Fermilab Test Beam Facility. Aria Soha All Experimenter’s Meeting October 20, 2014. 2014 Facility Upgrades. MCenter Beamline! Area for High Rate Trackers (M03) New Instrumentation Wire chamber tracking system Si strip telescope Improved Infrastructure Temperature control

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Fermilab Test Beam Facility' - cleo-phelps


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
fermilab test beam facility

Fermilab Test Beam Facility

Aria Soha

All Experimenter’s Meeting

October 20, 2014

2014 facility upgrades
2014 Facility Upgrades
  • MCenter Beamline!
  • Area for High Rate Trackers (M03)
  • New Instrumentation
    • Wire chamber tracking system
    • Si strip telescope
  • Improved Infrastructure
    • Temperature control
    • Table control / new tables

http://www-ppd.fnal.gov/FTBF/

2014 statistics
2014 Statistics
  • 18 Experiments
  • 321 Collaborators
  • 84 Institutions
  • 20 Countries
  • 9 New TSW’s

http://www-ppd.fnal.gov/FTBF/

beam delivery
Beam Delivery
  • 416,139 Total FxdTrgt events
  • 183,225 MTest beam pulses
  • 16,496 MCntr beam pulses
  • MTest Beam Sum: 7.9E15
  • MCntr Beam Sum: 2.4E16

http://www-ppd.fnal.gov/FTBF/

weekly usage
Weekly Usage

MTest

  • 48 available beam-weeks
  • 78 experiment-weeks
  • 6 weeks of beam studies/ commissioning
  • 177% Usage

MCenter

  • 5 available beam-weeks
  • 0.5 experiment-weeks
  • 5 weeks of beam studies/ commissioning
  • 100% Usage

http://www-ppd.fnal.gov/FTBF/

experiments 18
Experiments (18)
  • 9 new TSW’s approved
  • 11 new experiments started
  • 7 returning experiments

http://www-ppd.fnal.gov/FTBF/

experiment types
Experiment Types
  • T1015 DRO Calorimetry
  • T1037 FLYSUB-Consortium
  • T958 FP420 (CMS+ATLAS) Fast Timing Group
  • T979 Fast Timing w/Cherenkov Counters
  • T989 DAMIC
  • T1058 Secondary Emission Calorimeter
  • T1031 Atlas Tile Calorimeter Electronics
  • T1036 CMS High Rate Pixel Detector
  • T1041CMS Forward Calorimetry
  • T1049 ATLAS large scale TGC
  • T1056 ATLAS DBM Module Qualification
  • T992 Radiation-hard Sensors for the SLHC
  • T1042 Muon g-2 straw tracker
  • T1018 Spacordion Tungsten Fiber Calorimeter
  • T1044 sPHENIX
  • T1048 PHENIX fast TOF
  • T1054 sPHENIX Pre-Shower Calorimeter
  • T994 JASMIN

Two Large Neutrino experiments on schedule for FY15: MINERvA & LAriaT

http://www-ppd.fnal.gov/FTBF/

institutions 84
Institutions (84)

http://www-ppd.fnal.gov/FTBF/

summary
Summary
  • Facility is growing at an incredible rate, and is on track to continue
  • 321 collaborators this year
  • Will likely break 500 next year, with new beamline
  • 1.4 FTE for facility management is not enough

http://www-ppd.fnal.gov/FTBF/

additional slides
Additional Slides

http://www-ppd.fnal.gov/FTBF/

latest experiments
Latest Experiments

T-1056

5 Users

T-1041

55 Users

SY Water Problem

http://www-ppd.fnal.gov/FTBF/

so far in fy 2014
So Far in FY 2014
  • 70 Experiment Weeks
  • 1 Installation week
  • 6 weeks Facility beam studies

http://www-ppd.fnal.gov/FTBF/

current status
Current Status

MTest

  • T-1041 running now. (6 sub-experiments)
  • Wednesday they will uninstall
  • Thursday will be spent installing T-992, T-1058, T-1015, and T-958 (until Sept Shutdown)

MCenter

  • LAriaT Commissioning
  • Characterization of Tertiary Beam
  • T- 979 will run parasitically with punch-through muons

http://www-ppd.fnal.gov/FTBF/