1 / 10

Agenda

‎PSE&G Energy $aver Program for Non Profit, Municipal and Small Business Willdan Energy Solutions, Inc New Jersey Capabilities and Experience May 16, 2019. Agenda. Introductions Willdan Overview Services and Capabilities NJCEP Program Discussion Healthcare Experience Discussion.

darrellb
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ‎PSE&G Energy $aver Programfor Non Profit, Municipal and Small BusinessWilldan Energy Solutions, IncNew Jersey Capabilities and ExperienceMay 16, 2019

  2. Agenda • Introductions • Willdan Overview • Services and Capabilities • NJCEP Program Discussion • Healthcare Experience • Discussion

  3. About Willdan • Willdan Group Inc. (NASDAQ: WLDN) is a 53-year-old, national, financially-strong, publicly-traded energy efficiency and professional engineering firm • 273M revenue profitable for 2017 • Serves state and local government, utilities, universities and private commercial customers • Completed 150,000 projects • 37 Utilities – 55 commercial Energy efficiency Program • Services: Engineering and Construction Management Advanced Energy Services/Microgrids Energy Program Implementation and Management, 100+ programs for over 50 utilities Supported engineering and energy projects to over 500 hotels with over 93,000 rooms

  4. Willdan Regional Operations • 250 staff members across 8 offices • Staff includes Professional Engineers, Cx Agents, project managers, auditors, installers, executives and support staff • PSEG IGA Engineer, PSEG and State DI contractor • Helped customer participate on NJCEP Programs • Cx for Cooper 4.6MW CHP Project • Energy Service • Comprehensive Surveys, Master Plan and Facility Audits • Facility Condition Assessments • DER, Storage, CHP, Microgrids • Energy Use Benchmarking • Energy Consulting and Analysis • Master Planning • District Energy • Project Engineering and Design • Lighting • Emergency Power Plants / Demand Response • Project Implementation and Construction Management • Commissioning and RCx • Electrical Contracting

  5. NJ Clean Energy Programs

  6. PSE&G EE Programs

  7. PSEG Energy $aver Program Eligibility Criteria:Existing municipal, non- profit, and small to mid-sized commercial and industrial facilities with a peak electric demand that did not exceed 200 kW in any of the preceding 12 months in Urban Enterprises Zones are eligible to participate in the Direct Install Program. PSEG verifies eligibility for the customers.Systems and Equipment covered under program: Lighting and Lighting Controls Refrigeration and Controls HVAC (Package, Split, Heat Pump) Boilers and Water Heaters (Gas, Propane and Oil) HVAC Controls, Water and Insulation Cooking and Food Services Appliances Program Pays for 100% of measure cost and customer is responsible for 30%, which they typically repay on bill at 0% interest in 36 months payment. Generally customers bill go down even after adding 30% payment, hence cash flow positive.

  8. Benefit of PSE&G Energy $aver Program BENEFITS • No Upfront Project cost : PSE&G pays 100% of project cost and customer repay on bill 0% finance 30% of their contribution in 36 months • Turnkey Process - A network of selected participating contractors addresses your project from start to finish, beginning with an assessment of your facility, and ending with the installation of eligible energy-efficient equipment. • Minimal Cost – Customer’s share of the project’s cost will be approximately 30%, the program pays the remaining 70%. Most importantly, no money down, as PSEG pays 100% project cost from beginning. With incentives so dramatic, Generally net cash flow positive from day 1. • Fast Turnaround Time - Project installations are typically completed within 90 days from the time of scheduling your energy assessment. • Ongoing Savings - Your new energy-efficient equipment will provide savings for years to come through dramatically reduced energy costs on your monthly utility bills. • Upgrade Existing Equipment - All the new selected equipment is required to meet ASHRAE 90.1 2013, which is a state Energy Code.

  9. PSEG Energy $aver Process – (60-90 Days)Typical Project

  10. Thank You Tejas Desai PE CEM Vice President Cell (646) 357-6340 Email – tdesai@willdan.com Jeffrey Burger Business Development Manager Cell (973) 906 0906 Email –Jburger@willdan.com

More Related