An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Structural DesignProgram Review Massachusetts Department of Transportation September 20-23, 2011

  2. Purpose of Review • Provide a service to MassDOT management • Identify best practices • Recognize areas of excellence • Document policies & practices • Identify opportunities for improvement

  3. Outline • Review Team • Review Process • General Observations • Commendable Practices • Opportunities for Improvement • Discussion

  4. Review Team • Olu Adeyemi – FHWA, Division Office, Cambridge • Tom Saad – FHWA, Resource Center, Matteson • Jamal Elkaissi – FHWA, Resource Center, Denver • Derrell Manceaux – FHWA, Resource Center, Denver • Mike Arpino – FHWA, Division Office, Cambridge • Guatam Sen - MassDOT, Boston • Edmund Newton - MassDOT, Boston • Craig Shike – Oregon DOT

  5. Schedule • Tuesday • Kick off Meeting • Deputy Chief Engineer • Director of Project Development • Design and Project Managers • ABP, In-House and Consultant Managers • Hydraulics Engineer • Wednesday • State Bridge Engineer • ABP, In-House and Consultant Designers • Roadway Design, Environmental and Planning Engineers • Materials Division

  6. Schedule • Thursday • Geotechnical Engineers • Construction • Materials Control • District Office Engineers • Consultants • Friday • Close Out

  7. General Observations • Professional and Motivated Staff • Good Communications, but Specific Suggestions for Improvement • Dynamic Work Environment / Chain of Command • Numerous Major Advancements in last Five Years

  8. Opportunities for Improvement

  9. Success due to leadership’s commitment to implement new practices and innovative delivery methods • ABP • ABC • FAST 14 • DBE / DUCE (District Bridge Engineer-District Utility Constructability Engineer) • Design Build Implementation

  10. Development, standardization and implementation of “State of the Practice” procedures • Design manuals • Standard structural details • NEXT beam • LRFD procedures

  11. Flexibility of staff to adapt to multiple reorganizations • ABP • Design Build • Special Project team • New District Positions • In-House Design

  12. Expanded partnership with districts, consultants, and traveling public • ABP • Design Build • Manuals Development • Expedited Project Delivery • Environmental: Context Sensitive Design & Bridge Aesthetics

  13. Improvement in specific practices and procedures • Process of public involvement for project development is good • Decision matrix for implementing ABC technologies • Standard details • Bridge design manual developed and updated in-house 1/2

  14. Improvement in specific practices and procedures (cont’d) • Forefront on crash tested bridge rails and transitions • All utility relocations must appear on plans • Record of Design Report – evaluating Consultants • Use of VIRTIS Ratings as check of design 2/2

  15. Opportunities for Improvement

  16. Training & professional development/need for better communication • Need for Structural Engineer career path • Training for Structural and Consultant engineers • Recognition / reward system • Develop effective team environment • Implement rotational assignments • Succession Planning • No incentive for PE license

  17. Establish In-House bridge design • Track design hours / cost • Consultant review section does not have project authority • Technician to maintain standard details and CADD support • In-house highway design capacity needs to be developed • More focus on bridge design effort

  18. Clearly document roles & responsibilities • In some cases, engineers do not understand full scope of responsibilities • Districts challenging roles and responsibilities • Consultants receive conflicting comments in plan reviews • Authority unclear

  19. QC/QA • Inconsistent QC practices • QA procedures not clearly defined / standardized • Some reviews are redundant • Can use bridge load rating as valid QC method

  20. Tools required • Update software • Substructure structural software • Civil-3d locks computer • Adobe • WORD • Scanner • Update computer hardware

  21. Additional recommendations • Need for Hydraulics Program Review • Applied research • Use of electronic transfer of drawings and plans/shop drawings • Update Standard Specifications • Maintenance Manual • Capital improvement plan for preventive maintenance

  22. Response to ADA request regarding staffing levels following reorganization • Limits on hydraulic and geotechnical capabilities • Increased work load for in-house staff - identify where scoping will be conducted

  23. Schedule for development of final report • Submit draft report to Review Team for comments (Nov 2011) • Comments incorporated (Jan 2012) • Final report (Feb 2012)

  24. Additional topics…..questions?? Thanks MassDOT