Promoting Language Learning and Intercultural Communication through Moodle Initiative

DESCRIPTION

The Erasmus Mundus Action 4 Moodle project promotes language learning and intercultural integration for international students across six partner institutions in Russia, France, Germany, and Slovakia. Running from December 2008 to May 2011, the project created four online language courses in Russian, French, German, and Slovak, along with intercultural documents to aid understanding. The initiative features multimedia content, interactive templates, and materials designed to assist students in adapting to new cultural environments, enhancing their study experiences abroad.

1 / 16


Download Presentation

Promoting Language Learning and Intercultural Communication through Moodle Initiative

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMA – 4 – MOODLEan international project promoting language learning and intercultural communicationKonstantin LomakinInternational DepartmentSibSUTIS Novosibirsk

  2. Agenda • Project description • Creating courses • Technical requirements • Post-project plans

  3. Erasmus Mundus Action 4 Moodle • Six partners: The Bonch-Bruevich St. Petersburg State University of Telecommunications (Russia), institutions from Brest and Lile (France), Leipzig (Germany), Novosibirsk (Russia) and Zilina (Slovakia). • Duration: December, 2008 – May, 2011 • Aim: to facilitate international students integration into their new study environment • Results: 4 on-line language courses ( Russian, French, German and Slovak) and intercultural documents • Target groups: students, language teachers, other personnel

  4. Meeting demands • Students international mobility • Distance learning • Equal opportunities • Intercultural understanding

  5. Creating courses • Films showing particular situations in each country and institution (10 parts) • Course template offering a clear and easy to follow structure (10 lessons) 1. Welcome 6. Food and drink 2. Arrival 7. Services 3. At the hostel 8. Medical care 4. At the University 9. Leisure time 5. Shopping 10. Holidays • Intercultural documents suggesting ways of overcoming cultural differences

  6. Films • created in each partner country. • show the situations which foreign students have to go through in order to succeed their integration into a new educational system. • serve as the basis of the language learning activities. • are provided with subtitles. • 10 parts lasting for 10 min.

  7. Template • is based on previous experience with Moodle in language courses • helps to create a multi-media interactive language course on line • will be made available to the general public at the end of our project • can be changed if other users want to do so • template

  8. Intercultural documents • an on-line attempt to get students to think about cultural differences • intercultural dilemmas • no right or wrong answers only different points of view • possibilities of quick adaptation

  9. Iceberg analogy of cultural items

  10. Intercultural documents

  11. The top of the iceberg • Visible items : they mostly belong to the touristical guides • They can be built from generalisation: « generalization means « categorizing many members of a group as having similar characteristics » • Generalization and representations are useful but they can be reducing > cliche

  12. Intercultural documents • Intercultural communication= • -a relationship between individu or groups coming from different cultures. • Important: Individus act their cultures and do not represent the whole of any culture

  13. Intercultural documents

  14. Technical requirements • PC, Macintosh, Smartphones • Modem 56 kbit/s, DSL 16.000 kBit/s • IE, Firefox, Opera, Safari, Chrome • Mediaplayer, Quicktimeplayer, Real-Player, Flash, VLC etc

  15. Post-project plans • The language courses will be available to foreign students, teachers and staff. • Some partner institutions will have tutors for their courses (Russia, France). • The Moodle language lesson template will be available to create other language courses.

  16. This project has been funded with the support of European Commission. EMA-4-Moodle-Server: http://recherche.telecom-bretagne.eu/ema4moodle/ Thank you for your attention!