The President prioritizes fundraising at the University. Advancement staff doubled with IT for campaigns, but clashes occur over mainframe use. ERP system operational but not fully utilized. Internal risks, costs, and IT attitude issues persist. Plan to address and improve relationships and project prioritization swiftly.
E N D
Team 2: Advancement / Raising Money • Mark Hoeting • Arkansas State University • Dan Terrio • Lewis and Clark College • Doug Ruschman • Xavier University • Thomas Podles • Loyola College in Maryland
Scenario • Fund raising is President Beverage’s top priority for the University • The Advancement staff was doubled to prepare for the fund raising including 8 developers and an IT Mgr for Advancement • Advancement thinks the mainframe is inadequate to support the campaign • IT disagrees and relations have deteriorated between the groups
Assumptions • A current ERP system is operational • The Advancement Department does not understand what all options included in the current ERP • The project is approved but changes can (and should) be made • Ineffective senior leadership from IT
The Assessment • We feel the project is laden with internal security and business continuity risks • A build mentality on compressed timeline • Total costs and long-term implications have not been considered. • Could produce detrimental relationships with donors
The Plan • Apologize for IT’s role in the deterioration of the relationship between the two organizations • Demonstrate concerns about the current plan • Perform a needs and costs analysis in short order • This project is the organizations number one project so IT needs to proceed as such