1 / 11

CIGRE JWG 36.07 / CIRED Power Quality Indices and Objectives

CIGRE JWG 36.07 / CIRED Power Quality Indices and Objectives. Progress report on joint Cigré 36.07 / Cired Germain Beaulieu, conv . February 2003. JWG36.07: Power Quality indices & objectives. CONTENT: Scope Main activities

chun
Download Presentation

CIGRE JWG 36.07 / CIRED Power Quality Indices and Objectives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CIGRE JWG 36.07 / CIREDPower Quality Indices and Objectives Progress report on joint Cigré 36.07 / Cired Germain Beaulieu, conv. February 2003

  2. JWG36.07: Power Quality indices & objectives CONTENT: • Scope • Main activities • Status of the work within the working group for: -harmonics, -flicker, -unbalance, -voltage dips and-interruptions. • Future activities

  3. JWG36.07: Power Quality indices & objectives Scope: • JWG formed 2 years ago (July 2000), duration 2-3 years. • Starting point is the evaluation of IEC 61000-3-6 and 7 concerning harmonics and flicker : suitability of the proposed objectives and extend the same approach to unbalance. • Additionally JWG also consider indices for voltage dips (objectives for these were not seen as part of the scope). • Indices for interruptions are also being addressed by the WG. • The voltage levels under consideration by the working group are MV, HV and EHV. • An important part of the JWG activities is to collect measurement data on actual levels of disturbances.

  4. JWG36.07: Power Quality indices & objectives Deliverables: • Recommended internal quality objectives, enabling to determine emission limits for disturbing installations • Recommended external quality objectives, to be presented to regulators and system users • Message for manufacturers of quality monitoring instruments: we need instruments which fulfill the IEC 61000-4-30 requirements, and which can give us the quality indices related to the internal and external objectives.

  5. JWG36.07: Power Quality indices & objectives Membership : 19 regular and 10 corresponding (*) members G. Borloo (BE) secr., G. Beaulieu (CA) conv.

  6. JWG36.07: Power Quality indices & objectives MAIN ACTIVITIES: Four main activities corresponding to the structure of the working document: • Part 1: Review existing indices and objectives. • Part 2: Collect measurement data. • Part 3: Recommend quality indices. • Part 4: Recommend quality objectives. For each part, harmonics, flicker, unbalance, dips and interruptions are addressed.

  7. JWG36.07: Power Quality indices & objectives Work Progress : Part 1: Review of existing standards and guidelines completed for harmonics, flicker, unbalance and dips. Part 2: Important efforts for collecting PQ measurement data. Difficulties in gathering data measured in a common or consistent manner. System wide surveys are rare, and confidentiality concerns. Work will be completed based on what was collected so far. Part 3: Discussions/contributions started on recommended indices and methods for assessing and reporting site/system indices. Part 4: Discussions starting on recommended objectives.

  8. JWG36.07: Power Quality indices & objectives ACTIVITIES IN 2003 : Jan. 2003: Prepare 5th draft working document. Finalize paper for Cired 2003. Feb. 2003: 6th meeting in Milano (IT) to discuss 5th draft : finalize part 1 and 2 and supplement part 3 and 4. Mar. 2003: Prepare 6th draft + prepare paper for Cigre/IEEE Symposium in Montreal in Oct. 2003. June 2003: 7th meeting in Essen (DE) to discuss 6th draft : finalize part 3 and 4. Oct. 2003: 8th and last meeting of JWG36.07 in Montreal (CA) Finalize the JWG report.

  9. JWG36.07: Power Quality indices & objectives • Harmonic distortion site indices: 95% or 99% of 3-s or 10-s value system index: 95% or 99% of site index • Objectives planning level: 2% for 5th harmonic (HV) • Data collection 2 MV, 7 HV and 2 EHV surveys (669 sites) • Conclusions planning level is exceeded too often for HV lack of data for MV and EHV

  10. JWG36.07: Power Quality indices & objectives • Flicker pst (10 min) and plt (2 hours) site index: 95% plt or 99% pst system index: 95% plt of 99% pst • Objectives planning levels: pst 0.8-0.9; lst: 0.6-0.7 • Conclusions flicker significantly exceeds planning levels system wide surveys are very uncommon transfer to LV need to be considered

  11. JWG36.07: Power Quality indices & objectives • Voltage Dips Site indices: number of dips per year System indices: 95% of site indices • Data collection 6 EHV, 5 HV, 4 MV surveys (748 mon-years) • Conclusions consistent monitoring methods are needed large variation among sites and systems not possible to give objectives

More Related