An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 9186D Project Completion Report

  2. Project Summary Client: FAST / BHP Contract No.: 1646-P-50411

  3. Project Pictures – In House Fabrication INSERT TITLE HERE Scrubber Fabrication

  4. Project Pictures – In House Fabrication INSERT TITLE HERE Ducting Fabrication

  5. Project Pictures – Subcontract Fabrication Arch Engineering

  6. Project Pictures – Subcontract Fabrication Slurry Skid Steelwork Bendigo

  7. Project Pictures – Subcontract Fabrication Fans Turbo Air

  8. Project Pictures – Assembly

  9. Project Pictures – Site

  10. Project Summary Safety and Environment • Target – Nil Incident Actual – Nil incident • Comments • Working at Height • Rigging and Lifting

  11. Project Summary Scope of Works • Target - Original Contract Scope of Works Total Number of SCNs: 8 • Total Approved: 7 • Comments • 3 off Ventilation systems including fans and inlet ducting added to scope. • Variation received for fan access platforms for the UW144 scrubber fans. • Variation received for instrument and valve changes. • Negative variation received for changes to the CD5 slurry disposal system.

  12. Project Summary Schedule

  13. Project Summary Schedule • Comments • Most dates were met if you factor in delays from client. • Some delays in painting, pumps and flow meters. • Client pushed hard for delivery but it was not required onsite.

  14. Project Summary Budget and Margin

  15. Project Summary Budget and Margin • Original Contract Sum: $4,036,896 Expected Final $4,387,631 • Original Contract Margin $695,003 (17.2%) Expected Final $1,249,692 (28.5%) • Comments • Over budget items were: • Pumps and Valves • Construction Management • Scrubber Fabrication Labour (6%) • Under budget items were: • Fabrication Materials • Freight • Shop Supervision • Drafting

  16. Project Summary Quality • Target – Nil Quality Issues or NCRs Actual – 1 NCR • Comments • Threaded studs on access doors and panels breaking off.

  17. Project Summary Communications • Comments • Formal client communications were in the form of a monthly progress report. • Regular ongoing communication with FAST contact regarding technical and scheduling issues. • Internal progress meetings held weekly throughout duration of contract.

  18. Project Summary Client Satisfaction • Target – Score of 80% or above with Client Survey Form • Comments • Client satisfaction over all BHP SSA projects from recent KPI questionnaire had total score of 86.63%, an improvement on the previous year. • Scores over 90% for Safety, Management, Technical and Deliverables and Cost and Order Management.

  19. Project Summary Discussion Points • Design • Drafting • Procurement • In-house Fabrication • Subcontract Works • Assembly • Dispatch • Commissioning

  20. Project Summary Project Completion • Unfinished Business • Comments • Thank You Letter. • Bank Guarantees Return. • Future Business or Related Projects. • Aerison Procedures / Standard Drawings.