King Fahd University of Petroleum and Minerals CEM 512 Value Engineering Term Project Turbine Fuel Gas Heater Prepared by: Ahmed S. Al Zahrani ID# 200295 To: Dr. Sady Assaf August 8, 2005. OUTLINE. INTRODUCTION JOB PLAN Information Phase Creative Phase Judicial Phase

chloe
Download Presentation

OUTLINE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. King Fahd University of Petroleum and MineralsCEM 512Value EngineeringTerm ProjectTurbine Fuel Gas HeaterPrepared by: Ahmed S. Al ZahraniID# 200295To: Dr. Sady AssafAugust 8, 2005

  2. OUTLINE • INTRODUCTION • JOB PLAN • Information Phase • Creative Phase • Judicial Phase • Development Phase • Presentation &Implementation Phase • Summary

  3. INTRODUCTION • In gas compression plant, the compressors are driven by a combustion gas turbine. • For best turbine performance, the fuel gas temperature should be at certain temperature (120 – 140 deg F). • Electric Coil heater that provide sufficient heat to fuel gas. • The objective is to find better heating medium using Value Engineering Technique.

  4. INFORMATION PHASE • The information sources: • Equipment Manual • Plant Operating Manual • Material Control Group • Planners • Colleagues

  5. Performance Criteria • Objectives & Desired Criteria: • To give sufficient heat to fuel gas to be in the acceptable range. • To control and maintain that desired condition. • Desired Features & Criteria: • Minimum construction cost. • Easy Control and Operation. • Safe Operation. • Easy Maintenance.

  6. Cost Information

  7. Function Identification • WHAT DOES IT NOW DO? • WHAT MUST IT DO?

  8. Function Identification FUNCTION WHY? HOW? To Increase Temperature To Meet The Required Condition Have Heating Medium

  9. CREATIVE PHASE Beside the Electric Heater: • Steam Jacket. • Exchange Heat Between Hot Lube Oil and FG. • Exchange Heat Between Process Gas and FG. • Eliminate the Heater.

  10. JUDICIAL PHASE HOW IMPORTANT 3. Major Preference 2. Medium Preference 1. Minor Preference

  11. JUDICIAL PHASE

  12. JUDICIAL PHASE

  13. DEVELOPMENT PHASE

  14. Presentation & Implementation • Will be presented to the operation Manager. • Decision will be taken by the Manager. • Implementation will be done by Maintenance Division.

  15. THANK YOU