1 / 28

Fraser Duncan Queen s University Synergies in Low Background Techniques 26 July 2005

booth
Download Presentation

Fraser Duncan Queen s University Synergies in Low Background Techniques 26 July 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    2. SNOLAB

    3. SNOLAB

    4. SNOLAB

    5. SNOLAB

    6. SNOLAB

    7. SNOLAB – Ladder Labs

    8. SNOLAB – Rectangular Hall

    9. SNOLAB – SNO Cavern

    10. SNOLAB – Cryopit (Phase II)

    11. Experiment Spaces

    12. Entire Lab will be a class 2000 clean room. Ventilation system designed for 10 air changes per hour through HEPA filters. Positive pressure from Cleanest spaces to dirtiest. Laboratory Ventilation

    14. Setting up a small Ge Counter Lead + “aged copper” shield Lifting arm for Pb Plug Cu cover to be flushed with N2 for Radon removal. 1 litre sample sizes Low Background Counting

    15. Low Background Counting

    22. Surface Facilities

    23. Surface Facilities

    24. 1 large experiment in the Rectangular Hall (15 m scale) 1 large experiment in the SNO Cavern (22 m scale) ~2 medium scale experiments in the ladder labs. (4-6 m scale) Several smaller prototyping activities (1-2 m scale) Phase I Experimental Program

    25. Experiment Letters of Interest

    26. Finalize outfiting engineering design by September. Phase I excavation completed June 2006. Start outfitting Feb 2006. Ready for experiments beginning of 2007. Schedule

    27. SNOLAB Phase I will provide 27,000 sq ft of class 2000 clean room at 6000 mwe. Excavation 25% complete Surface Facility Ready in September First Experiments 2007 Summary

More Related