An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FNAL Production SiteLab8-Panels Machining Lab8 Status and Panel Production Readiness.&Development of QC/QA Procedure: measurements/tooling.for FNAL Production Site Teampresented by Yu.Pischalnikov ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999 1

  2. LAB8 Goal: 2700 panels (cut in size, drill hole and mill strips art-work) LAB8 Facilities: Axxiom &Gerber Machines Lab8 Status and Panel Production Readiness. ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  3. Lab8 Status and Panel Production Readiness. • 1.Panel Handling equipment: 04/29 • bridges, vacuum lifting equipment, transport carts, racks, etc. • 2. Personnel (3 full-time tech.) in place. 05/15 • 3. “New Gerber table” alignment bar 05/04-05/07 • 4. Programs for Axxiom & Gerber 04/30 • 5. Procurement of Panel Template Assembly 05/10 • Alignment mark position tooling in place • Travelers in place • Procurement of bits and saws Axx.&Gerb in place • We will start cut and mill 15 P2’’ panels • next week (05/07). ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  4. LAB8 QC/QA of Gerber operation:CMM measurements of strips position ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  5. LAB8 QC/QA of Gerber operation:CMM measurements of strips position ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  6. LAB8 QC/QA of Gerber operation:CMM measurements of strips position ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  7. LAB8 QC/QA of Gerber operation:CMM measurements of strips position ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  8. LAB8 QC/QA procedure: tooling Alignment marks and holes(strip position) measuring tooling ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  9. LAB8 QC/QA procedure: tooling for strips position • Mark Position Measuring Device Assembly(MD-368990) • Accuracy of measurements distances between alignment marks (from 3 panels sets) better than ±1,5mills • MPM Device will be use at LAB8 to measure each panel: • scale of strip art-work (Y direction) • position of strip art-work vs. central alignment pin-hole (Y&X directions) • (in X direction better than ± 3mills) • position of strip art-work vs. alignment sensors holes ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  10. LAB8 QC/QA for Axxiom operation:CMM measurements of holes position ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  11. LAB8 QC/QA for Axxiom operation:CMM measurements of holes position ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  12. LAB8 QC/QA for Axxiom operation:CMM measurements of holes position ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  13. LAB8 QC/QA for Axxiom operation:CMM measurements of holes position • ME234/2 PANEL TEMPLATE ASSEMBLY ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  14. SUMMARY Lab8 Status and Panel Production Readiness LAB8 facilities ready to start P2 Panels production 05/07/99 P2 Pen’s drawing at Axxiom and Gerber 05/03 15 Panels for P2’’ start to cut at Axxiom 05/07 we consider those 15 panels as a test of readiness our LAB8 production flow: travelers; numbering system, QA/QC system in place FNAL Production SiteLab8-Panels Machining ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999

  15. SUMMARY(cont.) Development of QC/QA Procedure: measurements/tooling. Appropriate Panels production QC/QA procedures and tooling in place Accuracy and repeatability of Axxiom and Gerber operation measured for 6 P3 panels withCMM Gerber’s strips art-works operation accuracy - 2,5mm/strip error = 200mm (8mills) for 80 strips repeatability better than 1mills Axxiom holes drilling operation accuracy ~10mills repeatability better than 2-3 mills FNAL Production SiteLab8-Panels Machining ________________________________________________________________________ Yu.Pischalnikov.EMU CMS ,UCLA meeting: April 29-30, 1999