“You cannot Manage what you cannot Measure” (Accurately) - Jack Welch, CEO, General Electric - PowerPoint PPT Presentation


  • 168 Views
  • Uploaded on

PRESENTATION ON ESSENTIAL REQUIREMENTS FOR ENERGY AUDITS IN THERMAL POWER STATIONS BY H.S.Bedi Sr. Vice President (Power) Energo Engineering Projects Ltd. A-57/4, Okhla Industrial Area, Phase – II, New Delhi - 110020. “You cannot Manage what you cannot Measure” (Accurately)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '“You cannot Manage what you cannot Measure” (Accurately) - Jack Welch, CEO, General Electric' - derron


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Slide1 l.jpg

PRESENTATION ON ESSENTIAL REQUIREMENTS FOR ENERGY AUDITSIN THERMAL POWER STATIONSBY H.S.BediSr. Vice President (Power)Energo Engineering Projects Ltd.A-57/4, Okhla Industrial Area,Phase – II, New Delhi - 110020


Slide2 l.jpg

“You cannot Manage what you cannot Measure”

(Accurately)

- Jack Welch, CEO, General Electric


Pattern of energy consumption in thermal power station l.jpg

PATTERN OF ENERGY CONSUMPTION INTHERMAL POWER STATION




Slide6 l.jpg

  • REQUIREMENT – 1

  • 1.1 ACCURACY OF COLLECTED DATA

  • Collected data has to be most accurate & doubtless.

  • Use calibrated and accurate instruments better conforming to ASME-PTC standards

  • 1.0% Error in data means unreliability and 25000 tons of coal loss/annum for 200 MW Unit or approx Rs. 5 crores / year based on assumption that

    • TG cycle heat rate is taken as 2000 kcal / kwh

    • Coal CV is taken as 4000 kcal / kg

    • Price of coal taken as Rs. 2000 / ton

  • Loss increases with machine size


Slide7 l.jpg

  • 1.2 EFFECT OF INSTRUMENTATION ON ACCURACY

  • Plant on-line instruments with few audit instruments Accuracy around 3.0%.

  • Accurate calibrated instruments as per ASME-PTC-6 for steam turbine& ASME-PTC-4-1 for Boilers.

  • Accuracy around 0.5 %

  • 1.3 EFFECT OF PROCEDURE ON ACCURACY OTHER THAN

  • ASME-PTC-6 for steam turbines and ASME – PTC-4.1 for boiler

    • Error in Boiler Energy Audit – around 2.0%

    • Error in steam turbine Energy Audit – around 3.0%


Slide8 l.jpg

1.4 TOTAL ERROR BECAUSE OF INSTRUMENTATION & PROCEDURE

INACCURACY 6.0%

NOTE:

DIFFERENCE IN COST OF ENERGY AUDIT BETWEEN AUDIT BY ACCURATE INSTRUMENTS AS PER ASME AND NORMAL INSTRUMENTS IS 12 TO 14 LACS AS AGAINST 6 TO 8 LACS.


Slide9 l.jpg

EFFECT OF INSTRUMENT INACCURACY ON

HP/IP Turbine Efficiency



Slide11 l.jpg

  • REQUIRED ACCURACY AND CALIBRATION OF THE INSTRUMENTS

  • The proposed instruments should have following level of accuracy.

  • Thermocouples and PRTs – ASME special class ‘A’ i.e ½ DIN tolerance

  • Pressure and differential pressure - 0.1%

  • transmitters better than

  • Power Meter for generator & - 0.1%

  • Unit Aux Power measurement

  • iv Data Logger - 0.03%

  • v Power transducers / Load Analyser - 0.5%

  • vi Flue gas analyser - 0.5%

  • vii Ultrasonic flow meters - 0.5%

  • viii Anemometer - 1.0%

  • ix Infrared Thermometer - 1.0%

  • x Lux meter - 1.0%

  • xi RH meter - 1.0%

  • These should be duly calibrated from NABL accredited lab.

  • The above accuracies for S.No. I to V are as per ASME specified for Performance Evaluation of Thermal Power Plants.


Slide12 l.jpg

FG

Expansion

Bellow

Economizer

HVS

APH

Sampling

Locations

APH

FG

REQUIREMENT – II

PROPER SCHEMES FOR ENERGY AUDIT


Slide13 l.jpg

Annexure - I

BOILER EFFICIENCY AND APH TEST SCHEME & INSTRUMENTATION DIAGRAM

Grid measurement for gas compositionand gas temp. at air pre heater inlet / outlet.

DEPTH




Slide17 l.jpg

REQUIREMENT - III

FREQUENCY OF READINGS FOR ACCURATE DATA COLLECTION

TURBINE CYCLE AUDIT

Pressure - 5 Minutes

Temperature - 5 Minutes

Flow - 1 Minute

Power - 1 Minute

Levels - 10 Minutes

BOILER UNIT AUDIT

Temperature - 15 to 30 Minutes

Flue Gas Composition - ½ to one hour

DURATION OF AUDIT TEST

Turbine Cycle - 2 Hrs

Boiler Unit - 4 Hrs


Scope of work spec for energy audit of a typical thermal power plant units l.jpg
SCOPE OF WORK (SPEC) FOR ENERGY AUDIT OF A TYPICAL THERMAL POWER PLANT UNITS

REQUIREMENT – 4

  • A. BOILER

    • Boiler efficiency by heat loss method as per ASME PTC-4-1 guidelines and give break up of losses

    • Furnace air ingress at different levels upto I.D.Fans

    • Air heater performance

      • Gas side efficiency

      • Air side and gas side pressure drop across APH

      • Air leakage across APH

      • X – ratio i.e heat capacity of air to gas capacity.

    • Aux power consumption and combined efficiency of fan and motors of ID, FD & PA fans.

    • Aux power consumption of coal mills, feeders vs loading.


Slide19 l.jpg

B. TURBINE POWER PLANT UNITS

  • Turbine cycle heat rate as per ASME-PTC-6 methodology and instrumentation

  • HP and IP cylinders efficiency

  • Turbine pressure survey

  • TTD & DCA of HP / LP heaters Pressure drop across heaters

  • Condenser performance i.e

    • Condenser back pressure after duly considering the effect of present C.W inlet temp, C.W flow, heat load on condenser and air ingress to condenser vis-à-vis design conditions

    • C.W side pressure drop in condenser

  • Cycle losses

  • Performance of turbine glands

  • Ejector performance


Slide20 l.jpg


Slide21 l.jpg

  • D. Pump performance for BFPs, CEPs, Aux C.W.P & C.W.P and pumps consuming power more than 50 KW etc.

  • Check Performance of the pumps by comparing the corrected measured flow at operating speed to design speed with that of the expected flow derived from the characteristic curves against the corrected total dynamic head at design speed.

  • Determine Pump efficiency as the ratio of power input to the pump shaft to hydraulic power.


Slide22 l.jpg

  • E pumps consuming power more than 50 KW etc. Insulation Audit:

    • Walk through survey of Boiler, Turbine and associated steam piping to identify the damaged and Hot spot area.

    • Surface temperature measurement at the damaged and Hot spot area by infrared temperature indicator.

    • Estimation of heat loss in the hot spots and damaged insulation area.

  • F Balance Of Plant

  • (i) Compressed air system:

  • Free Air Delivery i.e. Capacity evaluation of the Plant and Instrument air compressors.

    • Checking volumetric efficiency of compressors.

    • Assessment of compressed air leakage quantity.


Slide23 l.jpg

  • (ii) pumps consuming power more than 50 KW etc. Air conditioning system:

  • Performance evaluation of AC Plant w.r.t net cooling / refrigeration capacity along with heat load of Air handling unit and energy requirements.

  • (iii) Ash Plant

  • Performance of ash Slurry pumps through power measurement and flow measurement.

  • Ash water ratio assessment and recommendations for optimization in water and power consumption.

  • (iv) Cooling Tower Performance

    It shall include establishment of

  • Liquid/Gas ratio

  • Cooling tower effectiveness, approach and range


Slide24 l.jpg

  • (V) pumps consuming power more than 50 KW etc. Coal Handling Plant

  • Input Power measurement of all the key equipment of the CHP area like: Paddle feeders, Conveyors, Stacker & Re-claimer, Wagon Tipplers, Crushers,

  • NOTE:

  • ENERGY CONSERVATION MEASURES TO BE SUGGESTED IN ALL THE ABOVE AREAS OF AUDIT.

  • ENERGY AUDIT PROCEDURE TO BE SUBMITTED ALONG WITH AUDIT MEASUREMENT SCHEMES AND APPROVED


1 0 usefulness of energy audit in thermal power station l.jpg

1.0 USEFULNESS OF ENERGY AUDIT IN pumps consuming power more than 50 KW etc. THERMAL POWER STATION

  • Identifies wastage areas of fuel, power and water utilization.

  • Reduction in cost of generation by implementing findings of EA.

  • Increases power generation by efficient utilization of steam in turbine cycle and reduction in Aux Power Consumption.

  • Maintenance planning and availability improvement.

  • Provides guidance in loading sequences of the units.

  • Identification and rectification of errors in on-line instruments.

  • Leads to reduction in green house gases.

  • Utilizes specialized services of experienced engineers.

  • Training of O&M staff for efficient control of unit operation.

  • Improves competitiveness by reducing unit generation.

  • Creates bench mark for all equipments and systems.

  • Fulfills bureau of energy efficiency mandatory requirement of Energy Audit.


Slide26 l.jpg

METHODS / OBSERVATIONS FOR SAVINGS ENERGY IN POWER PLANT pumps consuming power more than 50 KW etc.

  • Operation of machine at very low turbine I/L parameters.

  • Operation of turbine at lower loads.

  • HP and IP turbine cylinder efficiencies are very low.

  • Main steam and HRH inlet temperature to turbine very low.

  • RH pressure drop high.

  • High quantity of SH Spray and its tapings before HPH-5 resulting in loss of heat because of changed cycle.


Slide27 l.jpg

METHODS / OBSERVATIONS FOR SAVINGS ENERGY IN POWER PLANT pumps consuming power more than 50 KW etc.

  • HP heater no. 5 out of service.

  • Turbine cycle not operating as per design scheme i.e. Ejector and Deaerator pegging steam from PRDS header as against normal source from deaerator & extraction steam respectively.

  • Passing of turbine cycle drain valves.

  • Make up quantity to cycle is very high which indicates excessive system steam (heat) loss.

  • TTD & DCA of heaters high.


Slide28 l.jpg

METHODS / OBSERVATIONS FOR SAVINGS ENERGY IN POWER PLANT pumps consuming power more than 50 KW etc.

  • Condenser air ingress and dirty tubes.

  • Under loading of motors

  • Excessive air leakage in compressed air system

  • Faulty insulation

  • Drain valves passing

  • Air ingress to Boiler furnace

  • FAD of compressors low


Slide29 l.jpg

Thanks… pumps consuming power more than 50 KW etc.

Energo Engineering Projects Ltd.

A-57/4, Okhla Industrial Area, Phase – II

Phone: +91 - 11 - 26385323/ 28/ 29/ 38

Fax: +91 – 11 – 26385333

E-mail: [email protected]