10 likes | 110 Views
Ensure production baseline compliance and certify interoperability through JITC testing. Analyze test results, update configurations, and report findings to regulatory bodies for supportability.
E N D
Production and Deployment Phase JITC Interoperability Certification Testing Independent IOT&E OTRR Full-Up System Level LFT&E J-6 Interoperability & Supportability Validation • Test Results • Exit Criteria • APB • CPD • SEP •TEMP • Product Support Element Requirements • Production Baseline • Test Reports ▪ LCSP • TEMP • PESHE• SEP • Input to: • - Cost/Manpower Est. • - Product Support Package PCA Verify & Validate Production Configuration Analyze Deficiencies To Determine Corrective Actions Modify Configuration (Hardware/Software/Specs) To Correct Deficiencies BLRIP Report to Congress LFTE Report to Congress Milestone C FRP DR Independent IOT&E OUTPUTS INPUTS