10 likes | 117 Views
Witness the high-speed charging process of trains at the Advanced Charging Station, where innovative variable duration technology enables quick charging of up to 560 nanoCoulombs. Experience the integration of CT signals, with ICT pulses and fast CT signals displayed in real-time. Take a closer look at the current transformer mechanism and learn about the efficient energy transfer system in operation.
E N D
Bunch Trains at the AWA Variable duration = 6 – 12 ns 8 bunches Train charge up to 560 nC Integrating CT signal Qtrain=560 nC Qbunch=35 nC 6.1 ns ICT pulse (V) 16 bunches Fast CT signal (odd pulses shown) time (ns) 12.3 ns CT = Current Transformer