By Ada m Dawson. WRF modelling . My project. Model the ash cloud from the Eyjafjallajökull volcano over the period from 15-17 May 2010. The objective is to see whether the Ash cloud reaches Norway. WPS-namlist.wps. In the namelist.wps file the amount of domains were changed to two.

chuong
Download Presentation

WRF modelling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. By Adam Dawson WRF modelling

  2. My project • Model the ash cloud from the Eyjafjallajökull volcano over the period from 15-17 May 2010. • The objective is to see whether the Ash cloud reaches Norway.

  3. WPS-namlist.wps In the namelist.wps file the amount of domains were changed to two. The start and end dates had to be changed and the first end date has to be the end of the start date. In this file the size of the domains are set. With the outer domain being decided by dx and dy (have to be the same) The size of the inner domain is decided by the I and J parent start Ref long and Ref lat have to be changed to point out the centre of my domain

  4. Running WPS Then I run geogrid.exe Then run NCView to check both domains are the size I want them. Like check there is no orography at the edges as this can stall the program. Then I run metgrid.exe to input the meteological data to the program

  5. Namelist.input Namelist.input is in the directory WRFV3/test/em_real Here the time of the run is set and again the start and end date . Only first two have to be specified as I only have two domains . Then all the data has to match namelist.wps Physics can also be changed here. If the correct files are in WRF_GRIB then WRF can be run.

  6. RIP4 • To get an output from the data you need to run RIP4. • Before RIP4 is run rip_fields can be edited to change the output. Like changing colours and the meteorological information that is on each output.

  7. Outputs-15th May

  8. Output-16th May

  9. Output 17th May

  10. Second domain