OPC connectivity in the feedback of a municipal-wide heating closed control system

OPC connectivity in the feedback of a municipal-wide heating closed control system. Mariusz Postół Przemyslaw Malek www.cas.eu. CONTROL PROCESS. Łódź citizens # : 1M H eating plants: 3 Total thermal output: 2560MW H eat distribution network: ~800km ~500miles

bailey
Download Presentation

OPC connectivity in the feedback of a municipal-wide heating closed control system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPC connectivity in the feedback of a municipal-wide heating closed control system Mariusz Postół Przemyslaw Malek www.cas.eu

  2. CONTROL PROCESS • Łódź citizens #: 1M • Heating plants: 3 • Total thermal output: 2560MW • Heat distribution network:~800km ~500miles • Number of nodes: ~7 000 • Production in cogeneration: • Hot water • Electric power • Steam

  3. PRODUCTION OBJECTIVES f=f( ) f=y( )

  4. CONTROL OBJECTIVE H1 H2 H3 Heat stream = f(weather) HEAT STREAM

  5. SUPPLY AREA MANAGEMENT

  6. FIRST STAGE K-1266 K-209 K-231 K-199 K-736 K-22 K-751 K-762 K-175 K-1014/1 K-164 K-1023 K-104/30 K-110 K-104/A K-101 SMULSKO HDCR OFFICE K-637 K-617 K-510

  7. COMMON AREAS K-1266 K-209 K-231 K-199 K-736 K-22 K-751 K-762 K-175 K-1014/1 K-164 K-1023 K-104/30 K-110 K-104/A K-101 SMULSKO K-637 K-617 K-510

  8. Łódź Punkt krytyczny Punkt krytyczny Punkt krytyczny Punkt krytyczny Punkt krytyczny Pz = ? R(x) = ? Pz = ? R(p) = ? Pz = ? Radogoszcz Teofilów Communication Śródmieście Smulsko Janów Dąbrowa Chojny

  9. AUTOMATIC LOAD CONTROL LOAD LOAD SEPARATION P P P P G K - 101 K - 164 P P F 3 F 4 REFILL REFILL SUW SUW AREA 1 AREA 2

  10. AUTOMATIC LOAD CONTROL PLC PLC HDCS REFILL REFILL OPC HDCS SUW SUW LOAD LOAD P K - 101 K - 164 OPC Connectivity

  11. Communication paths

  12. Communication paths Division Heating Chamber Regulation Heating Chamber Power Plant #1 Power Plant #2 Redundancy Control ?

  13. COMMUNICATION SERVER interface interface interface interface interface interface interface interface PIPE PIPE PIPE PIPE PIPE PIPE PIPE PIPE SEGMENT SEGMENT SEGMENT SEGMENT PROTOCOL PROTOCOL PROTOCOL PROTOCOL PROTOCOL SEGMENT MEDIUM MEDIUM MEDIUM MEDIUM MEDIUM CommServer CHANNELS SCADA Stations OPC Connectivity

  14. interface interface interface interface interface interface interface interface Division Heating Chamber Regulation Heating Chamber PIPE PIPE PIPE PIPE PIPE PIPE PIPE PIPE SEGMENT SEGMENT SEGMENT SEGMENT SBUS SBUS/UDP SBUS/UDP GPRS RADIO Ethernet CommServer CHANNELS SCADA Stations OPC Connectivity Example – Lodz common heating network Power Plant #1 Power Plant #2

  15. Commserver - Redundancy Active Wait for failure Active SERVICE Standard solution – better case Primary Station LAN Backup Station

  16. Commserver - Redundancy Active Active Standby CommServer Standby Standby Active SERVICE Fail Commserver solution

  17. DEVICE COMMUNICATION MESS WS WS ES OPC SERVER PROCESS APPLICATION

  18. DEVICE COMMUNICATION MANAGEMENT F( ) ? WS WS ES SCANNER CACHE OPC - Interface SERVER

  19. PROCESS REQUIREMENTS DIRECTION K101 DIRECTION K617

  20. DIAGRAM OF DIRECTION STATES ACCEPTED LATENCY HOURS ACCEPTED LATENCY HOURS MONTHS MINUTES MONTHS CLOSING DONE CLOSE CLOSED OPENED ACCEPTED LATENCY SECONDS OPEN OPENING DONE

  21. ADAPTIVE APPROACH CLOSING OPENING CLOSED OPENED STATE DRIVEN SCANNING POLICY SCANNING ON DEMAND SLOW SLOW FAST SLOW:POLICY FAST:POLICY SLOW:POLICY

  22. Commserver – SCANNING ON DEMAND CommServer Normal state – slow scanning

  23. Commserver – SCANNING ON DEMAND CommServer Alarm state – fast scanning

  24. Commserver – multi-channel Typical solution Object #1 Object #2 Object #3 Object #n 1000 objects ? GPRS round trip> 2 sec. => Cycle time > 0.5h

  25. Commserver - Multichannel CommServer Multichannel solution Object #1 Object #2 Object #3 Object #4 1000 objects ? Object #5 Object #6 Object #7 Object #8 250 channels Object #n 8 sec. Object #n+1 Object #n+2 Object #n+3

  26. OPC TRANSPORTER OPCT SQL OPCS OPCS XML OPC CONNECTIVITY SQL CONNECTIVITY XML CONNECTIVITY TAGS TAGS QUEUES TAGS - a - b - c - d - Q1 - Q2 - Q3 - Q4 - aa - bb - cc - dd - P1 - P2 - P3 - P4 HORIZONTAL VERTICAL a = aa + 10 bb Average(a, b, c, d) P1 = aa+a+... PUSH(Q1, d+c)

  27. Thank you for your time

  28. SYSTEMS INTEGRATION - GIS SPM SOC Kxxx Kxxx Kxxx Kxxx WIZ OPCS OPCS OPCS SOC GIS SOC SOC TCH SOC KOM KOM TCH View View KDs SBs SBk UNTOUCHABLE SCk SCs GIS ORACLE VLAN NAT SYM UNTOUCHABLE SERWER Corporate field network Corporate network EC EC EC

  29. PASSIVE OPC SERVER OPC INTERFACES CACHE MASTER WS WS SNIFFER PASSIVE MONITOR RS485 ETHERNET

  30. Integration Data Sources > 90 % BUDGET Object Services Heat meters 5000 pcs. (70000 variables) Access Points 1000 pcs. Business Services ERP, CRM, DB, Accounting Data Services Communication Servers OPC, SQL, XML/HTML Thermal-PowerPlants 60 pcs. (1000 variables) Presentation Services Heating chambers, Pomp stations 25 pcs. (3000 variables) SCADA, Reports Corporate LAN

  31. Hydrostatic Thermostatic Hydrostatic P limit Hydrodynamic

  32. SYSTEM INTEGRATION SPM SOC TCH SOC TCH SOC SOC View View KDs SBs GIS SERVR Corporate field network Corporate network EC EC EC SCs

  33. SYSTEMS INTEGRATION SOC Kxxx Kxxx Kxxx Kxxx TCH SOC KOM TCH SOC SOC KOM View View SBk GIS SQL VLAN NAT SYM SERVER Corporate field network Corporate network EC EC EC WALL SCREEN OPC SQL

  34. GIS SMALLWORD OPC COMMSERVER SQL ORACLE OPC TRANSPORTER OPC TRANSPORTER STATISTIC PROCESSOR TRANSPORT ENGINE XML OPC SQL CONFIGURATION

  35. AUTOMATIC LOAD CONTROL ODBIORY ODBIORY PODZIAŁ EC - 3 EC - 2 P P P P G F 1 = const F 2 K - 101 K - 164 P P P P G F 3 F 4 UZUPEŁNIANIE UZUPEŁNIANIE SUW SUW

  36. Crash OPCS OPCS WS WS

  37. Solution OPCS OPCS WS WS Cooperation REPLACE Competition

  38. Solution CONTROL OPCS OPCS ISLAND OF AUTOMATION ISLAND OF AUTOMATION ISLAND OF AUTOMATION WS WS CONTROL MUTUALY ECLUSIVE

  39. THE MESSAGE IS: OPC CFIS SOC APP HARDWARE SOFTWARE INTEGRATION SKILLS TECHNOLOGY KNOWLEDGE DEVELOPMENT

  40. Commserver - Redundancy Active Wait for failure Standard solution – worse case Primary Station NO Connection !!! LAN Backup Station SERVICE