Status and Plans DCS workshop 16.9 2002 L.Jirdén PowerPoint Presentation
Download Presentation
Status and Plans DCS workshop 16.9 2002 L.Jirdén

Loading in 2 Seconds...

play fullscreen
1 / 26

Status and Plans DCS workshop 16.9 2002 L.Jirdén - PowerPoint PPT Presentation


  • 130 Views
  • Uploaded on

Status and Plans DCS workshop 16.9 2002 L.Jirdén. Budget Status Planning Goals for end 2002. DCS budgeting. Total DCS budgets in MOU very approximate Old and incomplete figures Not clear what they cover Update requested in each URD No answers yet… Simple excel form to complete

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Status and Plans DCS workshop 16.9 2002 L.Jirdén' - daria-riley


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
status and plans dcs workshop 16 9 2002 l jird n
Status and PlansDCS workshop 16.9 2002 L.Jirdén
  • Budget
  • Status
  • Planning
  • Goals for end 2002
dcs budgeting
DCS budgeting
  • Total DCS budgets in MOU very approximate
    • Old and incomplete figures
    • Not clear what they cover
  • Update requested in each URD
  • No answers yet…
  • Simple excel form to complete
  • Two distinct partitions:
    • Detector DCS costs
    • Central DCS costs
  • Spending profile also needed
slide3

Budgeting guidelines

ECS

DCS

Detectors & services

DET

GAS

INF

DSS

MAG

ITS

TPC

TRD

TOF

HMP

PHO

ZDC

FD

PMD

MU

EMC

COS

~ 19 sub-detectors

SPD

SDD

SSD

RO

FC

CAL

CPV

FMD

T0

V0

TRI

TRA

~100 sub-systems

2-300 device

units

2-300 physicaldevices

> 105 channels

> 106 parameters

slide4

Budgeting guidelines

Central DCS

ECS

DCS

Detector DCS

Detectors & services

DET

GAS

INF

DSS

MAG

ITS

TPC

TRD

TOF

HMP

PHO

ZDC

FD

PMD

MU

EMC

COS

~ 19 sub-detectors

SPD

SDD

SSD

RO

FC

CAL

CPV

FMD

T0

V0

TRI

TRA

~100 sub-systems

2-300 device

units

2-300 physicaldevices

> 105 channels

> 106 parameters

slide5

Budgeting guidelines

Configuration DB,

Archives,

Storage

Log files, etc.

WAN

LAN

LAN

Controller/

(LHC, Safety, ...)

Other systems

PLC

VME

Field Bus

Node

Node

Experimental equipment

budgeting guidelines

Configuration DB,

Archives,

Storage

Log files, etc.

WAN

LAN

LAN

Controller/

(LHC, Safety, ...)

Other systems

PLC

VME

Field Bus

Node

Node

Experimental equipment

Budgeting guidelines

Central DCS

Detector DCS

slide9

DETECTOR URD status Sept 02

ITS

TPC

TRD

TOF

HMP

PHO

ZDC

FD

PMD

MU

EMC

COS

Detectors

SPD

SDD

SSD

RO

FC

CAL

CPV

FMD

T0

V0

TRI

TRA

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

LV

LV

ROD

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

COO

subsystems

COO

COO

COO

COO

COO

COO

COO

COO

COO

COO

COO

COO

COO

COO

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

TS

TS

LIQ

ALI

LSR

ECS

draft URD exists

Discussion started

Not started

DCS

DAQ

TRG

OFF

LHC

DET

GAS

INF

DSS

MAG

slide10

NETW

LAN

FB

INFRASTR. URD status Sept 02

ECS

draft URD exists

Discussion started

Not started

DCS

DAQ

TRG

OFF

LHC

DET

GAS

INF

DSS

MAG

ENV.

PARAM

ELECTR

COOL

ALIGN

ACCES

Subsystems

PRIM

RACK

CRTE

PRIM

PLNT

GAS

SXL2

SXL1

ACR

CR1

CR2

CR3

CR4

UX

slide11

PHO

MU

CAL

CPV

TRI

TRA

MIX

MIX

MIX

MIX

MIX

MIX

MIX

MIX

PUR

PUR

PUR

PUR

PUR

PUR

PUR

PUR

PMP

PMP

PMP

PMP

PMP

PMP

PMP

PMP

DIS

DIS

DIS

DIS

DIS

DIS

DIS

DIS

ANA

ANA

ANA

ANA

ANA

ANA

ANA

ANA

GAS URD status Sept 02

ECS

draft URD exists

Discussion started

Not started

DCS

DAQ

TRG

OFF

LHC

DET

GAS

INF

DSS

MAG

TPC

TRD

TOF

HMP

PMD

Detectors

RO

FC

Modules

slide12

ITS

TPC

TRD

TOF

HMP

PHO

ZDC

FD

PMD

MU

EMC

COS

Detectors

SPD

SDD

SSD

RO

FC

CAL

CPV

FMD

T0

V0

TRI

TRA

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

HV

LV

LV

ROD

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

LV

COO

COO

COO

COO

COO

COO

COO

COO

COO

COO

COO

subsystems

COO

COO

COO

COO

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

TS

TS

LIQ

ALI

LSR

DETECTOR Proto status Sept 02

ECS

exists

started

Not started

DCS

DAQ

TRG

OFF

LHC

DET

GAS

INF

DSS

MAG

slide13

NETW

LAN

FB

INFRASTR. Proto status Sept 02

ECS

exists

started

Not started

DCS

DAQ

TRG

OFF

LHC

DET

GAS

INF

DSS

MAG

ENV.

PARAM

ELECTR

COOL

ALIGN

ACCES

Subsystems

PRIM

RACK

CRTE

PRIM

PLNT

GAS

SXL2

SXL1

ACR

CR1

CR2

CR3

CR4

UX

slide14

PHO

MU

CAL

CPV

TRI

TRA

MIX

MIX

MIX

MIX

MIX

MIX

MIX

MIX

PUR

PUR

PUR

PUR

PUR

PUR

PUR

PUR

PMP

PMP

PMP

PMP

PMP

PMP

PMP

PMP

DIS

DIS

DIS

DIS

DIS

DIS

DIS

DIS

ANA

ANA

ANA

ANA

ANA

ANA

ANA

ANA

GAS Proto status Sept 02

ECS

exists

started

Not started

DCS

DAQ

TRG

OFF

LHC

DET

GAS

INF

DSS

MAG

TPC

TRD

TOF

HMP

PMD

Detectors

RO

FC

Modules

slide15

PHO

FD

MU

CAL

CPV

FMD

T0

V0

TRI

TRA

DETECTOR SUB-SYSTEMS

ECS

DCS

DAQ

TRG

OFF

LHC

DET

GAS

INF

DSS

MAG

ITS

TPC

TRD

TOF

HMP

ZDC

PMD

EMC

COS

Detectors

SPD

SDD

SSD

RO

FC

HV1

HV1

HV1

HV2

HV3

HV2

HV1

HV1

HV1

HV1

HV1

HV1

HV1

HV1

HV1

HV1

HV1

HV4

HV?

LV4

LV3

LV1

LV2

LV2

LV?

LV2

LV?

LV?

LV?

LV2

LV2

LV2

LV?

LV2

LV2

LV?

LV?

subsystems

COO

B

COO

1

COO

B

COO

2

COO

2

COO

B

COO

B

COO

B

COOB

COO

3

COO

?

COO

B

COO

B

COO

B

COO

?

FEE

FEE

FEE

FEE

FEE

FEE

FEE

FEE

?

FEE

?

FEE

?

FEE

?

FEE

?

FEE

?

FEE

?

FEE

FEE

FEE

?

FEE

?

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

TS

TS

LIQ

ALI

LSR

ROD

dcs planning
DCS Planning
  • Global DCS planning exists
dcs planning1

2002

03

04

05

06

07

DET

PRE-INST

FINALINST

COM-MISS

BEAMOP

DCS

URD

ENG. SOLUTIONS

PROTOTYPE SUBSYSTEM

PROTOTYPE SUB-DET CONTR.

TEST WITH DETECTOR EQUIPMENT

INSTALL DCS INFRASTRUCTURE

INSTALL DETECTOR DCS

DCS Planning
dcs planning2
DCS Planning
  • Global DCS planning exists
  • Individual detector DCS planning missing
  • Input asked in each URD
  • Not many answers yet…
  • To start:
    • Simple Milestones list in excel form to complete
  • Then:
    • Microsoft project planning file
milestones
Milestones
  • User Requirements Document (URD)
  • Lab setup
    • Individual sub-system
    • Connection to PVSS, some panels, limited logging and configuration facilities
  • Intermediate detector tests & test beams
    • A few sub-systems involved
    • Subsystem as finite state machine
  • Pre-installation tests
    • All sub-systems involved
    • Extended logging, configuration and alarm facilities
    • Detector as finite state machine
    • ECS and liaisons with DAQ, TRG
  • Final installation
  • Commissioning
tpc milestones ex
TPC Milestones ex.

HV LV CO LA …

  • URD Jan 02 Jan 02 Mar 02 Jun 02 …
  • Lab setup Apr 02 May 02 Jun 02 ? …
  • detector tests Mar 03 Mar 03 Mar 03 ?
  • Pre-inst. Tests Apr 04 Apr 04 Apr 04 ?
  • Final installation Jun 05 Jun 05 Jun 05 ?
  • Commissioning Sep 06 Sep 06 Sep 06 Sep 06
goals for end 2002
Goals for end 2002
  • URD’s
    • A 1st version from all remaining detectors
    • Existing URD’s updated to cover
      • All sub-systems
      • Operational requirements: state/transition diagrams
        • for sub-systems
        • For ECS: exp. Modes and actions for DCS, DAQ, TRG
      • Interlocks
      • Planning: milestones table
      • Budget: Central DCS and Detector DCS estimate
goals for end 20021
Goals for end 2002
  • Prototyping
    • Common solutions (ACC team)
      • CAEN 1527 available in PVSS FW + lab setup
      • ISEG HV available in PVSS FW + lab setup
      • Wiener PL500 available in PVSS FW + lab setup
      • 1st proto Temp monitoring system + lab setup
    • Detectors
      • Start using PVSS FW and one common solution
      • Make a Lab Setup
conclusion
Conclusion
  • URD’s are advancing well – 2nd version now needed
  • Prototyping is just starting
  • DCS to be ready for each detector in less than 3 years (mid 05)
  • A realistic planning of these 3 years is essential
  • Detector tests to be used as milestones for the DCS planning
  • Intermediate steps to be detailed for each sub-system