slide1
Download
Skip this Video
Download Presentation
U.S. ARMY COPS OF ENGINEERS Howard Hanson Dam Update

Loading in 2 Seconds...

play fullscreen
1 / 5

U.S. ARMY COPS OF ENGINEERS Howard Hanson Dam Update - PowerPoint PPT Presentation


  • 263 Views
  • Uploaded on

U.S. ARMY COPS OF ENGINEERS Howard Hanson Dam Update. Green River Watershed. Normal Project Operations. NOV. MAR. JUN. NOV. 1206 ft. Potential flood pools of short duration. Spring ramp-up for augmentation. Summer and fall flow augmentation. 1167 ft. 1075 ft.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'U.S. ARMY COPS OF ENGINEERS Howard Hanson Dam Update' - bernad


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1
U.S. ARMY COPS OF ENGINEERS

Howard Hanson Dam Update

normal project operations
Normal Project Operations

NOV

MAR

JUN

NOV

1206 ft

Potential flood pools of short duration

Spring ramp-up for augmentation

Summer and fall flow augmentation

1167 ft

1075 ft

Pool elevation in feet above sea level

slide4
Landslide Debris

Green River

Underground Drainage

Tunnel

Grout Curtain

Spillway

Right Abutment

Dam Embankment

Eagle Gorge Reservoir