1)

  19. Southcentral AR / Northeast LA ConstraintChange CaseSHRELD_HSPET (Flowgate 2)

  20. South Central AR / Northeast LA Constraint Change CaseWHBSHE_MABEL (FG3), WBKEO_SHMAB (FG5)

  21. South Central AR / Northeast LA ConstraintChange Case MABSH_WBSH (Flowgate 4)

  22. Project 2Central Arkansas Constraint

  23. Project 2. Central AR ConstraintBackground • Generation Outlet Issue • South to North Flows Observed • Affected Flowgates • Sheridan – Mabelvale FTLO White Bluff – Keo (FG1) • Flowgate issue occurs during daily on-peak periods of off-peak load season 4

  24. Project 2. Central AR ConstraintModeling and Assumptions • Used Dec 21, 2008 Operational day-ahead model • TLR curtailment called Dec 21, 2008 @ 6pm • Sheridan – Mabelvale FTLO White Bluff – Keo (Flowgate 1) • Actual Generation / Load / Transactions used in the model simulation

  25. Central AR ConstraintBase Flows Base flows for 500kV are South to North

  26. Central AR ConstraintSHRMAB_WBKEO (Flowgate 1)

  27. Central AR ConstraintSHRELD_HSPET (Flowgate 2)

  28. Central AR ConstraintWHBSHE_MABEL (FG3), WBKEO_SHMAB (FG5)

  29. Central AR ConstraintMABSH_WBSH (Flowgate 4)

  30. Central AR Constraint Upgrades in the Change Case • Terminal Limiting Equipment Upgrades: • Mabelvale – Sheridan 500 kV from 1732 to 2546 MVA (FG1)

  31. Central AR ConstraintChange Case Base Flows

  32. Central AR ConstraintChange CaseSHRMAB_WBKEO (Flowgate 1)

  33. Central Ar ConstraintChange CaseSHRELD_HSPET(Flowgate 2)

  34. Central AR ConstraintChange CaseWHBSHE_MABEL (FG3), WBKEO_SHMAB (FG5)

  35. Central Ar ConstraintChange CaseMABSH_WBSH (Flowgate 4)

  36. Results Summary

  37. Results Summary: ISTEP solution 38

  38. Preliminary Cost EstimateLimiting Element Listing Project 1: Southcentral AR / Northeast LA Constraint * costs for upgrades to substation bus, and/or breaker relaying, and/or line relaying are not included in the above estimates. If required, additional costs will apply. 39

  39. Preliminary Cost EstimateLimiting Element Listing Project 2: Central Arkansas Constraint * costs for upgrades to substation bus, and/or breaker relaying, and/or line relaying are not included in the above estimates. If required, additional costs will apply. 40

  40. Next Steps

  41. Next Steps • Further Analysis for Projects 1 and 2 • Begin Work on Projects 3, 4, and 5 • Status Report at October LTTIWG Meeting

  42. Questions? Douglas Bowman, PE, PMP Lead Engineer, ICT Planning 501-688-1640 dbowman@spp.org