An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project PlanRoot Cause and Risk AnalysisTeam 2 NASA: Henning Leidecker; 301-286-9180 Boeing: Gary W. Bickel; 714-372-6820 2/25/00

  2. Team 2 Members • Project Leads: Henning Leidecker-NASA/GSFC • Gary W. Bickel-Boeing/HB • Team Members: Ray Prestridge-JSC • Pete Mueggler-BHB • Carol McDonald-BHOU • Anna Cantwell-SEA • David Gill-BHB • Jeanette Plante-GSFC • Dave Rothermel-BICC • Dale Zevotek-BICC • Martin Seifert-LSFT • David Beverly-JSC • Craig Mueller-AERO • Harold Battaglia-BHOU • John Canham-GSFC

  3. Task 1-Root Cause Analysis • Identify Primary Agent for “Rocket Engine Defect”--complete: HF-etch enabled by Polyimide void and carbon coating breech • Investigate Strength Reduction, ‘96 Cable--complete: 124/446 samples below Proof-Test level; Polyimide void consistently observed • need to complete microphotographs on approximately 34 samples • Investigate Strength Reduction, ‘98-9 Cable--partially complete • Determine source of Polyimide coating voids (fiber or other process) • Determine Agent (or process step) for carbon coating breech • Resolve Lingering Questions (Polyimide Canyons versus voids, SEM) • Complete Root Cause Analysis Report

  4. Task 1-Root Cause: status • Microphotos on 34 Samples-deferred • Strength Tests 98-9 Cable-on hold • Polyimide Coating Voids Source: no progress • Coating Penetration Test Plan in development • SEM to sort variations in Polyimide void structure: no progress • Root Cause Report: Major sections left to write

  5. Task 2-Risk AnalysisUS Lab and Node 1 • Estimate Potential Failures due to Rocket Engine Defects-- • Determine Effective “n” value--failed; insufficient data • Determine alternate model for failure prediction of existing defects/flaws • Estimate pre-flight and on-orbit failures based on strength distribution data • Determine Potential for Post-Process defect generation by Launch vibration impact • Determine Potential for on-orbit defect generation by Ionized Radiation • Prepare Risk Analysis Report for US Lab and Node 1

  6. Task 2-Risk Analysis: StatusUS Lab and Node 1 • Preliminary Risk Analysis Completed • No consensus on Preliminary Risk Analysis based on “worst case” n-value • Preparing proposal to do n-value tests for ESD attack on uncabled fiber • Efforts on vibration/ionizing radiation launch & on-orbit effects on-going

  7. Task 3-Risk Analysis & Reduction(Node 1 DT0 Cable, ESA Cable, all ‘98-9 Cable Use) • Determine Low Strength Distribution for ‘98-9 cable-- • Provide Preliminary Strength Tests on ESA Cable (representing ‘97 production)-- • Determine Effect of additional “Proof Testing” at the Cable level • Apply results of above in estimating risk • Prepare Risk Analysis Reports as needed for these tasks

  8. Task 3-Risk Analysis & Reduction: Status(Node 1 DT0 Cable, ESA Cable, all ‘98-9 Cable Use) • Strength Tests on 98-9 cable on hold • Tests on ESA cable pending receipt of cables and funding decisions • Proof Testing fixture in development

  9. Team 2--Schedule

  10. Team 2--Resources Required