An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Communications Implementation Team (DCIT)Departure Clearance Trials (DCL)Test StatusDCIT Meeting # 22 Washington, DC Presented to:D C I T By: Pete Muraca, FAA Date: March 13 - 14, 2013

  2. Agenda Test Activity to Date Boeing / Airbus Test Sessions E-E Functional and Operational Testing Environment Avionics Assets MEM Schedule Milestones Schedule Highlights DCL Trials – Test Status DCIT #22 (March 13 - 14, 2013)

  3. Test Activity to Date • Latest Build 6 was delivered to WJHTC 3/4/13: • Build 6 WJHTC Installation Complete: March 4 • Build 6 WJHTC Functional Testing: March 4-20 • Build 6 MEM Functional/Pre-SAT Testing: March 11-20 • Build 6 MEM Site Acceptance Test (SAT): March 21-22 DCL Trials – Test Status DCIT #22 (March 13 - 14, 2013) 3

  4. Boeing / AIRBUS Test Sessions • Boeing Test Sessions: • Boeing Test Session dates – 2/27, 3/1, 3/5, 3/6, 3/7, 3/8 • Boeing Test Benches utilized – B737, B747-800, B767, B777 • AIRBUS Test Sessions: • Airbus Test Session dates – 2/28, 3/5, 3/7 • Airbus Test Benches utilized – A340, A380 Week of March 11, 2013 MEM pre-SAT testing • MEM DTAP env with Tech Center avionics • MEM DTAP env with UPS / AOC • MEM DTAP env with FedEx / AOC MEM Pre-SAT Test Activities DCL Trials – Test Status DCIT #22 (March 13 - 14, 2013) 4

  5. End to End Functional Testing • DTAP Build 6 • Run system test cases with Tech Center bench avionics • Run system test cases with Boeing and Airbus labs (multiple flight deck configs) • Exercised test scenarios with DCIT aircraft • Conducted Regression testing • Documented / Socialized Findings • New PTRs Opened • 118,120,122,124,125,126,127,128,133 • Closed PTRs • 88,93,100,101,102,103,104,105,106,118,125,124,126,127 DCL Trials – Test Status DCIT #22 (March 13 - 14, 2013) 5

  6. Functional and Operational Test Env. • HADDS / FDIO connectivity and simulation capability • FNTB (via NESG) connectivity for external FAA communications • Ground/Ground and Air/Ground Communication service via ARINC • Ground/Ground and Air/Ground Communication service via SITA • Utilization of Boeing configurable flight deck • Utilization of Airbus configurable flight deck • Utilization of FAA Technical Center bench avionics • DCIT Aircraft Participation • Plans, Procedures and Personnel in place Lab Environment End to End Functional Testing End to End Operational Scenarios Testing (includes pilots & controller crew) FANS Avionics Platforms DCIT Aircraft (FedEx, United-Continental, UPS, Delta, AA, UsAir, Southwest) Site Acceptance Testing (Field Environment) Sub_set of Functional End to End Operational end to end scenarios FedEx Aircraft and AOC Participation 6

  7. Avionics Assets (FANS) External • Boeing Flight Deck (via subnetwork infrastructure and service (ARINC and SITA) • B737-ng • B777 • B747-400 • MD-11 • B787 • B767 • Airbus Flight Deck (via subnetwork infrastructure and service (ARINC and SITA) • A320 • A330 • A350 • A380 (FANS) DCIT Aircraft • FedEx • UPS • Delta • United (ATN Baseline 1 & SC-214 v. H) • Rockwell Collins prototype Avionics (Real Hardware) • Honeywell Avionics (Real Hardware) • Thales Avionics (PC based) Note: Planning for Lab FMS integrated avionics solution (FANS) In-House CMU based FANS 1/A+ avionics end system • Connected to roof antenna representing a target aircraft Laptop based FANS 1/A+ avionics end system • Can be connected to real avionics hardware (A750 Radio, A739 MCDU, A758 CMU) via A429 card 7

  8. MEM Schedule Milestones • The Milestone Schedule Outlook: • Build 6 WJHTC Installation Complete: March 4 • Build 6 WJHTC/MEM Functional/Pre-SAT Testing: March 4-20 • Build 6 MEM Functional/Pre-SAT Testing: March 11-20 • Build 6 MEM Site Acceptance Test (SAT): March 21-22 • MEM Limited Full Functionality Trials (3 Ops/day): March 26 – April 26 • MEM Full FANS Fleet 24x7 Trials Start: April 30 • 4pm Daily Build 6 Testing/PTR review telcon DCL Trials – Test Status DCIT #22 (March 13 - 14, 2013) 8

  9. DCL Trials – Test Status DCIT #22 (March 13 - 14, 2013) 9