An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fermilab Test Beam Facility Aria Soha All Experimenter’s Meeting January 27, 2014

  2. Latest Experiments • Dec 18 • T-1041 CMS Forward Calorimetry • T-979 secondary user • T-994 finish up (Until Dec 20) • Dec 26 • T-1041 (contnd), • Jan 2 • DAMIC took data for SiPMs • Beam studies – • plateaued Scintillator & Cherenkov PMTs; • started Ckov pressure scans • Jan 8 – 21 • Si Strip Telescope commissioning http://www-ppd.fnal.gov/FTBF/schedule http://www-ppd.fnal.gov/FTBF/

  3. Current Status • T-1042 (g-2) taking data • MCenter Control Room construction • MC6 Magnets replaced • MC2 Quad replacement • Other LAriaT work http://www-ppd.fnal.gov/FTBF/

  4. Up Coming Experiments • Feb 5 – 26 super PHENIX • T-1044 – 5 ton Hadron calorimeter • T-1048 – Time-of-flight system • T-1037 – (FLYSUB) GEM detectors • T-1054 pre-shower calorimeter http://www-ppd.fnal.gov/FTBF/schedule http://www-ppd.fnal.gov/FTBF/

  5. TSW’s In Progress Technical Scope of Work • T-1018, approved • T-1042, approved (taking data) • T-1044, approved • T-1048, collecting signatures • T-1049, waiting on experimenter feedback • T-1054, extreme processing • One more, waiting for T-number http://www-ppd.fnal.gov/FTBF/TSW http://www-ppd.fnal.gov/FTBF/

  6. Additional Slides http://www-ppd.fnal.gov/FTBF/

  7. Facility Usage

  8. Facility Weekly Usage http://www-ppd.fnal.gov/FTBF/

  9. Experiments & TSWs http://www-ppd.fnal.gov/FTBF/

  10. Beam Delivery http://www-ppd.fnal.gov/FTBF/