1 / 10

Welcome & Charge for the Meeting

Welcome & Charge for the Meeting. SANS STAP Meeting ESS, 4 th of December 2018. Ken Andersen, Neutron Instruments Division, European Spallation Source ERIC. Welcome!. We are now nominally on a regular schedule 2 STAP meetings per year, synchronised with SAC meetings

barbarawong
Download Presentation

Welcome & Charge for the Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome & Charge for the Meeting SANS STAP Meeting ESS, 4th of December 2018 Ken Andersen, Neutron Instruments Division, European Spallation Source ERIC

  2. Welcome! • We are now nominally on a regular schedule • 2 STAP meetings per year, synchronised with SAC meetings • Reporting to SAC meeting • Spring: short video meeting • Autumn: longer physical meeting

  3. Purpose and Remit of Instrument STAPs • Scientific and Technical Advisory Panels • one per instrument class • STAP: instrument advisory body • science case and functional requirements • all aspects which impact on scientific output of instrument (not just instrument project) • technical and project decisions • early science • Advice to both NSS management and instrument teams • collaborative & non-adversarial setting • NSS management & instrument teams take advice constructively • allows NSS management & instrument teams to make good, informed decisions • Each STAP meeting results in written recommendations • followed up in subsequent meeting(s) • presented at following SAC meeting

  4. Structure and format of STAPs • Last SANS STAP meeting was in April • Possible merger of SANS and Reflectometry STAPs discussed • Consistency with structure of other STAPs • Consistency with future instrument groups

  5. STAP Membership November 2018

  6. STAP Membership November 2018 Large-Scale Structures Diffraction Eng. & Imaging Spectroscopy

  7. Structure and format of STAPs • Last SANS STAP meeting was in April • Possible merger of SANS and Reflectometry STAPs discussed • Consistency with structure of other STAPs • Consistency with future instrument groups • Decision made to keep to current structure • STAPs are working well: “if it ain’t broke don’t fix it” • Consider a break-up of the Spectroscopy STAP • SANS and Reflectometry are technically quite different • Separate NMX STAP should continue • Maintain STAP expertise on building and commissioning • Maintain STAP expertise on scientific programme • Decision made in July • Hence SANS & Reflectometry STAPs did not meet in September • Need to be brought into phase with SAC meetings

  8. Charge for the STAP Meeting • Instrument teams: • Prepare instrument progress reports in advance of the meeting and present them at the meeting • Prepare plans for technical scientific hot commissioning in coordination with DMSC and SAD and present them at the meeting • Identify hot topics and raise them at the meeting • ESS management: • Organise the meeting • Provide feedback on the actions identified at the last STAP meeting • Prepare a draft capability gap analysis for presentation and feedback at the meetiung

  9. Charge for the STAP Meeting • For the STAP: • To what extent is instrument progress consistent with the schedule? • To what extent are the instruments on track for delivering early science? • To what extent are the plans for technical and scientific hot commissioning suited for delivering early science? • To what extent are the instrument project plans aligned with the plans of DMSC and SAD? • Comment on and suggest improvements to the capability gap analysis

  10. Thank you! ESS site 2016 5th June 2015

More Related