110 likes | 142 Views
This project encompasses the prototype fabrication and testing of an aircraft, including an economic plan and detailed flight test schedule. The team's mission requirements, overall schedule, economic plan, and flight test objectives are outlined. Component testing costs and materials estimation are provided, along with the flight testing location options and objectives.
E N D
Prototype Fabrication Economic & Test Plan QDR AAE 451: Team 2 Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor Tyler Wilhelm
Overview • Aircraft 3-View • Overall Schedule • Economic Plan • Flight Test Plan
Aircraft 3-View Mission Requirements • 15 min. endurance • Take-off distance ≤ 60 ft. • Vstall ≤ 15 ft/s • Vloiter ≤ 25 ft/s • 35 ft. turn radius
Economic Plan • Total Person-Hours(as of Week 9 - 3/21/05): 1700 hours • Estimated Total Person-Hoursat Project Completion: 3500 hours
Component Testing Motor and Controller $134.00 Rate Gyro $124.99 Receiver $ 69.00 Servos $ 65.96 Battery $ 29.90 Propellers $ 22.00 ----------------------------------------- Total $445.85 Prototype Fabrication and Testing EPP Foam $ 60.00 Balsa $ 20.00 Ultrakote $ 18.00 Landing Gear $ 15.00 Epoxy $ 10.00 ----------------------------------------- Total $123.00 Economic Plan Cost Estimation
Flight Test Plan • Schedule / Location of Flight Testing • April 14 – 19 • Possible Locations (depending on availability) • Outside • Airport Intramural Fields • West Lafayette High School • McAllister Park • Inside • Mollenkopf Athletic Center • Lambert Fieldhouse • Armory
Flight Test Plan • Objectives • Unpowered Glide • Stability • Lifting Capabilities • Straight Line / Turning Flight • Include Take Off and Landing • Endurance • Flying Qualities
Summary • Aircraft 3-View • Overall Schedule • Economic Plan • Flight Test Plan • Questions?